National Bridge Inventory (NBI) Statistics
Number of bridges: 94
Total length: 1,257 meters (4,124ft)
Total costs: $14,126,000
Total average daily traffic: 8,162,805
Total average daily truck traffic: 446,084
National Bridge Inventory (NBI) Registered Bridges for Norwalk

New bridges - Historical Statistics

  • 1930-1939: 1
  • 1940-1949: 0
  • 1950-1959: 31
  • 1960-1969: 20
  • 1970-1979: 0
  • 1980-1989: 6
  • 1990-1999: 36

Reconstructed bridges - Historical Statistics

  • 1950-1959: 4
  • 1960-1969: 0
  • 1970-1979: 0
  • 1980-1989: 8
  • 1990-1999: 1

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 53 0214,  Location: 07-LA-005-2.41-NRW (Lat: 33.893333,  Lng: -118.041667),  Route carried "on" structure: City street L095,  Year Built: 1955,  Status: Open,  Structure Length: 10.45m (34.28ft),  Average Daily Traffic: 33,500 (year 2000),  Truck Traffic: 4%,  Average Future Daily Traffic: 51,520 (year 2029),  Design Load: HS 20,  Features Intersected: ROUTE 5,  Facility Carried by Structure: CARMENITA RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 11,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.45m (34.28ft),  Designated Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: January 2007,  Other Special Inspection Date: May 2002,  Bridge Improvement Cost: $585,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $878,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 0593,  Location: 07-LA-005-4.91-NRW (Lat: 33.918333,  Lng: -118.080000),  Route carried "on" structure: Interstate 5,  Year Built: 1954,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 5.09m (16.70ft),  Average Daily Traffic: 180,500 (year 2000),  Truck Traffic: 11%,  Average Future Daily Traffic: 211,645 (year 2029),  Design Load: HS 20,  Features Intersected: IMPERIAL HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.910,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 23 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 28.5m (93.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 5.09m (16.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,741,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $2,611,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 0594,  Location: 07-LA-005-4.41-NRW (Lat: 33.911667,  Lng: -118.071667),  Route carried "on" structure: Interstate 5,  Year Built: 1954,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 237,000 (year 2000),  Truck Traffic: 9%,  Average Future Daily Traffic: 301,187 (year 2029),  Design Load: HS 20,  Features Intersected: SAN ANTONIO DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.410,  Lanes on structure: 7,  Lanes under structure: 5,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 32.2m (105.6ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.51m (14.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,743,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $2,614,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 0634L,  Location: 07-LA-005-3.44-NRW (Lat: 33.901667,  Lng: -118.061667),  Route carried "on" structure: Interstate 5,  Year Built: 1954,  Status: Open,  Structure Length: 6.49m (21.29ft),  Average Daily Traffic: 118,500 (year 2000),  Truck Traffic: 9%,  Average Future Daily Traffic: 150,593 (year 2029),  Design Load: HS 20,  Features Intersected: ROSECRANS AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.440,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 5 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 6.49m (21.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $568,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $852,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 0634R,  Location: 07-LA-005-3.44-NRW (Lat: 33.901667,  Lng: -118.061667),  Route carried "on" structure: Interstate 5,  Year Built: 1954,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 118,500 (year 2000),  Truck Traffic: 9%,  Average Future Daily Traffic: 150,593 (year 2029),  Design Load: HS 20,  Features Intersected: ROSECRANS AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.440,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $449,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $673,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 0813,  Location: 07-LA-005-5.92-NRW (Lat: 33.930000,  Lng: -118.090000),  Route carried "on" structure: Interstate 5,  Year Built: 1953,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 237,000 (year 2000),  Truck Traffic: 9%,  Average Future Daily Traffic: 301,187 (year 2029),  Design Load: HS 20,  Features Intersected: UP RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.920,  Lanes on structure: 7,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.0m,  Curb-To-Curb Width: 28.1m (92.2ft),  Out-to-Out Width: 31.8m (104.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 81.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 0814L,  Location: 07-LA-005-3.64-NRW (Lat: 33.903333,  Lng: -118.063333),  Route carried "on" structure: Interstate 5,  Year Built: 1954,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 118,500 (year 2000),  Truck Traffic: 9%,  Average Future Daily Traffic: 150,593 (year 2029),  Design Load: HS 20,  Features Intersected: SB5-FIRESTONE BL OFF-RMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.640,  Lanes on structure: 3,  Lanes under structure: 1,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $535,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $802,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 0844,  Location: 07-LA-005-5.12-NRW (Lat: 33.920000,  Lng: -118.081667),  Route carried "on" structure: Interstate 5,  Year Built: 1954,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 9.36m (30.71ft),  Average Daily Traffic: 237,000 (year 2000),  Truck Traffic: 9%,  Average Future Daily Traffic: 301,187 (year 2029),  Design Load: HS 20,  Features Intersected: PIONEER BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.120,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 36 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 28.5m (93.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 9.36m (30.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $3,201,000,  Roadway Improvement Cost: $320,000,  Total Project Cost: $4,802,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 1015,  Location: 07-LA-005-3.04-NRW (Lat: 33.898333,  Lng: -118.055000),  Route carried "on" structure: City street L158,  Year Built: 1955,  Status: Open,  Structure Length: 10.64m (34.91ft),  Average Daily Traffic: 8,000 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 14,013 (year 2029),  Design Load: HS 20,  Features Intersected: INTERSTATE 5,  Facility Carried by Structure: SHOEMAKER AVENUE
Minimum Vertical Clearance: 99.90m (327.76ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 11,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 10.64m (34.91ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: January 2007,  Other Special Inspection Date: May 2002,  Bridge Improvement Cost: $596,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $894,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 1049,  Location: 07-LA-005-4.87-NRW (Lat: 33.916667,  Lng: -118.078333),  Route carried "on" structure: Interstate 5,  Year Built: 1954,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 237,000 (year 2000),  Truck Traffic: 9%,  Average Future Daily Traffic: 301,187 (year 2029),  Design Load: HS 20,  Features Intersected: IMPERIAL HY STORM DRAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.870,  Lanes on structure: 7,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 31.7m (104.0ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 1.8m (5.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.0m,  Curb-To-Curb Width: 31.7m (104.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 53 105,  Location: 07-LA-005-4.66-NRW (Lat: 33.913333,  Lng: -118.075000),  Route carried "on" structure: Interstate 5,  Year Built: 1954,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 237,000 (year 2000),  Truck Traffic: 9%,  Average Future Daily Traffic: 301,187 (year 2029),  Design Load: HS 20,  Features Intersected: PADDISON AVE STORM DRAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.660,  Lanes on structure: 7,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 29.6m (97.1ft),  Skew: 33 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 29.6m (97.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007
Find on map >>

