National Bridge Inventory (NBI) Statistics
Number of bridges: 30
Total length: 249 meters (817ft)
Total costs: $46,000
Total average daily traffic: 659,100
Total average daily truck traffic: 63,664
National Bridge Inventory (NBI) Registered Bridges for Old Saybrook

New bridges - Historical Statistics

  • 1930-1939: 1
  • 1940-1949: 0
  • 1950-1959: 9
  • 1960-1969: 6
  • 1970-1979: 2
  • 1980-1989: 1
  • 1990-1999: 10
  • 2000-2009: 1

Reconstructed bridges - Historical Statistics

  • 1980-1989: 1
  • 1990-1999: 5

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 233,  Location: 1.3 MI E OF ROUTE 153 (Lat: 41.293333,  Lng: -72.420000),  Route carried "on" structure: State highway 166,  Year Built: 1957,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 8,100 (year 2006),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,050 (year 2026),  Design Load: HS 20,  Features Intersected: INTERSTATE-95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.060,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 234,  Location: 0.5 MI N OF ROUTE 166 (Lat: 41.298333,  Lng: -72.406667),  Route carried "on" structure: Interstate 95,  Year Built: 1957,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 57,900 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 28,950 (year 2026),  Design Load: HS 20,  Features Intersected: SCHOOL HOUSE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 120.932,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 33 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 26.9m (88.3ft),  Out-to-Out Width: 28.9m (94.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 87.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 235,  Location: 0.8 MI N OF US ROUTE 1 (Lat: 41.286667,  Lng: -72.393333),  Route carried "on" structure: Interstate 95,  Year Built: 1957,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 57,900 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 28,950 (year 2026),  Design Load: HS 20,  Features Intersected: ELM STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 122.155,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 33 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 26.9m (88.3ft),  Out-to-Out Width: 28.9m (94.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 81.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 236,  Location: 0.1 MI S OF ROUTE 154 (Lat: 41.305000,  Lng: -72.381667),  Route carried "on" structure: Interstate 95,  Year Built: 1957,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 64,300 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 32,150 (year 2026),  Design Load: HS 20,  Features Intersected: VALLEY RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 123.233,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 27.1m (88.9ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 32.2m (105.6ft),  Out-to-Out Width: 34.4m (112.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 84.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 237,  Location: 1.3 MI S OF ROUTE 9 (Lat: 41.310000,  Lng: -72.380000),  Route carried "on" structure: Interstate 95,  Year Built: 1957,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 57,000 (year 2006),  Truck Traffic: 16%,  Average Future Daily Traffic: 28,500 (year 2026),  Design Load: HS 20,  Features Intersected: ROUTE 154
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 123.459,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 26.9m (88.3ft),  Out-to-Out Width: 28.9m (94.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 66.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 238,  Location: 0.6 MI S OF ROUTE 9 (Lat: 41.306667,  Lng: -72.366667),  Route carried "on" structure: Interstate 95,  Year Built: 1957,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 57,000 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 28,500 (year 2026),  Design Load: HS 20,  Features Intersected: SR 628 {Spring Brook Rd}
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 124.681,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 27.1m (88.9ft),  Skew: 35 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 26.9m (88.3ft),  Out-to-Out Width: 28.9m (94.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 61.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1386,  Location: 0.8 MI S OF US ROUTE 1 (Lat: 41.280000,  Lng: -72.393333),  Route carried "on" structure: State highway 154,  Year Built: 1935,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,800 (year 2006),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,400 (year 2026),  Design Load: H 20,  Features Intersected: BACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.335,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 70.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Underwater Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 23,  Location: 100 FT S OF ROUTE 154 (Lat: 41.286667,  Lng: -72.391667),  Route carried "on" structure: US 1,  Year Built: 1971,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 17,200 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,600 (year 2026),  Design Load: HS 20,  Features Intersected: OYSTER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 127.867,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Inventory Rating: 55.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 3334,  Location: 0.7 MI N OF I-95 (Lat: 41.320000,  Lng: -72.363333),  Route carried "on" structure: State highway 9,  Year Built: 1966,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 12,750 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,375 (year 2026),  Design Load: HS 20,  Features Intersected: FLORAL PARK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.175,  Lanes on structure: 3,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 63.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 3335,  Location: 0.7 MI N OF I-95 (Lat: 41.320000,  Lng: -72.363333),  Route carried "on" structure: State highway 9,  Year Built: 1966,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 12,750 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,375 (year 2026),  Design Load: HS 20,  Features Intersected: FLORAL PARK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.175,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 67.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 3336,  Location: 1.5 MI N OF I-95 (Lat: 41.323333,  Lng: -72.378333),  Route carried "on" structure: State highway 9,  Year Built: 1966,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 11,800 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,900 (year 2026),  Design Load: HS 20,  Features Intersected: ROUTE 154
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.462,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 3337,  Location: 1.5 MI N OF I-95 (Lat: 41.323333,  Lng: -72.378333),  Route carried "on" structure: State highway 9,  Year Built: 1966,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 11,800 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,900 (year 2026),  Design Load: HS 20,  Features Intersected: ROUTE 154
