National Bridge Inventory (NBI) Statistics
Number of bridges: 20
Total length: 83 meters (272ft)
Total costs: $18,220,000
Total average daily traffic: 180,994
Total average daily truck traffic: 7,369
National Bridge Inventory (NBI) Registered Bridges for Ogden

New bridges - Historical Statistics

  • 1900-1909: 2
  • 1910-1919: 2
  • 1920-1929: 0
  • 1930-1939: 0
  • 1940-1949: 0
  • 1950-1959: 2
  • 1960-1969: 1
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 11
  • 2000-2009: 2

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 107469,  Location: JCT CO RD 208 & SH 531 (Lat: 43.160328,  Lng: -77.753942),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 8,377 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,001 ,  Design Load: HS 20,  Features Intersected: RTE 531,  Facility Carried by Structure: MANITOU ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 22.8m (74.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 22.9m (75.1ft),  Out-to-Out Width: 23.9m (78.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $840,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $1,340,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1074701,  Location: 2.6 MI E JCT SH259 &SH531 (Lat: 43.166997,  Lng: -77.761164),  Route carried "on" structure: State highway 531,  Year Built: 1994,  Status: Open,  Structure Length: 3.50m (11.48ft),  Average Daily Traffic: 15,277 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 20,955 (year 2025),  Design Load: HS 20,  Features Intersected: LYELL ROAD-CR 117
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.459,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.8m (110.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $840,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $1,340,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1074702,  Location: 2.6 MI E JCT SH259 &SH531 (Lat: 43.167136,  Lng: -77.761150),  Route carried "on" structure: State highway 531,  Year Built: 1994,  Status: Open,  Structure Length: 3.50m (11.48ft),  Average Daily Traffic: 15,277 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 20,955 (year 2025),  Design Load: HS 20,  Features Intersected: LYELL ROAD-CR 117
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.459,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.8m (110.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $840,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $1,340,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 107471,  Location: 1.6 MI E JCT RTS 259& 531 (Lat: 43.175456,  Lng: -77.774000),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 1,000 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,453 ,  Design Load: HS 20,  Features Intersected: RTE 531,  Facility Carried by Structure: GILLETT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $840,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $1,340,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 107472,  Location: 0.4 MI E OF JCT NY259&531 (Lat: 43.177775,  Lng: -77.796522),  Route carried "on" structure: State highway 531,  Year Built: 1994,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 500 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 821 ,  Design Load: HS 20,  Features Intersected: NORTHRUP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 326.627,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 24.3m (79.7ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 77.1 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $361,000,  Roadway Improvement Cost: $215,000,  Total Project Cost: $576,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 107474,  Location: .2 MI W JCT SH259 & SH531 (Lat: 43.179844,  Lng: -77.814617),  Route carried "on" structure: Bypass State highway 531,  Year Built: 1994,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 18,868 (year 2006),  Truck Traffic: 4%,  Average Future Daily Traffic: 25,881 (year 2026),  Design Load: HS 20,  Features Intersected: WB NORTHRUP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.196,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 35.9m (117.8ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 77.3 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $528,000,  Roadway Improvement Cost: $314,000,  Total Project Cost: $842,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 331715,  Location: 2 MI NW OF SPENCERPORT (Lat: 43.197522,  Lng: -77.858003),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 1.09m (3.58ft),  Average Daily Traffic: 1,914 (year 2001),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,649 (year 2021),  Design Load: HS 25,  Features Intersected: SALMON CREEK,  Facility Carried by Structure: COUNTY ROAD 175
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 80.4 metric tons,  Inventory Rating: 40.8 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $258,000,  Roadway Improvement Cost: $153,000,  Total Project Cost: $411,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 33616,  Location: 1.4 MI E OF SPENCERPORT (Lat: 43.188544,  Lng: -77.773619),  Route carried "on" structure: County highway ,  Year Built: 1969,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 2,423 (year 2000),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,353 (year 2020),  Design Load: H 20,  Features Intersected: EX-NY CENTRAL RR,  Facility Carried by Structure: GILLETT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Railroad,  Approaching Roadway Width: 11.8m (38.7ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Poor,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.48m (14.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,147,000,  Roadway Improvement Cost: $682,000,  Total Project Cost: $1,829,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 444313,  Location: 2.5MI E JCT BARGE C + 259 (Lat: 43.187447,  Lng: -77.753467),  Route carried "on" structure: County highway ,  Year Built: 1950,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 11.00m (36.09ft),  Average Daily Traffic: 15,959 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 20,957 (year 2022),  Design Load: HS 20,  Features Intersected: ERIE CANAL,  Facility Carried by Structure: MANITOU ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Skew: 1 degrees,  Navigation Control: Yes ( Vertical Clearance: 6.7m (22.0ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 56.9m (186.7ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.00m (36.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $3,442,000,  Roadway Improvement Cost: $1,997,000,  Total Project Cost: $5,439,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 444314,  Location: 1.4MI E JCT BARGE C + 259 (Lat: 43.190742,  Lng: -77.773594),  Route carried "on" structure: County highway ,  Year Built: 1909,  Status: Posted for load-capacity,  Structure Length: 5.69m (18.67ft),  Average Daily Traffic: 2,703 (year 1997),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,741 (year 2017),  Features Intersected: ERIE CANAL,  Facility Carried by Structure: GILLETT ROAD
Minimum Vertical Clearance: 4.14m (13.58ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Navigation Control: Yes ( Vertical Clearance: 5.1m (16.7ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 45.1m (148.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of replacement,  Length Of Structure Improvement: 5.69m (18.67ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Critical Feature Inspection Date: June 2006,  Bridge Improvement Cost: $509,000,  Roadway Improvement Cost: $301,000,  Total Project Cost: $810,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 444316,  Location: 1.2MI W JCT BARGE C + 259 (Lat: 43.195869,  Lng: -77.823475),  Route carried "on" structure: City street ,  Year Built: 1909,  Status: Posted for load,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 1,665 (year 2006),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,304 (year 2026),  Features Intersected: ERIE CANAL,  Facility Carried by Structure: TRIMMER ROAD
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Navigation Control: Yes ( Vertical Clearance: 5.1m (16.7ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 45.1m (148.0ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of replacement,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 5.85m (19.19ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: June 2007,  Critical Feature Inspection Date: June 2007,  Bridge Improvement Cost: $626,000,  Roadway Improvement Cost: $372,000,  Total Project Cost: $998,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 444318,  Location: 1.4 MI E JCT BG CNL&SH260 (Lat: 43.202728,  Lng: -77.872667),  Route carried "on" structure: City street ,  Year Built: 2003,  Status: Posted for load-capacity,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 1,800 (year 2006),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,491 (year 2026),  Features Intersected: ERIE CANAL,  Facility Carried by Structure: COUNTY ROAD 244
Minimum Vertical Clearance: 4.21m (13.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Navigation Control: Yes ( Vertical Clearance: 4.6m (15.1ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 45.1m (148.0ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Critical Feature Inspection Date: July 2007,  Bridge Improvement Cost: $626,000,  Roadway Improvement Cost: $372,000,  Total Project Cost: $998,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 444359,  Location: .4 MI N JCT SH 31 & SH 36 (Lat: 43.195681,  Lng: -77.853922),  Route carried "on" structure: County highway ,  Year Built: 2007,  Status: Open,  Structure Length: 4.41m (14.47ft),  Average Daily Traffic: 4,430 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,435 (year 2023),  Design Load: H 20,  Features Intersected: ERIE CANAL,  Facility Carried by Structure: WASHINGTON STREET
Minimum Vertical Clearance: 2.69m (8.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.2m (118.8ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 10.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 6.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.41m (14.47ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Critical Feature Inspection Date: September 2007,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $357,000,  Total Project Cost: $957,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 107469,  Location: JCT CO RD 208 & SH 531 (Lat: 43.160328,  Lng: -77.753942),  Route carried "under" structure: State highway 531,  Year Built: 1993,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 42,088 (year 2005),  Truck Traffic: 4%,  Features Intersected: RTE 531,  Facility Carried by Structure: MANITOU ROAD
Minimum Vertical Clearance: 4.64m (15.22ft),  Kilometerpoint: 9.557,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>

