![]() |
Bridge Statistics for Northumberland, New Hampshire (NH) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Northumberland, NH, New Hampshire, New Hampshire forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 11 Total length: 29 meters (95ft) Total costs: $15,000,000 Total average daily traffic: 21,391 Total average daily truck traffic: 1,338 National Bridge Inventory (NBI) Registered Bridges for Northumberland
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 198007000093, Location: 2.2 MI FROM STRATFORD TL (Lat: 44.615736, Lng: -71.536839), Route carried "on" structure: US 3, Year Built: 1959, Status: Open, Structure Length: 2.07m (6.79ft), Average Daily Traffic: 3,271 (year 2005), Truck Traffic: 7%, Average Future Daily Traffic: 4,841 (year 2026), Design Load: HS 20, Features Intersected: SL&ARR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 13.181, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 12.5m (41.0ft), Skew: 6 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 20.7m (67.9ft) Condition: Culverts: Good, Operating Rating: 45.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.07m (6.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008) Find on map >>
Structure Number: 198009300122, Location: 1.5 MI FROM STARK TL (Lat: 44.606314, Lng: -71.506208), Route carried "on" structure: Other road , Year Built: 1937, Status: Open, Structure Length: 1.52m (4.99ft), Features Intersected: NH110, Facility Carried by Structure: SL&ARR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.754, Lanes on structure: 1, Lanes under structure: 2, Owner: Railroad, Approaching Roadway Width: 3.0m (9.8ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 13.7m (44.9ft), Curb-To-Curb Width: 3.0m (9.8ft), Out-to-Out Width: 4.1m (13.5ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Good, Operating Rating: 45.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.52m (4.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008), Deck Structure Type: Concrete Precast Panels Find on map >>
Structure Number: 19801040012, Location: 2.4 MI FROM STARK TL (Lat: 44.595742, Lng: -71.507575), Route carried "on" structure: State highway 110, Year Built: 1962, Status: Open, Structure Length: 1.04m (3.41ft), Average Daily Traffic: 2,200 (year 1993), Truck Traffic: 4%, Average Future Daily Traffic: 3,256 (year 2026), Design Load: HS 20, Features Intersected: ROARING BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.386, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 10.1m (33.1ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.4m (34.1ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 60.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.04m (3.41ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008) Find on map >>
Structure Number: 198010600112, Location: 4.4 MI FROM LANCASTER TL (Lat: 44.594783, Lng: -71.511433), Route carried "on" structure: US 3, Year Built: 1995, Status: Open, Structure Length: 7.16m (23.49ft), Average Daily Traffic: 7,400 (year 2005), Truck Traffic: 7%, Average Future Daily Traffic: 10,952 (year 2026), Design Load: HS 25, Features Intersected: UPPER AMMONOOSUC RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 9.849, Lanes on structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 15.2m (49.9ft), Skew: 3 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 35.1m (115.2ft), Curb or Sidewalk Widths: Left: 1.6m (5.2ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 15.1m (49.5ft), Out-to-Out Width: 17.5m (57.4ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Channel: Good, Operating Rating: 59.4 metric tons, Inventory Rating: 40.8 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.16m (23.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 198010600113, Location: .1 MI.E.RT.3 (Lat: 44.595478, Lng: -71.510433), Route carried "on" structure: Other road OLDRD, Year Built: 1852, Status: Closed, Structure Length: 4.02m (13.19ft), Features Intersected: UPPER AMMONOOSUC RIVER, Facility Carried by Structure: BYPASSED HISTORIC Minimum Vertical Clearance: 3.81m (12.50ft), Kilometerpoint: 0.002, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Material/Design: Wood or Timber, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Length of Maximum Span: 38.4m (126.0ft), Curb-To-Curb Width: 4.0m (13.1ft), Out-to-Out Width: 5.5m (18.0ft) Condition: Deck: Imminent failure, Superstructure: Imminent failure, Substructure: Imminent failure, Channel: Good, Waterway Adequacy: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 4.02m (13.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Wood or Timber Find on map >>
Structure Number: 198010700122, Location: 0.3 MI E NH RTE 110 (Lat: 44.594950, Lng: -71.502861), Route carried "on" structure: State highway , Year Built: 1956, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 220 (year 1985), Truck Traffic: 10%, Average Future Daily Traffic: 326 (year 2026), Design Load: HS 15, Features Intersected: ROARING BROOK, Facility Carried by Structure: WINTER STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.515, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.5m (24.6ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 72.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.85m (2.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 198010800114, Location: 2.55 MI WEST OF START TL (Lat: 44.595892, Lng: -71.508536), Route carried "on" structure: City street , Year Built: 1991, Status: Closed, Structure Length: 0.46m (1.51ft), Average Daily Traffic: 100 (year 1987), Truck Traffic: 4%, Average Future Daily Traffic: 148 (year 2026), Features Intersected: ROARING BROOK, Facility Carried by Structure: BROOKLYN STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.048, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 2.1m (6.9ft) Condition: Channel: Poor, Culverts: Imminent failure, Waterway Adequacy: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 0.46m (1.51ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008) Find on map >>
Structure Number: 198014100059, Location: VERMONT STATE LINE (Lat: 44.564228, Lng: -71.558678), Route carried "on" structure: State highway , Year Built: 1984, Status: Open, Structure Length: 9.57m (31.40ft), Average Daily Traffic: 700 (year 1984), Truck Traffic: 4%, Average Future Daily Traffic: 1,036 (year 2026), Design Load: HS 20+Mod, Features Intersected: CONNECTICUT RIVER, Facility Carried by Structure: GUILDHALL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.080, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 35.4m (116.1ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 8.9m (29.2ft), Out-to-Out Width: 11.4m (37.4ft) Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Good, Channel: Satisfactory, Operating Rating: 44.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.57m (31.40ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 24 months, Inspection Date: July 2006, Underwater Inspection Date: April 1996, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 198014200068, Location: 3.1 MI N LANCASTER TL (Lat: 44.566231, Lng: -71.551289), Route carried "on" structure: US 3, Year Built: 1946, Status: Open, Structure Length: 0.37m (1.21ft), Average Daily Traffic: 4,600 (year 1991), Truck Traffic: 7%, Average Future Daily Traffic: 6,808 (year 2026), Design Load: H 20, Features Intersected: DEAN BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.973, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 3.7m (12.1ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 89.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.37m (1.21ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008) Find on map >>
Structure Number: 198022300118, Location: 0.18 MI N LANCASTER TL (Lat: 44.511453, Lng: -71.489169), Route carried "on" structure: State highway , Year Built: 1925, Year Reconstructed: 1954, Status: Open, Structure Length: 0.49m (1.61ft), Average Daily Traffic: 200 (year 1990), Truck Traffic: 10%, Average Future Daily Traffic: 296 (year 2026), Features Intersected: FOX BROOK, Facility Carried by Structure: LOST NATION ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 12.392, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 5.8m (19.0ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 4.3m (14.1ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.4m (27.6ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Channel: Good, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 0.49m (1.61ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $1,000,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,500,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 198009300122, Location: 1.5 MI FROM STARK TL (Lat: 44.606314, Lng: -71.506208), Route carried "under" structure: State highway 110, Year Built: 1937, Structure Length: 1.52m (4.99ft), Average Daily Traffic: 2,700 (year 2004), Truck Traffic: 4%, Features Intersected: NH110, Facility Carried by Structure: SL&ARR Minimum Vertical Clearance: 4.36m (14.30ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 13.7m (44.9ft) Discuss this city on our hugely popular New Hampshire forum Back to: Northumberland, NH, New Hampshire, All US cities.
|
![]() |