Bridge Statistics for Northampton, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 50Number of bridges
  • 568ft / 173mTotal length
  • $155,853,000Total costs
  • 616,594Total average daily traffic
  • 39,502Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Northampton
  • No street view available for this location

New bridges in Northampton, MA - historical statistics
  • New bridges - historical statistics
  • 6Before 1900
  • 41920-1929
  • 11930-1939
  • 31940-1949
  • 41950-1959
  • 221960-1969
  • 11970-1979
  • 31990-1999
  • 32000-2009
  • 32010-2019
Reconstructed bridges in Northampton, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 01930-1939
  • 01940-1949
  • 11950-1959
  • 01960-1969
  • 11970-1979
  • 71980-1989
Average Bridge Daily Traffic in Northampton, MA
Average Bridge Truck Traffic in Northampton, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.4%Excellent
  • 4.9%Very good
  • 34.1%Good
  • 36.6%Satisfactory
  • 22.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 2.1%Excellent
  • 4.2%Very good
  • 14.6%Good
  • 33.3%Satisfactory
  • 35.4%Fair
  • 8.3%Poor
  • 2.1%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.1%Excellent
  • 25.0%Good
  • 33.3%Satisfactory
  • 25.0%Fair
  • 10.4%Poor
  • 2.1%Serious
  • 2.1%Imminent failure
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Very good
  • 48.0%Good
  • 16.0%Satisfactory
  • 8.0%Poor
  • 4.0%Serious
  • 4.0%Imminent failure
Find on map >>   Show street view

Structure Number: H1102512VDOTNBI,  Location: .2 M E JCT US 5 & ST 10 (Lat: 42.360225,  Lng: -72.634969),  Route carried "on" structure: City street ,  Year Built: 1963,  Status: Open,  Structure Length: 7.72m (25.33ft),  Average Daily Traffic: 13,319 (year 2014),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,054 (year 2031),  Design Load: H 20,  Features Intersected: RR BMRR,  Facility Carried by Structure: HWY ELM ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 48.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.80m (28.87ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $7,422,000,  Roadway Improvement Cost: $743,000,  Total Project Cost: $11,134,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: H1102612UDOTNBI,  Location: MM 27.3 ON I-91 (Lat: 42.360558,  Lng: -72.636733),  Route carried "on" structure: City street ,  Year Built: 1963,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 8.50m (27.89ft),  Average Daily Traffic: 20,172 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,190 (year 2031),  Design Load: H 20,  Features Intersected: I 91,  Facility Carried by Structure: HWY ELM ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.7m (38.4ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 19.9m (65.3ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.60m (28.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $4,831,000,  Roadway Improvement Cost: $484,000,  Total Project Cost: $7,247,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: H1102813DDOTNBI,  Location: MM 28.7 ON I-91 (Lat: 42.381744,  Lng: -72.631389),  Route carried "on" structure: City street ,  Year Built: 1963,  Status: Posted for load,  Structure Length: 7.79m (25.56ft),  Average Daily Traffic: 1,940 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 2,369 (year 2031),  Design Load: H 20,  Features Intersected: I 91,  Facility Carried by Structure: HWY CHESTNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 37.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.80m (25.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $3,830,000,  Roadway Improvement Cost: $384,000,  Total Project Cost: $5,746,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N190030V3DOTNBI,  Location: .1 M S JCT ST 9 (Lat: 42.316111,  Lng: -72.633700),  Route carried "on" structure: State highway 10,  Year Built: 1948,  Status: Open,  Structure Length: 3.04m (9.97ft),  Average Daily Traffic: 26,250 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 28,112 (year 2032),  Design Load: H 20,  Features Intersected: OTHER MANHAN RAIL TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.290,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 53.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,058,000,  Roadway Improvement Cost: $206,000,  Total Project Cost: $3,088,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N190110MJMUNNBI,  Location: 0.15 M N OF PROSPECT ST (Lat: 42.332056,  Lng: -72.645022),  Route carried "on" structure: City street ,  Year Built: 1890,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 7,682 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,265 (year 2031),  Design Load: H 20,  Features Intersected: OTHER NORTHAMPTON BK WAY,  Facility Carried by Structure: HWY JACKSON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.5m (24.6ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 69.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $312,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $469,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: N190190V2DOTNBI,  Location: .2 M S JCT ST 9 (Lat: 42.315136,  Lng: -72.633444),  Route carried "on" structure: State highway 10,  Year Built: 1948,  Status: Open,  Structure Length: 1.32m (4.33ft),  Average Daily Traffic: 27,026 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 27,638 (year 2032),  Design Load: H 20,  Features Intersected: HWY CLARK AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.129,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $930,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,396,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N1902111MDOTNBI,  Location: .4 MI W JCT ST 9 (Lat: 42.312903,  Lng: -72.640639),  Route carried "on" structure: State highway 66,  Year Built: 1924,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 11,767 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,420 (year 2031),  Design Load: HS 20,  Features Intersected: WATER MILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.227,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 70.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: June 2020,  Underwater Inspection Date: September 2019,  Bridge Improvement Cost: $1,971,000,  Roadway Improvement Cost: $198,000,  Total Project Cost: $2,957,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: N190238RLMUNNBI,  Location: .05M S OF RT9 IN FLORENCE (Lat: 42.329083,  Lng: -72.675244),  Route carried "on" structure: City street ,  Year Built: 2005,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 3,103 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,986 (year 2033),  Design Load: HS 25 or greater,  Features Intersected: WATER MILL RIVER,  Facility Carried by Structure: HWY BLISS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 78.