  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 31m102ftTotal length
  • $43,988,000Total costs
  • 56,620Total average daily traffic
  • 3,818Total average daily truck traffic
  • 83,795Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Newport
  • No street view available for this location

New bridges in Newport, NH - Historical Statistics
  • New bridges - Historical Statistics
  • 1Before 1900
  • 11900-1909
  • 21930-1939
  • 31970-1979
  • 31980-1989
  • 21990-1999
  • 22000-2009
Reconstructed bridges in Newport, NH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 31980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Newport, NH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Excellent
  • 33.3%Very good
  • 33.3%Good
  • 8.3%Satisfactory
  • 8.3%Fair
  • 8.3%Poor
  • 8.3%Serious
  • 8.3%Critical
  • 8.3%Imminent failure
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 58.3%Excellent
  • 16.7%Very good
  • 16.7%Good
  • 8.3%Satisfactory
  • 8.3%Fair
  • 8.3%Poor
  • 8.3%Serious
  • 8.3%Critical
  • 8.3%Imminent failure
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Excellent
  • 25.0%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 8.3%Fair
  • 8.3%Poor
  • 8.3%Serious
  • 8.3%Critical
  • 8.3%Imminent failure
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.1%Excellent
  • 14.3%Very good
  • 57.1%Good
  • 14.3%Satisfactory
  • 7.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Excellent
  • 50.0%Very good
  • 50.0%Good
Find on map >>   Show street view

Structure Number: 192008100103,  Location: 2.01 MI. E. CLAREMONT TL (Lat: 43.364447,  Lng: -72.230319),  Route carried "on" structure: MainlineState highway 11,  Year Built: 2008,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 9,800 (year 2012),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,504 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: RAM BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.472,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 131.0m (429.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Inventory Rating: 74.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.40m (30.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2017,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2018),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 192008500101,  Location: 2.2 MI FROM CLAREMONT TL (Lat: 43.362203,  Lng: -72.224950),  Route carried "on" structure: MainlineState highway 11,  Year Built: 1998,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 10,000 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,800 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: SUGAR RIVER,PED TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.798,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 73.0m (239.5ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 51.8m (169.9ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 7.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 53.30m (174.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2017,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 192010300136,  Location: 0.4 MI FR NO. NEWPORT RD (Lat: 43.386569,  Lng: -72.207281),  Route carried "on" structure: Other road ,  Year Built: 1937,  Year Reconstructed: 1989,  Status: Posted for load-capacity,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 560 (year 2014),  Truck Traffic: 4%,  Average Future Daily Traffic: 828 (year 2038),  Design Load: H 15,  Features Intersected: SUGAR RIVER,  Facility Carried by Structure: OAK STREET
Minimum Vertical Clearance: 4.24m (13.91ft),  Kilometerpoint: 3.166,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 58.0m (190.3ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Poor,  Channel: Very good,  Operating Rating: 27.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 34.10m (111.88ft),  Designated Inspection Frequency: Every 16 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2017,  Critical Feature Inspection Date: October 2017,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2018),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 192011600142,  Location: .69 MI JCT NH 10 (Lat: 43.391069,  Lng: -72.195342),  Route carried "on" structure: State highway ,  Year Built: 1845,  Year Reconstructed: 1994,  Status: Posted for load,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 590 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 873 (year 2038),  Design Load: HS 20,  Features Intersected: CROYDON BRANCH SUGAR R,  Facility Carried by Structure: CORBIN BRIDGE ROAD
Minimum Vertical Clearance: 3.96m (12.99ft),  Kilometerpoint: 1.107,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 55.0m (180.4ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.3m (96.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 2.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 31.70m (104.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2017,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2018),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 192012900115,  Location: 0.5 MI FR NO. NEWPORT RD (Lat: 43.372183,  Lng: -72.181775),  Route carried "on" structure: Other road ,  Year Built: 1979,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 930 (year 2011),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,376 (year 2038),  Design Load: HS 20,  Features Intersected: SUGAR RIVER,  Facility Carried by Structure: OAK STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.034,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 91.0m (298.6ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 29.30m (96.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2016,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 192013100106,  Location: 0.2 MI FR NO. MAIN ST (Lat: 43.365364,  Lng: -72.180078),  Route carried "on" structure: Other road ,  Year Built: 1974,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 2.79m (9.15ft),  Average Daily Traffic: 980 (year 2014),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,450 (year 2038),  Design Load: HS 20,  Features Intersected: SUGAR RIVER,  Facility Carried by Structure: BELKNAP AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.023,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 64.0m (210.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 27.90m (91.