U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Newfield, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Newfield, NY, New York, New York forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 21
Total length: 44 meters (144ft)
Total costs: $15,237,000
Total average daily traffic: 66,816
Total average daily truck traffic: 6,179
Total future (year 2018) average daily traffic: 84,987
National Bridge Inventory (NBI) Registered Bridges for Newfield

New bridges - Historical Statistics

  • Before 1900: 1
  • 1900-1909: 0
  • 1910-1919: 0
  • 1920-1929: 2
  • 1930-1939: 2
  • 1940-1949: 0
  • 1950-1959: 5
  • 1960-1969: 2
  • 1970-1979: 1
  • 1980-1989: 2
  • 1990-1999: 5
  • 2000-2009: 1

Reconstructed bridges - Historical Statistics

  • 1960-1969: 1
  • 1970-1979: 0
  • 1980-1989: 2
  • 1990-1999: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 101025,  Location: 0.6 MI NE 13 +SCHUYLER CL (Lat: 42.301319,  Lng: -76.681572),  Route carried "on" structure: State highway 13,  Year Built: 1960,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 8,490 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,339 (year 2027),  Design Load: HS 20,  Features Intersected: PONY HOLLOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.998,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $1,564,000,  Roadway Improvement Cost: $930,000,  Total Project Cost: $2,494,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 101026,  Location: .2 MI NE JCT SH13 & CR135 (Lat: 42.302856,  Lng: -76.679025),  Route carried "on" structure: State highway 13,  Year Built: 1959,  Status: Open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 8,490 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,339 (year 2027),  Design Load: HS 20,  Features Intersected: TB PONY HOLLOW CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.002,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $353,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $563,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 101027,  Location: 1.0 MI NE 13 +SCHUYLER CL (Lat: 42.304772,  Lng: -76.676758),  Route carried "on" structure: State highway 13,  Year Built: 1959,  Status: Open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 8,490 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,339 (year 2027),  Design Load: HS 20,  Features Intersected: CHAFFEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.002,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $354,000,  Roadway Improvement Cost: $211,000,  Total Project Cost: $565,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 101028,  Location: 2.1 MI NE 13 +SCHUYLER CL (Lat: 42.318300,  Lng: -76.663644),  Route carried "on" structure: State highway 13,  Year Built: 1959,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 8,490 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,339 (year 2027),  Design Load: HS 20,  Features Intersected: PONY HOLLOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $354,000,  Roadway Improvement Cost: $211,000,  Total Project Cost: $565,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 101029,  Location: 2.6 MI NE 13 +SCHUYLER CL (Lat: 42.323372,  Lng: -76.658269),  Route carried "on" structure: State highway 13,  Year Built: 1959,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 8,490 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,339 (year 2027),  Design Load: HS 20,  Features Intersected: CARTER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.002,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $354,000,  Roadway Improvement Cost: $211,000,  Total Project Cost: $565,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 102324,  Location: .9 MI SW JCT SH 34 & SH13 (Lat: 42.347086,  Lng: -76.540911),  Route carried "on" structure: State highway 96,  Year Built: 1990,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 3,410 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,774 (year 2026),  Design Load: HS 20,  Features Intersected: VAN BUSKIRK GULF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.778,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.5m (60.7ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $212,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $338,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 102325,  Location: 3.5 MI SW JCT SH34 & SH13 (Lat: 42.351097,  Lng: -76.543067),  Route carried "on" structure: State highway 34,  Year Built: 1990,  Status: Open,  Structure Length: 4.90m (16.08ft),  Average Daily Traffic: 3,410 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,774 (year 2026),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.664,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.1m (157.8ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Poor,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $1,179,000,  Roadway Improvement Cost: $701,000,  Total Project Cost: $1,880,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 102326,  Location: 3.3 MI SW JCT RTS 34 & 13 (Lat: 42.354394,  Lng: -76.545617),  Route carried "on" structure: State highway 96,  Year Built: 1990,  Status: Open,  Structure Length: 2.49m (8.17ft),  Average Daily Traffic: 3,410 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,774 (year 2026),  Design Load: HS 20,  Features Intersected: CAYUGA INLET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.676,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.7m (77.8ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $594,000,  Roadway Improvement Cost: $353,000,  Total Project Cost: $947,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 102327,  Location: 0.9 MI SW JCT RTS 34 & 13 (Lat: 42.385925,  Lng: -76.553803),  Route carried "on" structure: State highway 34,  Year Built: 1990,  Status: Open,  Structure Length: 9.38m (30.77ft),  Average Daily Traffic: 6,784 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,060 (year 2027),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN, CAYUGA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.936,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.38m (30.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $2,384,000,  Roadway Improvement Cost: $1,383,000,  Total Project Cost: $3,767,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 221014,  Location: 1.8 MI NE OF NEWFIELD (Lat: 42.374028,  Lng: -76.557522),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 1.09m (3.58ft),  Average Daily Traffic: 455 (year 1999),  Truck Traffic: 6%,  Average Future Daily Traffic: 571 (year 2019),  Features Intersected: W BR CAYUGA INLET,  Facility Carried by Structure: SHELTER VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.1m (16.7ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 80.1 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $192,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $306,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 225774,  Location: IN NEWFIELD (Lat: 42.363172,  Lng: -76.588342),  Route carried "on" structure: City street ,  Year Built: 1950,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,403 (year 2000),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,967 (year 2020),  Features Intersected: W BR CAYUGA INLET,  Facility Carried by Structure: MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 72.9 metric tons,  Inventory Rating: 19.5 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $192,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $306,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 321015,  Location: 2 MI NE OF NEWFIELD (Lat: 42.374044,  Lng: -76.554358),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 574 (year 1999),  Truck Traffic: 5%,  Average Future Daily Traffic: 721 (year 2019),  Features Intersected: CAYUGA INLET,  Facility Carried by Structure: SHELTER VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $145,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $231,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 321016,  Location: 1.0 MI N WEST DANBY (Lat: 42.347008,  Lng: -76.540142),  Route carried "on" structure: City street ,  Year Built: 1972,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 182 (year 2000),  Truck Traffic: 6%,  Average Future Daily Traffic: 229 (year 2020),  Features Intersected: CAYUGA INLET,  Facility Carried by Structure: BROWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.1m (16.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $145,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $231,000 ( Estimate for 2007),  Deck Structure Type: Concrete Precast Panels
Find on map >>