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $2,277,000,  Roadway Improvement Cost: $228,000,  Total Project Cost: $3,416,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N190240MEMUNNBI,  Location: 300' E INT FLORENCE RD (Lat: 42.330639,  Lng: -72.678944),  Route carried "on" structure: City street ,  Year Built: 1850,  Year Reconstructed: 1961,  Status: Temporarily open,  Structure Length: 2.95m (9.68ft),  Average Daily Traffic: 14,741 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 35,945 (year 2031),  Design Load: H 20,  Features Intersected: WATER MILL RIVER,  Facility Carried by Structure: HWY PINE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.4m (93.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 61.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $1,532,000,  Roadway Improvement Cost: $154,000,  Total Project Cost: $2,299,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N190250MGMUNNBI,  Location: 125' W OF JCT. CORTICELLI (Lat: 42.334056,  Lng: -72.677489),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Open,  Structure Length: 2.18m (7.15ft),  Average Daily Traffic: 3,571 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,269 (year 2032),  Design Load: H 20,  Features Intersected: WATER MILL RIVER,  Facility Carried by Structure: HWY MEADOW ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,017,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,526,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N190260MPMUNNBI,  Location: JCT ARCH ST (Lat: 42.347694,  Lng: -72.700750),  Route carried "on" structure: City street ,  Year Built: 1925,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 1,500 (year 2018),  Average Future Daily Traffic: 4,738 (year 2031),  Features Intersected: WATER MILL RIVER,  Facility Carried by Structure: HWY MAIN ST LEED
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 74.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,332,000,  Roadway Improvement Cost: $234,000,  Total Project Cost: $3,499,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N190260MQMUNNBI,  Location: JCT ARCH ST (Lat: 42.347444,  Lng: -72.700722),  Route carried "on" structure: City street ,  Year Built: 1850,  Year Reconstructed: 1925,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,500 (year 2018),  Average Future Daily Traffic: 4,738 (year 2031),  Features Intersected: WATER SLUICEWAY,  Facility Carried by Structure: HWY MAIN ST LEED
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.3m (27.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 38.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $362,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $544,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N190280MFMUNNBI,  Location: AT MILL RIVER (Lat: 42.353986,  Lng: -72.700950),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 2.54m (8.33ft),  Average Daily Traffic: 4,525 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,576 (year 2031),  Design Load: HS 20,  Features Intersected: WATER MILL RIVER,  Facility Carried by Structure: HWY MULBERRY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,195,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $1,793,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N19029B7PMUNNBI,  Location: .08 M S WLLMSBRG TOWN-LIN (Lat: 42.366622,  Lng: -72.702531),  Route carried "on" structure: City street ,  Year Built: 2012,  Status: Open,  Structure Length: 3.40m (11.15ft),  Average Daily Traffic: 1,200 (year 2003),  Truck Traffic: 2%,  Design Load: HS 25 or greater,  Features Intersected: WATER MILL RIVER,  Facility Carried by Structure: HWY RIVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.400,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.5m (103.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 77.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,606,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $2,410,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N190300RDMUNNBI,  Location: 0.1M S OF RESERVOIR RD (Lat: 42.354033,  Lng: -72.703014),  Route carried "on" structure: City street ,  Year Built: 1929,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 259 (year 2001),  Truck Traffic: 6%,  Average Future Daily Traffic: 409 (year 2032),  Features Intersected: WATER ROBERTS MEADOW BRK,  Facility Carried by Structure: HWY WATER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 73.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 52.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $358,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $538,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: N190310MNMUNNBI,  Location: 300 FT WEST OF WATER ST (Lat: 42.353811,  Lng: -72.705608),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 1,163 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,037 (year 2032),  Design Load: H 20,  Features Intersected: WATER ROBERTS MEADOW BRK,  Facility Carried by Structure: HWY RESERVOIR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $949,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,424,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N19033AMXMUNNBI,  Location: AT INT MONTAGUE RD (Lat: 42.336350,  Lng: -72.736303),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 1.44m (4.72ft),  Average Daily Traffic: 1,940 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,580 (year 2032),  Design Load: HS 20,  Features Intersected: WATER ROBERTS MEADOW BRK,  Facility Carried by Structure: HWY CHESTFLD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.4m (47.2ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Good,  Inventory Rating: 78.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $948,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,423,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: N19035BDBMUNNBI,  Location: 1MI E OF WSTHMPTN (Lat: 42.339361,  Lng: -72.725083),  Route carried "on" structure: City street ,  Year Built: 2013,  Status: Open,  Structure Length: 1.39m (4.56ft),  Average Daily Traffic: 1,500 (year 2003),  Truck Traffic: 6%,  Design Load: HL 93,  Features Intersected: WATER ROBERTS MEADOW BRK,  Facility Carried by Structure: HWY KENNEDY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.0m (29.5ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $806,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $1,210,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N190370RHMUNNBI,  Location: 1MI S OF RT66 BY EHMPTN (Lat: 42.294167,  Lng: -72.686150),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,422 (year 2015),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,859 (year 2032),  Design Load: H 20,  Features Intersected: WATER BASSETT BROOK,  Facility Carried by Structure: HWY PARK HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.591,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Inventory Rating: 62.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $467,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $701,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N19038AM6MUNNBI,  Location: 0.75 MI W FLORENCE RD (Lat: 42.302750,  Lng: -72.687750),  Route carried "on" structure: State highway 66,  Year Built: 2010,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 6,466 (year 2018),  Truck Traffic: 2%,  Design Load: HS 25 or greater,  Features Intersected: WATER BASSET BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.380,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.2m (33.5ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Inventory Rating: 85.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 45 months,  Inspection Date: June 2020,  Underwater Inspection Date: July 2018,  Bridge Improvement Cost: $408,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $613,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N19040AN0MUNNBI,  Location: 1MI S OF RT66 BY WHMPTN (Lat: 42.288714,  Lng: -72.734889),  Route carried "on" structure: City street ,  Year Built: 1998,  Status: Open,  Structure Length: 1.36m (4.46ft),  Average Daily Traffic: 259 (year 2018),  Average Future Daily Traffic: 2,859 (year 2031),  Design Load: HS 20,  Features Intersected: WATER N BR MANHAN RIVER,  Facility Carried by Structure: HWY DRURY LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 76.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $647,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $971,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N19041AM5DOTNBI,  Location: AT JCT LOUDVILLE RD. (Lat: 42.293922,  Lng: -72.734561),  Route carried "on" structure: State highway 66,  Year Built: 2003,  Status: Open,  Structure Length: 2.18m (7.15ft),  Average Daily Traffic: 4,525 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 9,476 (year 2031),  Design Load: HS 20,  Features Intersected: WATER N BR MANHAN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.594,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 80.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $747,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $1,121,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N190420UVDOTNBI,  Location: .9 M W JCT FLORENCE ST. (Lat: 42.362192,  Lng: -72.693839),  Route carried "on" structure: State highway 9,  Year Built: 1957,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 19,655 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 17,154 (year 2032),  Design Load: H 20,  Features Intersected: WATER BEAVER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.622,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $640,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $961,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N190450MLMUNNBI,  Location: 0.1 MI N OF ARCH ST (Lat: 42.350164,  Lng: -72.701050),  Route carried "on" structure: City street ,  Year Built: 1925,  Year Reconstructed: 1989,  Status: Posted for load,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 2,008 (year 2005),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,171 (year 2031),  Features Intersected: WATER MILL RIVER,  Facility Carried by Structure: HWY MAIN ST LEED
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: September 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $535,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $803,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: N190460MKMUNNBI,  Location: 200' N OF ARCH ST (Lat: 42.348761,  Lng: -72.700456),  Route carried "on" structure: City street ,  Year Built: 1850,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 2,008 (year 2005),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,710 (year 2031),  Features Intersected: WATER S CHANNEL MILL RIV,  Facility Carried by Structure: HWY MAIN ST LEED
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.869,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Superstructure: Poor,  Substructure: Fair,  Channel: Poor,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 36 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Underwater Inspection Date: August 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $486,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $730,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: N190460MRMUNNBI,  Location: 200' N OF ARCH ST (Lat: 42.348961,  Lng: -72.700544),  Route carried "on" structure: City street ,  Year Built: 1850,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,008 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,171 (year 2031),  Features Intersected: WATER N CHANNEL MILL RIV,  Facility Carried by Structure: HWY MAIN ST LEED
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.901,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Superstructure: Poor,  Substructure: Serious,  Channel: Serious,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 6 months,  Underwater Inspection Frequency: Every 6 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Underwater Inspection Date: Febuary 2022,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $205,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $308,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N190470MHMUNNBI,  Location: AT MILL RIVER (Lat: 42.319150,  Lng: -72.664997),  Route carried "on" structure: City street ,  Year Built: 1894,  Year Reconstructed: 1993,  Status: Posted for load,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 5,800 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,476 (year 2031),  Features Intersected: WATER MILL RIVER,  Facility Carried by Structure: HWY CLEMENT ST