Structure Number: 53 1051,  Location: 07-LA-005-3.98-NRW (Lat: 33.908333,  Lng: -118.068333),  Route carried "on" structure: Interstate 5,  Year Built: 1954,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 237,000 (year 2000),  Truck Traffic: 9%,  Average Future Daily Traffic: 301,187 (year 2029),  Design Load: HS 20,  Features Intersected: SILVER BOW AVE STORM DRN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.980,  Lanes on structure: 6,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 32 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 2.1m (6.9ft),  Curb-To-Curb Width: 26.8m (87.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007
Find on map >>

Structure Number: 53 1512,  Location: 07-LA-005-2.45-NRW (Lat: 33.895000,  Lng: -118.046667),  Route carried "on" structure: Interstate 5,  Year Built: 1958,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 237,000 (year 2000),  Truck Traffic: 9%,  Average Future Daily Traffic: 301,187 (year 2029),  Design Load: HS 20,  Features Intersected: EXCELSIOR WASH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.450,  Lanes on structure: 7,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 39.0m (128.0ft),  Skew: 35 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 39.0m (128.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007
Find on map >>

Structure Number: 53 1645,  Location: 07-LA-605-R5.81-NRW (Lat: 33.886667,  Lng: -118.101667),  Route carried "on" structure: Interstate 605,  Year Built: 1966,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 4.89m (16.04ft),  Average Daily Traffic: 262,670 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 303,988 (year 2029),  Design Load: HS 20,  Features Intersected: ALONDRA BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.810,  Lanes on structure: 14,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 57.6m (189.0ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 57.6m (189.0ft),  Out-to-Out Width: 59.2m (194.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 1646,  Location: 07-LA-605-R6.32-NRW (Lat: 33.893333,  Lng: -118.101667),  Route carried "on" structure: Interstate 605,  Year Built: 1966,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 262,670 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 303,988 (year 2029),  Design Load: HS 20,  Features Intersected: FAIRTON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.320,  Lanes on structure: 12,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 55.5m (182.1ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 55.5m (182.1ft),  Out-to-Out Width: 57.1m (187.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 1647,  Location: 07-LA-605-R6.4-NRW (Lat: 33.896667,  Lng: -118.101667),  Route carried "on" structure: Interstate 605,  Year Built: 1966,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 5.39m (17.68ft),  Average Daily Traffic: 262,670 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 303,988 (year 2029),  Design Load: HS 20,  Features Intersected: EXCELSIOR DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.400,  Lanes on structure: 14,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 55.5m (182.1ft),  Skew: 33 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 55.5m (182.1ft),  Out-to-Out Width: 57.1m (187.3ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 1648,  Location: 07-LA-605-R6.81-NRW (Lat: 33.901667,  Lng: -118.101667),  Route carried "on" structure: Interstate 605,  Year Built: 1966,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 262,670 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 303,988 (year 2029),  Design Load: HS 20,  Features Intersected: ROSECRANS AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.810,  Lanes on structure: 12,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 51.7m (169.6ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 51.7m (169.6ft),  Out-to-Out Width: 53.1m (174.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 165,  Location: 07-LA-605-R7.34-NRW (Lat: 33.910000,  Lng: -118.101667),  Route carried "on" structure: Interstate 605,  Year Built: 1966,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 262,670 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 303,988 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: FOSTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.340,  Lanes on structure: 12,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 48.4m (158.8ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 48.4m (158.8ft),  Out-to-Out Width: 50.0m (164.0ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 1651,  Location: 07-LA-605-R7.85-NRW (Lat: 33.916667,  Lng: -118.103333),  Route carried "on" structure: Interstate 605,  Year Built: 1966,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 262,670 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 302,978 (year 2029),  Design Load: HS 20,  Features Intersected: IMPERIAL HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.850,  Lanes on structure: 12,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 50.0m (164.0ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 47.4m (155.5ft),  Out-to-Out Width: 49.1m (161.1ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 1651K,  Location: 07-LA-605-R7.85-NRW (Lat: 33.916667,  Lng: -118.101667),  Route carried "on" structure: Ramp Interstate 605,  Year Built: 1992,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 26,260 (year 2006),  Average Future Daily Traffic: 30,298 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: IMPERIAL HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.850,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 1651T,  Location: 07-LA-605-R7.84-NRW (Lat: 33.916667,  Lng: -118.101667),  Route carried "on" structure: Ramp Interstate 605,  Year Built: 1992,  Status: Open,  Structure Length: 17.22m (56.50ft),  Average Daily Traffic: 8,100 (year 2006),  Truck Traffic: 2%,  Average Future Daily Traffic: 9,304 (year 2029),  Design Load: HS 20,  Features Intersected: IMPERIAL HWY, ON-RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.840,  Lanes on structure: 1,  Lanes under structure: 8,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 33.8m (110.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 1652,  Location: 07-LA-605-R8.23-NRW (Lat: 33.923333,  Lng: -118.103333),  Route carried "on" structure: Interstate 605,  Year Built: 1966,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 11.40m (37.40ft),  Average Daily Traffic: 262,670 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 302,978 (year 2029),  Design Load: HS 20,  Features Intersected: UP RR, DOWNEY-NORWALK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.230,  Lanes on structure: 14,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 56.1m (184.1ft),  Skew: 39 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 56.1m (184.1ft),  Out-to-Out Width: 57.7m (189.3ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 1652K,  Location: 07-LA-605-R8.23-NRW (Lat: 33.923333,  Lng: -118.103333),  Route carried "on" structure: Ramp Interstate 605,  Year Built: 1992,  Status: Open,  Structure Length: 13.90m (45.60ft),  Average Daily Traffic: 2,600 (year 2006),  Average Future Daily Traffic: 3,289 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: UP RR, DOWNEY-NORWALK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.230,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 35.4m (116.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 1652S,  Location: 07-LA-605-R8.23-NRW (Lat: 33.923333,  Lng: -118.103333),  Route carried "on" structure: Ramp Interstate 605,  Year Built: 1992,  Status: Open,  Structure Length: 8.96m (29.40ft),  Average Daily Traffic: 2,600 (year 2006),  Average Future Daily Traffic: 2,976 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: UP RR, DOWNEY-NORWALK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.230,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 1653,  Location: 07-LA-605-R8.38-NRW (Lat: 33.925000,  Lng: -118.103333),  Route carried "on" structure: Interstate 605,  Year Built: 1966,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 262,670 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 302,978 (year 2029),  Design Load: HS 20,  Features Intersected: FIRESTONE BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.380,  Lanes on structure: 14,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 56.7m (186.0ft),  Skew: 32 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 56.9m (186.7ft),  Out-to-Out Width: 58.6m (192.3ft)