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2016,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 192013700099,  Location: 5.2 MI FROM CLAREMONT TL (Lat: 43.361400,  Lng: -72.173936),  Route carried "on" structure: MainlineState highway 11,  Year Built: 1985,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 16,000 (year 2014),  Truck Traffic: 7%,  Average Future Daily Traffic: 23,680 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: SUGAR RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.712,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 171.0m (561.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 22.1m (72.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 32.90m (107.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2017,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 192013900076,  Location: 0.8 MI RTE 10 (Lat: 43.343586,  Lng: -72.174408),  Route carried "on" structure: Other road ,  Year Built: 2003,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 590 (year 2014),  Truck Traffic: 4%,  Average Future Daily Traffic: 873 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: SO BR SUGAR RIVER,  Facility Carried by Structure: POLLARDS MILLS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.053,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 88.0m (288.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 73.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 22.60m (74.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2016,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 192013900104,  Location: 5.4MI FROM CLAREMONT TL (Lat: 43.363094,  Lng: -72.172156),  Route carried "on" structure: MainlineState highway 10,  Year Built: 1930,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 13,000 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 19,240 (year 2038),  Design Load: H 15,  Features Intersected: SUGAR RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 85.308,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 1.4m (4.6ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 1.4m (4.6ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Inventory Rating: 70.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.50m (54.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2017,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 192014400104,  Location: 0.12 MI FR SUNAPEE ST (Lat: 43.363819,  Lng: -72.166500),  Route carried "on" structure: Other road ,  Year Built: 1983,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 2,800 (year 2014),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,144 (year 2038),  Features Intersected: SUGAR RIVER,  Facility Carried by Structure: CROSS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.072,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 0.7m (2.3ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Inventory Rating: 6.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.70m (58.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2016,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 192014700036,  Location: 390FT. RTE. 10 (Lat: 43.315250,  Lng: -72.168461),  Route carried "on" structure: Other road ,  Year Built: 1900,  Year Reconstructed: 1960,  Status: Temporarily open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 100 (year 1984),  Average Future Daily Traffic: 148 (year 2038),  Features Intersected: SO BR SUGAR RIVER,  Facility Carried by Structure: COON BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.071,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 55.0m (180.4ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Serious,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 22.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.80m (51.84ft),  Designated Inspection Frequency: Every 16 months,  Inspection Date: November 2017,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2018),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 192015400129,  Location: 1.4 MI. CROYDON TL (Lat: 43.380414,  Lng: -72.153861),  Route carried "on" structure: Other road ,  Year Built: 1984,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 190 (year 2014),  Truck Traffic: 4%,  Average Future Daily Traffic: 281 (year 2038),  Features Intersected: BROOK,  Facility Carried by Structure: SAND HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.089,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 67.0m (219.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 4.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.20m (26.90ft),  Designated Inspection Frequency: Every 16 months,  Inspection Date: November 2017,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2018),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 192017700117,  Location: 380 FT. RTE.11 (Lat: 43.374122,  Lng: -72.135483),  Route carried "on" structure: Other road ,  Year Built: 1976,  Status: Closed,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 200 (year 1984),  Truck Traffic: 4%,  Average Future Daily Traffic: 296 (year 2038),  Features Intersected: SUGAR RIVER,  Facility Carried by Structure: PARADISE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.101,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 49.0m (160.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Imminent failure,  Superstructure: Imminent failure,  Substructure: Imminent failure,  Channel: Fair,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 11.90m (39.04ft),  Designated Inspection Frequency: Every 16 months,  Inspection Date: November 2017,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2018),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 192018500115,  Location: 170 FT. SUNAPEE TL (Lat: 43.370561,  Lng: -72.126825),  Route carried "on" structure: Other road ,  Year Built: 1998,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 880 (year 2014),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,302 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: WENDELL BROOK,  Facility Carried by Structure: PARADISE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.842,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 73.0m (239.5ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 84.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.90m (25.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2016,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2018),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric