National Bridge Inventory (NBI) Statistics
Number of bridges: 14
Total length: 59 meters (194ft)
Total costs: $1,831,000
Total average daily traffic: 200,282
Total average daily truck traffic: 8,814
National Bridge Inventory (NBI) Registered Bridges for Olmsted Falls

New bridges - Historical Statistics

  • 1910-1919: 1
  • 1920-1929: 0
  • 1930-1939: 1
  • 1940-1949: 0
  • 1950-1959: 10
  • 1960-1969: 0
  • 1970-1979: 1
  • 1980-1989: 0
  • 1990-1999: 1

Reconstructed bridges - Historical Statistics

  • 1980-1989: 1
  • 1990-1999: 4

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 1810413,  Location: 1.38 MI N OHIO TURNPIKE (Lat: 41.376411,  Lng: -81.902028),  Route carried "on" structure: State highway 252,  Year Built: 1932,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 9,610 (year 2004),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,339 (year 2028),  Design Load: H 15,  Features Intersected: PLUM CRK N. OF BAGLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.880,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 33.3 metric tons,  Inventory Rating: 24.3 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $306,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $340,000 ( Estimate for 2000),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1829203,  Location: 4.7MI EAST OF EXIT 9 (Lat: 41.356667,  Lng: -81.903333),  Route carried "on" structure: State highway 252,  Year Built: 1954,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 9,610 (year 2004),  Truck Traffic: 5%,  Average Future Daily Traffic: 40,002 (year 2025),  Design Load: H 15,  Features Intersected: I80 OHIO TPK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.680,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1829254,  Location: 5.2MI EAST OF EXIT 152 (Lat: 41.356667,  Lng: -81.896667),  Route carried "on" structure: Interstate 80K,  Year Built: 1954,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 13,000 (year 1990),  Truck Traffic: 23%,  Average Future Daily Traffic: 18,044 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: W BRANCH ROCKY RIV MP157,  Facility Carried by Structure: I80 TPK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.620,  Lanes on structure: 6,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 37.4m (122.7ft),  Out-to-Out Width: 38.4m (126.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2005,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1829289,  Location: 5.3MI EAST OF EXIT 152 (Lat: 41.356667,  Lng: -81.893333),  Route carried "on" structure: Interstate 80K,  Year Built: 1954,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 13,000 (year 1990),  Truck Traffic: 23%,  Average Future Daily Traffic: 18,044 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: LINDBERGH BLVD MP1575,  Facility Carried by Structure: I80 TPK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.890,  Lanes on structure: 6,  Lanes under structure: 2,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 37.4m (122.7ft),  Out-to-Out Width: 38.3m (125.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1829319,  Location: 5.5MI EAST OF EXIT 9 (Lat: 41.356667,  Lng: -81.890000),  Route carried "on" structure: Interstate 80K,  Year Built: 1954,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 28,820 (year 1972),  Average Future Daily Traffic: 40,002 (year 2027),  Design Load: HS 20,  Features Intersected: DITCH MP1577,  Facility Carried by Structure: I80 TPK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.160,  Lanes on structure: 4,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 37.8m (124.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2007
Find on map >>

Structure Number: 1830309,  Location: WEST OF COLUMBIA ROAD (Lat: 41.373333,  Lng: -81.905000),  Route carried "on" structure: County highway TR020,  Year Built: 1978,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 15,994 (year 2000),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,907 (year 2025),  Design Load: H 20,  Features Intersected: PLUM CREEK/BAGLEY RD #15,  Facility Carried by Structure: BAGLEY ROAD CR27
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Poor,  Culverts: Fair,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 50.90m (166.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,200,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $1,259,000 ( Estimate for 2000)
Find on map >>

Structure Number: 1830597,  Location: 1208 FT E OF COLUMBIA RD (Lat: 41.350817,  Lng: -81.905392),  Route carried "on" structure: County highway C0067,  Year Built: 1959,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 10,000 (year 2001),  Truck Traffic: 2%,  Average Future Daily Traffic: 13,880 (year 2029),  Design Load: H 20,  Features Intersected: BAKER CRK/SPRAGUE RD #12,  Facility Carried by Structure: SPRAGUE RD CR67
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 33.3 metric tons,  Inventory Rating: 24.3 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2007,  Deck Structure Type: Concrete Cast-file-Place
Structure Number: 1831364,  Location: 575' W OF DIVISION STR,  Route carried "on" structure: Spur County highway 59,  Year Built: 1951,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 8,910 (year 2000),  Truck Traffic: 2%,  Average Future Daily Traffic: 12,367 (year 2029),  Design Load: H 20,  Features Intersected: BUSBY DITCH/COOK RD #14
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 30.6 metric tons,  Inventory Rating: 22.5 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2007
Find on map >>

Structure Number: 1831534,  Location: 553' WEST OF MAIN STREET (Lat: 41.378333,  Lng: -81.898333),  Route carried "on" structure: County highway 293,  Year Built: 1913,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 7.77m (25.49ft),  Average Daily Traffic: 3,807 (year 1998),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,284 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: W BR ROCKY RVR/WATER #19
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.67m (18.60ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $202,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $232,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 183284,  Location: 880 FT E OF COLUMBIA RD (Lat: 41.373333,  Lng: -81.898333),  Route carried "on" structure: County highway 27,  Year Built: 1995,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 18,689 (year 2000),  Truck Traffic: 4%,  Average Future Daily Traffic: 25,940 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: W BR ROCKY RVR/BAGLEY #2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: 1834576,  Location: 2460' N. OF SPRAGUE RD,  Route carried "on" structure: County highway 276,  Year Built: 1953,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 7,812 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 10,843 (year 2029),  Design Load: HS 15,  Features Intersected: STRONGSVLLE D/LNDBG #13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 30.6 metric tons,  Inventory Rating: 22.5 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2007
Find on map >>

Structure Number: 1829203,  Location: 4.7MI EAST OF EXIT 9 (Lat: 41.356667,  Lng: -81.903333),  Route carried "under" structure: Interstate 80K,  Year Built: 1954,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 28,820 (year 1972),  Features Intersected: SR252 COLUMBIA RD MP1569,  Facility Carried by Structure: SR 252
Minimum Vertical Clearance: 0.46m (1.51ft),  Kilometerpoint: 0.595,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>

Structure Number: 1829238,  Location: 5MI EAST OF EXIT 9 (Lat: 41.356667,  Lng: -81.900000),  Route carried "under" structure: Interstate 80K,  Year Built: 1954,  Structure Length: 9.97m (32.71ft),  Average Daily Traffic: 28,820 (year 1972),  Features Intersected: CSX TRAN RR MP1572,  Facility Carried by Structure: PENN CENTRAL RR
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.628,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>

Structure Number: 1829289,  Location: 5.3MI EAST OF EXIT 152 (Lat: 41.356667,  Lng: -81.893333),  Route carried "under" structure: County highway 276,  Year Built: 1954,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 3,390 (year 1968),  Features Intersected: I80 OHIO TPK,  Facility Carried by Structure: I80 TPK
Minimum Vertical Clearance: 4.06m (13.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Discuss this city on our hugely popular Ohio forum

Back to: Olmsted Falls, OH, Ohio, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.