Structure Number: 321017,  Location: 4 MI SOUTH OF NEWFIELD (Lat: 42.314022,  Lng: -76.625050),  Route carried "on" structure: City street ,  Year Built: 1925,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 9 (year 1999),  Truck Traffic: 6%,  Average Future Daily Traffic: 11 (year 2019),  Features Intersected: CHAFFEE CREEK,  Facility Carried by Structure: CHAFFEE CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.3m (10.8ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $88,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $140,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 321018,  Location: 0.6 MILES NE CAYUGA (Lat: 42.287153,  Lng: -76.688933),  Route carried "on" structure: City street ,  Year Built: 1920,  Year Reconstructed: 1987,  Status: Posted for load,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 53 (year 2000),  Truck Traffic: 6%,  Average Future Daily Traffic: 67 (year 2020),  Features Intersected: PONY HOLLOW CREEK,  Facility Carried by Structure: MORRELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.3m (10.8ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 26.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: July 2007,  Critical Feature Inspection Date: July 2007,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $324,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 32102,  Location: 3.0 MI NE ALPINE (Lat: 42.357994,  Lng: -76.655972),  Route carried "on" structure: City street ,  Year Built: 1930,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 50 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 63 ,  Design Load: HS 20,  Features Intersected: CARTER CREEK,  Facility Carried by Structure: CARTER CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 3.6m (11.8ft),  Out-to-Out Width: 4.2m (13.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Excellent,  Inventory Rating: 88.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $324,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 321021,  Location: IN NEWFIELD (Lat: 42.363050,  Lng: -76.590417),  Route carried "on" structure: City street ,  Year Built: 1853,  Year Reconstructed: 1972,  Status: Posted for load,  Structure Length: 3.53m (11.58ft),  Average Daily Traffic: 398 (year 2000),  Truck Traffic: 6%,  Average Future Daily Traffic: 500 (year 2020),  Features Intersected: W.BR.CAYUGA INLET,  Facility Carried by Structure: COVERED BRIDGE ST
Minimum Vertical Clearance: 3.47m (11.38ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.1m (16.7ft),  Material/Design: Wood or Timber,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 5.0 metric tons,  Inventory Rating: 5.0 metric tons,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 3.53m (11.58ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: August 2007,  Critical Feature Inspection Date: August 2007,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $324,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 331438,  Location: 2MI NE OF NEWFIELD (Lat: 42.368800,  Lng: -76.554297),  Route carried "on" structure: County highway ,  Year Built: 1931,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 1,747 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,015 (year 2026),  Features Intersected: CAYUGA INLET,  Facility Carried by Structure: NEWFIELD DEPOT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 55.3 metric tons,  Inventory Rating: 20.2 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $311,000,  Roadway Improvement Cost: $185,000,  Total Project Cost: $496,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 336681,  Location: .2 M W JCT SH13 & BL HL R (Lat: 42.317633,  Lng: -76.666400),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 16 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 20 (year 2018),  Features Intersected: PONY HOLLOW CREEK,  Facility Carried by Structure: CONNECTICT HLL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.2m (13.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $205,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $327,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 336793,  Location: .5 MI E OF MAIN ST-NEWFLD (Lat: 42.362608,  Lng: -76.578983),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 769 (year 2000),  Truck Traffic: 8%,  Average Future Daily Traffic: 887 (year 2020),  Features Intersected: W BR CAYUGA INLET,  Facility Carried by Structure: NEWFIELD DEPOT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 76.4 metric tons,  Inventory Rating: 29.3 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $138,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $220,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 336993,  Location: 1 MI S OF TRUMBULL CORNRS (Lat: 42.380236,  Lng: -76.632619),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 696 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 859 (year 2026),  Design Load: HS 25,  Features Intersected: FISH CREEK,  Facility Carried by Structure: TRUMBULL CRNRS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 30.1m (98.8ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.9m (32.5ft),  Curb-To-Curb Width: 3.0m (9.8ft),  Out-to-Out Width: 3.4m (11.2ft)

Condition: Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 79.5 metric tons,  Inventory Rating: 40.8 metric tons,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $324,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular New York forum

Back to: Newfield, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.