Structure Number: 1074701,  Location: 2.6 MI E JCT SH259 &SH531 (Lat: 43.166997,  Lng: -77.761164),  Route carried "under" structure: County highway ,  Year Built: 1994,  Structure Length: 3.50m (11.48ft),  Average Daily Traffic: 10 (year 2007),  Truck Traffic: 4%,  Features Intersected: LYELL ROAD-CR 117,  Facility Carried by Structure: RTE 531
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>

Structure Number: 1074702,  Location: 2.6 MI E JCT SH259 &SH531 (Lat: 43.167136,  Lng: -77.761150),  Route carried "under" structure: County highway ,  Year Built: 1994,  Structure Length: 3.50m (11.48ft),  Average Daily Traffic: 90 (year 2007),  Truck Traffic: 4%,  Features Intersected: LYELL ROAD-CR 117,  Facility Carried by Structure: RTE 531
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>

Structure Number: 107471,  Location: 1.6 MI E JCT RTS 259& 531 (Lat: 43.175456,  Lng: -77.774000),  Route carried "under" structure: State highway 531,  Year Built: 1993,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 30,553 (year 2005),  Truck Traffic: 4%,  Features Intersected: RTE 531,  Facility Carried by Structure: GILLETT ROAD
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 6.887,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>

Structure Number: 7706971,  Location: 2.7 MI W OF SPENCERPORT (Lat: 43.195083,  Lng: -77.854019),  Route carried "under" structure: County highway ,  Year Built: 1914,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 4,430 (year 2003),  Truck Traffic: 4%,  Features Intersected: WASH ST C R 212,  Facility Carried by Structure: ABANDONED NYC RR
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 9.1m (29.9ft)

Find on map >>

Structure Number: 7706972,  Location: 2.7 MI W OF SPENCERPORT (Lat: 43.195011,  Lng: -77.854006),  Route carried "under" structure: County highway ,  Year Built: 1914,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 4,430 (year 2003),  Truck Traffic: 4%,  Features Intersected: WASH ST C R 212,  Facility Carried by Structure: ABANDONED NYC RR
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 9.1m (29.9ft)

Find on map >>

Structure Number: 77152,  Location: 2.4 MI E OF SPENCERPORT (Lat: 43.184764,  Lng: -77.753500),  Route carried "under" structure: County highway ,  Year Built: 1955,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 9,200 (year 2007),  Truck Traffic: 5%,  Features Intersected: MANITOU RD CR 208,  Facility Carried by Structure: ABANDONED NYC RR
Minimum Vertical Clearance: 4.21m (13.81ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.4m (44.0ft)

Discuss this city on our hugely popular New York forum

Back to: Ogden, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.