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.478,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 77.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 3836,  Location: .25 MILES SOUTH OF I95 (Lat: 41.315000,  Lng: -72.375000),  Route carried "on" structure: US 1,  Year Built: 1976,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 25,900 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,950 (year 2026),  Design Load: HS 20,  Features Intersected: AMTRAK RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 130.007,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 0.0m,  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 19.6m (64.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 55.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 4749,  Location: 50' SOUTH/RED BIRD TRAIL (Lat: 41.276667,  Lng: -72.406667),  Route carried "on" structure: City street ,  Year Built: 2003,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 100 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 50 (year 2026),  Design Load: HS 20,  Features Intersected: MUD CREEK,  Facility Carried by Structure: NEHANTIC TRAIL #2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 70.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: November 2007,  Underwater Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 5702,  Location: 0.2 MI WEST OF US RTE 1 (Lat: 41.298333,  Lng: -72.418333),  Route carried "on" structure: State highway 166,  Year Built: 1988,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 10,900 (year 2001),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,450 (year 2026),  Design Load: HS 20,  Features Intersected: AMTRAK RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.269,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 72.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 5923,  Location: 0.5 MILES NORTH OF RTE 1 (Lat: 41.296667,  Lng: -72.395000),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 1,000 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 500 (year 2026),  Design Load: HS 20,  Features Intersected: AMTRAK RAILROAD,  Facility Carried by Structure: INGHAM HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 2,  Maintenance Responsibility: Local Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 66.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 6021,  Location: 0.2 MI NORTH OF US RTE 1 (Lat: 41.293333,  Lng: -72.403333),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 900 (year 1992),  Truck Traffic: 7%,  Average Future Daily Traffic: 450 (year 2026),  Design Load: HS 20,  Features Intersected: AMTRAK RAILROAD,  Facility Carried by Structure: SCHOOLHOUSE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Maintenance Responsibility: Local Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 63.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 6172,  Location: 1.4 MI NORTH OF ROUTE 154 (Lat: 41.301667,  Lng: -72.360000),  Route carried "on" structure: Interstate 95,  Year Built: 1992,  Status: Open,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 61,800 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 30,900 (year 2026),  Design Load: HS 20,  Features Intersected: ROUTE 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 125.599,  Lanes on structure: 7,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 42.4m (139.1ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.0m (118.1ft),  Curb-To-Curb Width: 42.8m (140.4ft),  Out-to-Out Width: 45.8m (150.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 80.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 6200A,  Location: .72 MI. OF ROUTE 156 (Lat: 41.328333,  Lng: -72.353333),  Route carried "on" structure: Interstate 95,  Year Built: 1993,  Status: Open,  Structure Length: 77.14m (253.08ft),  Average Daily Traffic: 42,200 (year 2005),  Truck Traffic: 9%,  Average Future Daily Traffic: 21,100 (year 2026),  Design Load: HS 20,  Features Intersected: FERRY RD. CONNECTICUT R.
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 126.226,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Navigation Control: Yes ( Vertical Clearance: 24.7m (81.0ft), Horizontal Clearance: 61.0m (200.1ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 83.8m (274.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 23.4m (76.8ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 82.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Underwater Inspection Date: September 2006,  Other Special Inspection Date: July 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 6200B,  Location: .72 MI. W. OF ROUTE 156 (Lat: 41.328333,  Lng: -72.351667),  Route carried "on" structure: Interstate 95,  Year Built: 1993,  Status: Open,  Structure Length: 77.14m (253.08ft),  Average Daily Traffic: 42,200 (year 2005),  Truck Traffic: 9%,  Average Future Daily Traffic: 21,100 (year 2026),  Design Load: HS 20,  Features Intersected: FERRY RD. CONN. RIVER
Minimum Vertical Clearance: 6.02m (19.75ft),  Kilometerpoint: 126.226,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Navigation Control: Yes ( Vertical Clearance: 24.7m (81.0ft), Horizontal Clearance: 61.0m (200.1ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 83.8m (274.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 0.0m,  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 67.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Underwater Inspection Date: September 2006,  Other Special Inspection Date: August 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 6274,  Location: 3.85 MI NORTH OF ROUTE 1 (Lat: 41.270000,  Lng: -72.356667),  Route carried "on" structure: State highway 154,  Year Built: 1994,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 1,700 (year 2005),  Truck Traffic: 2%,  Average Future Daily Traffic: 850 (year 2026),  Design Load: HS 20,  Features Intersected: SOUTH COVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.195,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 83.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Underwater Inspection Date: September 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 6275,  Location: 4.08 MI NORTH OF ROUTE 1 (Lat: 41.268333,  Lng: -72.355000),  Route carried "on" structure: State highway 154,  Year Built: 1994,  Status: Open,  Structure Length: 6.92m (22.70ft),  Average Daily Traffic: 1,700 (year 2005),  Truck Traffic: 2%,  Average Future Daily Traffic: 850 (year 2026),  Design Load: HS 20,  Features Intersected: SOUTH COVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.565,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Inventory Rating: 55.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Underwater Inspection Date: September 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 6276,  Location: 4.34 MILES NORTH ROUTE 1 (Lat: 41.266667,  Lng: -72.353333),  Route carried "on" structure: State highway 154,  Year Built: 1994,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 1,700 (year 2005),  Truck Traffic: 2%,  Average Future Daily Traffic: 850 (year 2026),  Design Load: HS 20,  Features Intersected: SOUTH COVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.999,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 79.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Underwater Inspection Date: September 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 233,  Location: 1.3 MI E OF ROUTE 153 (Lat: 41.293333,  Lng: -72.420000),  Route carried "under" structure: Interstate 95,  Year Built: 1957,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 57,900 (year 2006),  Truck Traffic: 15%,  Features Intersected: INTERSTATE-95,  Facility Carried by Structure: ROUTE 166
Minimum Vertical Clearance: 0.46m (1.51ft),  Kilometerpoint: 11.971,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>

Structure Number: 237,  Location: 1.3 MI S OF ROUTE 9 (Lat: 41.310000,  Lng: -72.380000),  Route carried "under" structure: State highway 154,  Year Built: 1957,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 15,400 (year 2006),  Truck Traffic: 6%,  Features Intersected: ROUTE 154,  Facility Carried by Structure: INTERSTATE-95
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 1.181,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>

Structure Number: 238,  Location: 0.6 MI S OF ROUTE 9 (Lat: 41.306667,  Lng: -72.366667),  Route carried "under" structure: State highway 628,  Year Built: 1957,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 5,700 (year 2006),  Truck Traffic: 10%,  Features Intersected: SR 628 {Spring Brook Rd},  Facility Carried by Structure: INTERSTATE-95
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.145,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>

Structure Number: 3336,  Location: 1.5 MI N OF I-95 (Lat: 41.323333,  Lng: -72.378333),  Route carried "under" structure: State highway 154,  Year Built: 1966,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 8,200 (year 2006),  Truck Traffic: 6%,  Features Intersected: ROUTE 154,  Facility Carried by Structure: ROUTE 9 SOUTHBOUND
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 13.886,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>

Structure Number: 3337,  Location: 1.5 MI N OF I-95 (Lat: 41.323333,  Lng: -72.378333),  Route carried "under" structure: State highway 154,  Year Built: 1966,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 8,200 (year 2006),  Truck Traffic: 6%,  Features Intersected: ROUTE 154,  Facility Carried by Structure: ROUTE 9 NORTHBOUND
Minimum Vertical Clearance: 0.50m (1.64ft),  Kilometerpoint: 13.934,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>

Structure Number: 6172,  Location: 1.4 MI NORTH OF ROUTE 154 (Lat: 41.301667,  Lng: -72.360000),  Route carried "under" structure: State highway 9,  Year Built: 1992,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 2,300 (year 2005),  Truck Traffic: 10%,  Features Intersected: ROUTE 9
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 0.644,  Lanes on structure: 7,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>

Structure Number: 6172,  Location: 1.4 MI NORTH OF ROUTE 154 (Lat: 41.301667,  Lng: -72.360000),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 1992,  Structure Length: 3.78m (12.40ft),  Features Intersected: ROUTE 9
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 0.016,  Lanes on structure: 7,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Discuss this city on our hugely popular Connecticut forum

Back to: Old Saybrook, CT, Connecticut, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.