Bridge Statistics for Nitro, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 230ft / 69.7mTotal length
  • $4,150,000Total costs
  • 290,046Total average daily traffic
  • 50,123Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Nitro
  • No street view available for this location

New bridges in Nitro, WV - historical statistics
  • New bridges - historical statistics
  • 21940-1949
  • 11950-1959
  • 91960-1969
  • 11970-1979
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Nitro, WV
Average Bridge Truck Traffic in Nitro, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Satisfactory
  • 37.5%Fair
  • 12.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Very good
  • 37.5%Satisfactory
  • 37.5%Fair
  • 12.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Good
  • 25.0%Satisfactory
  • 50.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Excellent
  • 33.3%Very good
  • 33.3%Good
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 20A069,  Location: 0.17 MI E OF CR 25/10 (Lat: 38.385819,  Lng: -81.769469),  Route carried "on" structure: Ramp Interstate 64,  Year Built: 1965,  Status: Open,  Structure Length: 4.55m (14.93ft),  Average Daily Traffic: 68,700 (year 2018),  Truck Traffic: 21%,  Average Future Daily Traffic: 96,867 (year 2038),  Design Load: HS 20,  Features Intersected: WV25
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 80.467,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 13.8m (45.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.55m (14.93ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $1,100,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $1,400,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20A172,  Location: 0.04 MI W OF US 60 (Lat: 38.396150,  Lng: -81.859461),  Route carried "on" structure: County highway 6014,  Year Built: 1940,  Status: Open,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 5,300 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,466 (year 2039),  Features Intersected: TACKETT CREEK,  Facility Carried by Structure: CR 60/14 SLS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.031,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.68m (2.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $200,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20A714,  Location: 0.01 MI S OF CR 35/1 (Lat: 38.429889,  Lng: -81.828531),  Route carried "on" structure: County highway 357,  Year Built: 1972,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 61 (year 2039),  Features Intersected: ARMOUR CREEK,  Facility Carried by Structure: COUNTY ROUTE 35/7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 2.9m (9.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: 20A919,  Location: 0.02 MI N OF CR 25\1 (Lat: 38.422189,  Lng: -81.838519),  Route carried "on" structure: County highway 2568,  Year Built: 1950,  Status: Posted for load,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 100 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 122 (year 2038),  Features Intersected: BLAKE CREEK,  Facility Carried by Structure: THIRD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.9m (22.6ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 20.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.77m (2.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $450,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $500,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 40A075,  Location: 0.97 MI E OF US 35 (Lat: 38.440919,  Lng: -81.833200),  Route carried "on" structure: Interstate 64,  Year Built: 1961,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 9.19m (30.15ft),  Average Daily Traffic: 48,700 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 71,589 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: WV25, CR25/30, N&S RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 71.568,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 25.8m (84.6ft),  Out-to-Out Width: 27.8m (91.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.19m (30.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $250,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 40A076,  Location: 0.28 MI E OF US 35 (Lat: 38.445119,  Lng: -81.842419),  Route carried "on" structure: Interstate 64,  Year Built: 1962,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 42.68m (140.03ft),  Average Daily Traffic: 60,733 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 124,558 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: WV817,KANAWHA RV, CSX RR
Minimum Vertical Clearance: 6.00m (19.69ft),  Kilometerpoint: 70.457,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 18.9m (62.0ft), Horizontal Clearance: 138.1m (453.1ft)),  Material/Design: Steel continuous,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 171.5m (562.7ft),  Curb-To-Curb Width: 18.7m (61.4ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 42.67m (139.99ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2021,  Underwater Inspection Date: October 2018,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $4,000,000,  Roadway Improvement Cost: $1,000,000,  Total Project Cost: $500,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 40A087,  Location: 0.05 MI N OF CR 25/31 (Lat: 38.433750,  Lng: -81.826750),  Route carried "on" structure: County highway 2508,  Year Built: 1964,  Status: Open,  Structure Length: 6.15m (20.18ft),  Average Daily Traffic: 30 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 40 (year 2040),  Design Load: H 15,  Features Intersected: I-64 EB & WB,  Facility Carried by Structure: COUNTY ROUTE 25/8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.1m (59.4ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.15m (20.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $950,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,050,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 40A124,  Location: 0.13 MI E OF WV 25 (Lat: 38.427119,  Lng: -81.837361),  Route carried "on" structure: County highway 2536,  Year Built: 1998,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 100 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: BLAKE CREEK,  Facility Carried by Structure: COUNTY ROUTE 25/36
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 0.0m,  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 40A153,  Location: 0.13 MI E OF WV 25 (Lat: 38.431211,  Lng: -81.835231),  Route carried "on" structure: County highway 252,  Year Built: 2009,  Status: Open,  Structure Length: 3.49m (11.45ft),  Average Daily Traffic: 5,100 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,885 (year 2038),  Design Load: HL 93,  Features Intersected: ARMOUR CREEK,  Facility Carried by Structure: COUNTY ROUTE 25/2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.49m (11.45ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Critical Feature Inspection Date: January 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $250,000 ( Estimate for 2020),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20A069,  Location: 0.17 MI E OF CR 25/10 (Lat: 38.385819,  Lng: -81.769469),  Route carried "under" structure: State highway 2500,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 14,700 (year 0007),  Truck Traffic: 6%,  Features Intersected: WV25,  Facility Carried by Structure: I-64 RAMP B
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 9.415,  Lanes on structure: 1,  Lanes under structure: 2,  Length of Maximum Span: 13.8m (45.3ft)