Condition: Deck: Poor,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 1653S,  Location: 07-LA-605-R8.37-NRW (Lat: 33.925000,  Lng: -118.103333),  Route carried "on" structure: Ramp Interstate 605,  Year Built: 1992,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 254,500 (year 2003),  Average Future Daily Traffic: 277,639 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: FIRESTONE BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.370,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 40.5m (132.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 1654,  Location: 07-LA-605-R8.91-NRW (Lat: 33.930000,  Lng: -118.101667),  Route carried "on" structure: Interstate 605,  Year Built: 1966,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 262,670 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 302,978 (year 2029),  Design Load: HS 20,  Features Intersected: CECILIA STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.910,  Lanes on structure: 13,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 51.2m (168.0ft),  Skew: 22 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 51.2m (168.0ft),  Out-to-Out Width: 52.8m (173.2ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 2089M,  Location: 07-LA-605-R6.08-NRW (Lat: 33.891667,  Lng: -118.101667),  Route carried "on" structure: Interstate 605,  Year Built: 1966,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 213,100 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 261,098 (year 2029),  Design Load: HS 20,  Features Intersected: BARNWALL STREET DRAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.080,  Lanes on structure: 14,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 60.8m (199.5ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 59.6m (195.5ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2007
Find on map >>

Structure Number: 53 2090M,  Location: 07-LA-605-R7.09-NRW (Lat: 33.905000,  Lng: -118.101667),  Route carried "on" structure: Interstate 605,  Year Built: 1962,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 157,000 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 1 (year 2025),  Design Load: HS 20,  Features Intersected: LEFFINGWELL RD DRAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.090,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 71.6m (234.9ft),  Skew: 31 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 71.6m (234.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Inspection Date: September 2003
Find on map >>

