U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for North Norwich, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: North Norwich, NY, New York, New York forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 10
Total length: 18 meters (59ft)
Total costs: $6,492,000
Total average daily traffic: 40,900
Total average daily truck traffic: 3,149
Total future (year 2019) average daily traffic: 53,412
National Bridge Inventory (NBI) Registered Bridges for North Norwich

New bridges - Historical Statistics

  • 1920-1929: 2
  • 1930-1939: 2
  • 1940-1949: 1
  • 1950-1959: 1
  • 1960-1969: 0
  • 1970-1979: 2
  • 1980-1989: 0
  • 1990-1999: 1
  • 2000-2009: 1

Reconstructed bridges - Historical Statistics

  • 1950-1959: 1
  • 1960-1969: 2
  • 1970-1979: 0
  • 1980-1989: 2

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 100936,  Location: 4.5 MI N JCT RTS 12 + 23 (Lat: 42.601544,  Lng: -75.530189),  Route carried "on" structure: State highway 12,  Year Built: 1955,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 7,405 (year 2000),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,242 (year 2020),  Features Intersected: COLD BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.545,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $678,000,  Roadway Improvement Cost: $403,000,  Total Project Cost: $1,081,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 100938,  Location: IN N NORWICH (Lat: 42.618722,  Lng: -75.513664),  Route carried "on" structure: State highway 12,  Year Built: 1928,  Year Reconstructed: 1955,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 7,225 (year 2005),  Truck Traffic: 9%,  Average Future Daily Traffic: 9,867 (year 2025),  Design Load: H 20,  Features Intersected: CHEN RVR OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.637,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $678,000,  Roadway Improvement Cost: $403,000,  Total Project Cost: $1,081,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 100939,  Location: JCT RTE 12 + CHENANGO R (Lat: 42.618669,  Lng: -75.512264),  Route carried "on" structure: State highway 12,  Year Built: 1977,  Status: Open,  Structure Length: 10.27m (33.69ft),  Average Daily Traffic: 7,225 (year 2005),  Truck Traffic: 9%,  Average Future Daily Traffic: 9,867 (year 2025),  Design Load: HS 20,  Features Intersected: CHENANGO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.590,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.0m (55.8ft),  Skew: 29 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 48.7m (159.8ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 10.27m (33.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $678,000,  Roadway Improvement Cost: $403,000,  Total Project Cost: $1,081,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 10094,  Location: 3.1 MI S JCT RTS 12 + 80 (Lat: 42.638217,  Lng: -75.488725),  Route carried "on" structure: State highway 12,  Year Built: 1929,  Year Reconstructed: 1965,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 7,225 (year 2005),  Truck Traffic: 9%,  Average Future Daily Traffic: 9,867 (year 2025),  Design Load: H 20,  Features Intersected: WEST BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.639,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $678,000,  Roadway Improvement Cost: $403,000,  Total Project Cost: $1,081,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 104568,  Location: 11 MI NE JCT RTE 320 + 12 (Lat: 42.559369,  Lng: -75.507806),  Route carried "on" structure: State highway 320,  Year Built: 1938,  Year Reconstructed: 1965,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 1,697 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,010 (year 2026),  Design Load: H 20,  Features Intersected: THOMPSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.016,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $418,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 105448,  Location: 4.2 MI N JCT SH 12 & SH23 (Lat: 42.594339,  Lng: -75.529814),  Route carried "on" structure: State highway 12,  Year Built: 2000,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 7,405 (year 2000),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,242 (year 2020),  Design Load: HS 25,  Features Intersected: COLD BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.544,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 80.6 metric tons,  Inventory Rating: 40.8 metric tons,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.13m (3.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $316,000,  Roadway Improvement Cost: $188,000,  Total Project Cost: $504,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 222634,  Location: 2.6 MI SOUTH OF SHERBURNE (Lat: 42.636764,  Lng: -75.497369),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 138 (year 1999),  Truck Traffic: 6%,  Average Future Daily Traffic: 192 (year 2019),  Features Intersected: WEST BROOK,  Facility Carried by Structure: TRACY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Serious,  Culverts: Fair,  Operating Rating: 75.1 metric tons,  Inventory Rating: 36.7 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $140,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $223,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 335114,  Location: 4.4 MI SE OF SHERBURNE (Lat: 42.629861,  Lng: -75.460067),  Route carried "on" structure: City street ,  Year Built: 1947,  Status: Open,  Structure Length: 1.18m (3.87ft),  Average Daily Traffic: 97 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 135 (year 2025),  Design Load: H 20,  Features Intersected: WEST BROOK,  Facility Carried by Structure: CHURCH HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $214,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $341,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 335116,  Location: 5 MILES NE OF NORWICH (Lat: 42.590450,  Lng: -75.464917),  Route carried "on" structure: City street ,  Year Built: 1973,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 21 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 29 (year 2026),  Features Intersected: THOMPSON CREEK,  Facility Carried by Structure: MUDGE KING ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.2m (13.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $214,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $341,000 ( Estimate for 2007),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 335117,  Location: 3.25 MILES N OF NORWICH (Lat: 42.591189,  Lng: -75.520444),  Route carried "on" structure: County highway ,  Year Built: 1936,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,462 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,961 (year 2027),  Design Load: HS 20,  Features Intersected: WHAUPAUNAUCAU BRK,  Facility Carried by Structure: COUNTY ROAD 32
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $214,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $341,000 ( Estimate for 2007),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular New York forum

Back to: North Norwich, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.