Find on map >>   Show street view

Structure Number: 40A075,  Location: 0.97 MI E OF US 35 (Lat: 38.155400,  Lng: -81.300000),  Route carried "under" structure: County highway 2530,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 302 (year 0017),  Truck Traffic: 4%,  Features Intersected: WV25, CR25/30, N&S RR,  Facility Carried by Structure: I-64 EB & WB
Minimum Vertical Clearance: 7.14m (23.43ft),  Kilometerpoint: 1.802,  Lanes on structure: 6,  Lanes under structure: 2,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: 40A075,  Location: 0.97 MI E OF US 35 (Lat: 38.155400,  Lng: -81.300000),  Route carried "under" structure: State highway 2500,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 13,578 (year 0017),  Truck Traffic: 6%,  Features Intersected: WV25, CR25/30, N&S RR,  Facility Carried by Structure: I-64 EB & WB
Minimum Vertical Clearance: 6.78m (22.24ft),  Kilometerpoint: 1.802,  Lanes on structure: 6,  Lanes under structure: 4,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: 40A076,  Location: 0.28 MI E OF US 35 (Lat: 38.445119,  Lng: -81.842419),  Route carried "under" structure: US 81700,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 5,300 (year 0004),  Truck Traffic: 18%,  Features Intersected: WV817,KANAWHA RV, CSX RR,  Facility Carried by Structure: I-64
Minimum Vertical Clearance: 15.67m (51.41ft),  Kilometerpoint: 3.090,  Lanes on structure: 4,  Lanes under structure: 2,  Length of Maximum Span: 171.5m (562.7ft)

Find on map >>   Show street view

Structure Number: 40A087,  Location: 0.05 MI N OF CR 25/31 (Lat: 38.433750,  Lng: -81.826750),  Route carried "under" structure: Interstate 6400,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 60,753 (year 0015),  Truck Traffic: 24%,  Features Intersected: I-64 EB & WB,  Facility Carried by Structure: COUNTY ROUTE 25/8
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 72.549,  Lanes on structure: 2,  Lanes under structure: 4,  Length of Maximum Span: 18.1m (59.4ft)

Find on map >>   Show street view

Structure Number: 40A092,  Location: 1.40 MI N OF CR 33 (Lat: 38.449831,  Lng: -81.837239),  Route carried "under" structure: State highway 81700,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 6,600 (year 2019),  Truck Traffic: 6%,  Features Intersected: WV 817,  Facility Carried by Structure: CSX RR #CLG1.40-14
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 4.120,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.5m (60.7ft)

Discuss Nitro, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.