Structure Number: 53 2594,  Location: 07-LA-605-R7.61-NRW (Lat: 33.913333,  Lng: -118.101667),  Route carried "on" structure: Interstate 605,  Year Built: 1992,  Status: Open,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 262,670 (year 2006),  Truck Traffic: 2%,  Average Future Daily Traffic: 302,978 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: ROUTE 105 & LRT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.610,  Lanes on structure: 12,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 48.8m (160.1ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 43.6m (143.0ft),  Curb-To-Curb Width: 51.7m (169.6ft),  Out-to-Out Width: 53.4m (175.2ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 2594S,  Location: 07-LA-605-R7.61-NRW (Lat: 33.916667,  Lng: -118.101667),  Route carried "on" structure: Bypass Interstate 605,  Year Built: 1992,  Status: Open,  Structure Length: 8.20m (26.90ft),  Average Daily Traffic: 8,500 (year 2006),  Truck Traffic: 2%,  Average Future Daily Traffic: 9,712 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: ROUTE 105 & LRT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.610,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 36,  Length of Maximum Span: 44.8m (147.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 2674S,  Location: 07-LA-005-4.87-NRW (Lat: 33.916667,  Lng: -118.078333),  Route carried "on" structure: Bypass Interstate 5,  Year Built: 1954,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,700 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,095 (year 2029),  Design Load: HS 20,  Features Intersected: BOMBARDIER AVENUE DRAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.870,  Lanes on structure: 1,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 1.8m (5.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.0m (23.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2007,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 53 2697H,  Location: 07-LA-605-R7.66-NRW (Lat: 33.915000,  Lng: -118.110000),  Route carried "on" structure: Ramp Interstate 605,  Year Built: 1987,  Status: Open,  Structure Length: 11.58m (37.99ft),  Average Daily Traffic: 25,450 (year 2006),  Truck Traffic: 2%,  Average Future Daily Traffic: 26,680 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: SAN GABRIEL RV/SERVICE R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.660,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 45.4m (149.0ft),  Curb-To-Curb Width: 19.1m (62.7ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 2699G,  Location: 07-LA-605-R6.81-NRW (Lat: 33.901667,  Lng: -118.101667),  Route carried "on" structure: Ramp Interstate 605,  Year Built: 1992,  Status: Open,  Structure Length: 13.56m (44.49ft),  Average Daily Traffic: 26,260 (year 2005),  Average Future Daily Traffic: 30,399 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: ROSECRANS AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.810,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 48.8m (160.1ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 2700G,  Location: 07-LA-605-R7.5-NRW (Lat: 33.913333,  Lng: -118.101667),  Route carried "on" structure: Ramp Interstate 605,  Year Built: 1992,  Status: Open,  Structure Length: 68.15m (223.59ft),  Average Daily Traffic: 15,500 (year 2006),  Truck Traffic: 2%,  Average Future Daily Traffic: 17,752 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: E105-N605 CONNECTOR
Minimum Vertical Clearance: 5.86m (19.23ft),  Kilometerpoint: 7.500,  Lanes on structure: 2,  Lanes under structure: 21,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 62.8m (206.0ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 2702G,  Location: 07-LA-105-17.64-NRW (Lat: 33.913333,  Lng: -118.096667),  Route carried "on" structure: Interstate 105,  Year Built: 1993,  Status: Open,  Structure Length: 64.53m (211.71ft),  Average Daily Traffic: 115,000 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 128,373 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: RUT 105, IMPHWY, RUT605
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.640,  Lanes on structure: 2,  Lanes under structure: 13,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 61.0m (200.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 53 2703G,  Location: 07-LA-105-R17.77-NRW (Lat: 33.910000,  Lng: -118.101667),  Route carried "on" structure: Ramp Interstate 105,  Year Built: 1990,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 20,500 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 22,080 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: FOSTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.770,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 53 2704G,  Location: 07-LA-105-R17.78-NRW (Lat: 33.905000,  Lng: -118.105000),  Route carried "on" structure: Ramp Interstate 105,  Year Built: 1987,  Status: Open,  Structure Length: 15.91m (52.20ft),  Average Daily Traffic: 20,500 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 22,080 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: S605 ROSECRANS AV OFFRMP
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 17.780,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 53 2705F,  Location: 07-LA-605-R8.04-NRW (Lat: 33.918333,  Lng: -118.103333),  Route carried "on" structure: Ramp Interstate 605,  Year Built: 1992,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 26,267 (year 2006),  Average Future Daily Traffic: 30,298 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: FIRESTONE BL-S605 ON-RMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.040,  Lanes on structure: 3,  Lanes under structure: 1,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 7 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 49.7m (163.1ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 2706F,  Location: 07-LA-605-R7.94-NRW (Lat: 33.918333,  Lng: -118.103333),  Route carried "on" structure: Ramp Interstate 605,  Year Built: 1992,  Status: Open,  Structure Length: 13.72m (45.01ft),  Average Daily Traffic: 24,500 (year 2006),  Truck Traffic: 2%,  Average Future Daily Traffic: 26,680 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: IMPERIAL HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.940,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 50.3m (165.0ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 53 2719G,  Location: 07-LA-105-R17.66-NRW (Lat: 33.913333,  Lng: -118.105000),  Route carried "on" structure: Ramp Interstate 105,  Year Built: 1987,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 10,000 (year 2006),  Truck Traffic: 2%,  Average Future Daily Traffic: 12,837 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: MET. RAIL PARK./FLATBUSH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.660,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 53 2759,  Location: 07-LA-105-R17.91-NRW (Lat: 33.916667,  Lng: -118.101667),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 1,000 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,567 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: I 105 & LRT,  Facility Carried by Structure: HOXIE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.1m (138.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 53C0338,  Location: 0.6 MI E SN GBRIEL RIV FW (Lat: 33.920000,  Lng: -118.095000),  Route carried "on" structure: City street L164,  Year Built: 1954,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 45,434 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 54,520 (year 2025),  Design Load: HS 20,  Features Intersected: FIRESTONE BLVD OH(SPTCO),  Facility Carried by Structure: FIRESTONE BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 24.2m (79.4ft),  Out-to-Out Width: 27.0m (88.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 53C0339,  Location: 0.8 MI E SAN GABL RIV FRW (Lat: 33.920000,  Lng: -118.093333),  Route carried "on" structure: City street L164,  Year Built: 1954,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 45,434 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 54,520 (year 2025),  Design Load: HS 20,  Features Intersected: LONGVEST DRAIN BRIDGE,  Facility Carried by Structure: FIRESTONE BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 24.1m (79.1ft),  Out-to-Out Width: 31.4m (103.0ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007
Find on map >>

Structure Number: 53C034,  Location: 0.5 MI SE SAN ANTONIO DR (Lat: 33.906667,  Lng: -118.068333),  Route carried "on" structure: City street L164,  Year Built: 1934,  Year Reconstructed: 1950,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 24,846 (year 2005),  Truck Traffic: 1%,  Average Future Daily Traffic: 31,237 (year 2029),  Design Load: HS 20,  Features Intersected: SILVERBOW STORM DRAIN,  Facility Carried by Structure: FIRESTONE BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007

Parts: 1, 2

Discuss this city on our hugely popular California forum

Back to: Norwalk, CA, California, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.