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.418,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.0m (95.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Satisfactory,  Superstructure: Serious,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 35.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 6 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $2,881,000,  Roadway Improvement Cost: $289,000,  Total Project Cost: $4,322,000 ( Estimate for 2022),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N190530V1DOTNBI,  Location: 1.2 M S JCT ST 9 (Lat: 42.306267,  Lng: -72.646433),  Route carried "on" structure: State highway 10,  Year Built: 1939,  Status: Open,  Structure Length: 3.21m (10.53ft),  Average Daily Traffic: 13,205 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 23,502 (year 2031),  Design Load: H 20,  Features Intersected: WATER MILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.938,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.3m (50.2ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 46.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: June 2020,  Underwater Inspection Date: January 2022,  Bridge Improvement Cost: $2,243,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $3,365,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N190540MTMUNNBI,  Location: AT PARSONS BROOK (Lat: 42.308817,  Lng: -72.714844),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.80m (2.62ft),  Average Daily Traffic: 4,138 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,101 (year 2031),  Design Load: H 20,  Features Intersected: WATER PARSONS BROOK,  Facility Carried by Structure: HWY RYAN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 64.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $365,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $548,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N190560YXDOTNBI,  Location: 400' SW OF FERRY AVE (Lat: 42.291867,  Lng: -72.628097),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 27,446 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 37,035 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY ISLAND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.825,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,021,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,532,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: N190560YYDOTNBI,  Location: .4 M N EASTHAMPTON T.L. (Lat: 42.292058,  Lng: -72.627831),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 27,903 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 37,035 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY ISLAND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.825,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,021,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,532,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: N19059100DOTNBI,  Location: MM 22.8 ON I-91 (Lat: 42.308339,  Lng: -72.622953),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Temporarily open,  Structure Length: 13.42m (44.03ft),  Average Daily Traffic: 29,780 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 31,665 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: COMB US 5 & PANAMRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.853,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 54.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.50m (44.29ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $7,159,000,  Roadway Improvement Cost: $716,000,  Total Project Cost: $10,739,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N19059101DOTNBI,  Location: MM 22.8 ON I-91 (Lat: 42.307908,  Lng: -72.622917),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Temporarily open,  Structure Length: 13.42m (44.03ft),  Average Daily Traffic: 24,000 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 31,665 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: COMB US 5 & PANAMRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.853,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 25.5m (83.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 52.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.30m (46.92ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $15,206,000,  Roadway Improvement Cost: $1,521,000,  Total Project Cost: $22,810,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N19060102DOTNBI,  Location: MM 23.1 ON I-91 NB (Lat: 42.311658,  Lng: -72.619431),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Temporarily open,  Structure Length: 2.67m (8.76ft),  Average Daily Traffic: 23,955 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 31,665 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: HWY HOCKANUM RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.336,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $1,432,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $2,149,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: N19060103DOTNBI,  Location: MM 23.1 ON I-91 NB (Lat: 42.311864,  Lng: -72.619669),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 2.67m (8.76ft),  Average Daily Traffic: 29,398 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 57,076 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: HWY HOCKANUM RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.336,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $1,432,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $2,149,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: N19061104DOTNBI,  Location: MM 24.3 ON I-91 NB (Lat: 42.327675,  Lng: -72.616697),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 36,140 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 31,665 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: HWY OLD FERRY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.106,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.8m (84.6ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,432,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $2,149,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: N19061105DOTNBI,  Location: MM 24.3 ON I-91 SB (Lat: 42.327725,  Lng: -72.617092),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 36,140 (year 2018),  Average Future Daily Traffic: 31,665 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: HWY OLD FERRY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.106,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.8m (84.6ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 56.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,432,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $2,149,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric