![]() |
Bridge Statistics for Oneida, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Oneida, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 19 Total length: 62 meters (203ft) Total costs: $24,410,000 Total average daily traffic: 152,355 Total average daily truck traffic: 24,586 National Bridge Inventory (NBI) Registered Bridges for Oneida
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 102568, Location: 0.1 MI N JCT RTS 46 & 316 (Lat: 43.115097, Lng: -75.668947), Route carried "on" structure: State highway 46, Year Built: 1957, Status: Open, Structure Length: 5.12m (16.80ft), Average Daily Traffic: 5,628 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 7,012 (year 2025), Design Load: HS 20, Features Intersected: ONEIDA CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 9.870, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.5m (37.7ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 25.2m (82.7ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 13.1m (43.0ft) Condition: Deck: Poor, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 73.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.12m (16.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,455,000, Roadway Improvement Cost: $865,000, Total Project Cost: $2,320,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 104675, Location: .6 MI W JCT SH365 &SH365A (Lat: 43.092564, Lng: -75.641108), Route carried "on" structure: State highway 365A, Year Built: 1961, Status: Open, Structure Length: 3.23m (10.60ft), Average Daily Traffic: 7,636 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 9,514 (year 2025), Design Load: HS 20, Features Intersected: ONEIDA CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.634, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 16.1m (52.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 15.8m (51.8ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Fair, Channel: Good, Operating Rating: 83.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.23m (10.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $435,000, Roadway Improvement Cost: $249,000, Total Project Cost: $684,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 202566, Location: NORTH END OF ONEIDA (Lat: 43.105706, Lng: -75.661189), Route carried "on" structure: State highway 46, Year Built: 1964, Status: Posted for load, Structure Length: 4.78m (15.68ft), Average Daily Traffic: 7,312 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 9,110 (year 2026), Features Intersected: CSX TRANS/ AMTRAK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 8.664, Lanes on structure: 2, Base Highway Network: Yes, Owner: Railroad, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 18.2m (59.7ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Fair, Superstructure: Poor, Substructure: Poor, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of corrective action, Underclear: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 4.78m (15.68ft), Designated Inspection Frequency: Every 12 months, Inspection Date: January 2008, Bridge Improvement Cost: $1,415,000, Roadway Improvement Cost: $908,000, Total Project Cost: $2,323,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 225757, Location: IN CITY OF ONEIDA (Lat: 43.107561, Lng: -75.654497), Route carried "on" structure: City street , Year Built: 1963, Status: Open, Structure Length: 4.99m (16.37ft), Average Daily Traffic: 604 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 752 (year 2027), Design Load: H 20, Features Intersected: CSX TRANS/AMTRAK, Facility Carried by Structure: NORTH LAKE STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 18.5m (60.7ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Satisfactory, Superstructure: Poor, Substructure: Poor, Operating Rating: 68.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.99m (16.37ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $1,158,000, Roadway Improvement Cost: $689,000, Total Project Cost: $1,847,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 230936, Location: BENNETT RD-CITY ONEIDA LN (Lat: 43.105919, Lng: -75.648247), Route carried "on" structure: City street , Year Built: 1986, Status: Open, Structure Length: 2.80m (9.19ft), Average Daily Traffic: 1,137 (year 1998), Truck Traffic: 3%, Average Future Daily Traffic: 1,410 (year 2018), Design Load: HS 20, Features Intersected: ONEIDA CREEK, Facility Carried by Structure: BENNETT RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 27.4m (89.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.3m (24.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Satisfactory, Operating Rating: 78.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.80m (9.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $124,000, Roadway Improvement Cost: $73,000, Total Project Cost: $197,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 330931, Location: 1 MI SW SHERRILL RES. (Lat: 43.045169, Lng: -75.599983), Route carried "on" structure: County highway , Year Built: 1964, Status: Open, Structure Length: 1.70m (5.58ft), Average Daily Traffic: 1,880 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 2,341 (year 2025), Features Intersected: ONEIDA CREEK, Facility Carried by Structure: CR34PETERBORO RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 15.8m (51.8ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 8.2m (26.9ft), Out-to-Out Width: 8.8m (28.9ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Satisfactory, Channel: Good, Inventory Rating: 71.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.70m (5.58ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $325,000, Roadway Improvement Cost: $193,000, Total Project Cost: $518,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 330932, Location: 0.5 MI W.SHERRILL RES. (Lat: 43.057531, Lng: -75.603894), Route carried "on" structure: County highway , Year Built: 1967, Status: Open, Structure Length: 1.55m (5.09ft), Average Daily Traffic: 1,885 (year 1998), Truck Traffic: 6%, Average Future Daily Traffic: 2,347 (year 2018), Design Load: H 20, Features Intersected: ONEIDA CREEK, Facility Carried by Structure: CR51KENWOOD AVEN Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.6m (47.9ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 8.6m (28.2ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 57.2 metric tons, Inventory Rating: 23.4 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.55m (5.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $289,000, Roadway Improvement Cost: $172,000, Total Project Cost: $461,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 330935, Location: 4 MI SE STATE BRIDGE (Lat: 43.097703, Lng: -75.639778), Route carried "on" structure: City street , Year Built: 1998, Status: Open, Structure Length: 2.43m (7.97ft), Average Daily Traffic: 3,297 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 4,106 (year 2027), Features Intersected: ONEIDA CREEK, Facility Carried by Structure: SCONONDOA STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 22.8m (74.8ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 8.9m (29.2ft), Out-to-Out Width: 11.2m (36.7ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Satisfactory, Operating Rating: 80.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 48.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.43m (7.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $289,000, Roadway Improvement Cost: $172,000, Total Project Cost: $461,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 330938, Location: 2 MI SW OF STATE BRIDGE (Lat: 43.139792, Lng: -75.707750), Route carried "on" structure: City street , Year Built: 1946, Status: Closed, Structure Length: 2.34m (7.68ft), Average Daily Traffic: 120 (year 2000), Truck Traffic: 3%, Average Future Daily Traffic: 149 (year 2020), Design Load: H 20, Features Intersected: ONEIDA CREEK, Facility Carried by Structure: SWALLOWS BRDGE RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: County Highway Agency, Approaching Roadway Width: 4.2m (13.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 22.8m (74.8ft), Curb-To-Curb Width: 4.9m (16.1ft), Out-to-Out Width: 4.9m (16.1ft) Condition: Deck: Fair, Superstructure: Serious, Substructure: Poor, Channel: Fair, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below), Length Of Structure Improvement: 2.34m (7.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $249,000, Roadway Improvement Cost: $148,000, Total Project Cost: $397,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Wood or Timber Find on map >>
Structure Number: 33094, Location: 2.0 MI NW OF ONEIDA (Lat: 43.097853, Lng: -75.691369), Route carried "on" structure: County highway , Year Built: 1940, Status: Open, Structure Length: 1.28m (4.20ft), Average Daily Traffic: 1,999 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 2,489 (year 2025), Design Load: H 20, Features Intersected: COWASELON CK, Facility Carried by Structure: CR76CANAL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.1m (39.7ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 9.0m (29.5ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Channel: Poor, Operating Rating: 24.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 14.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.28m (4.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $249,000, Roadway Improvement Cost: $148,000, Total Project Cost: $397,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 330941, Location: 2.0 MI SW OF ONEIDA (Lat: 43.083928, Lng: -75.693842), Route carried "on" structure: County highway , Year Built: 1931, Year Reconstructed: 1968, Status: Open, Structure Length: 1.34m (4.40ft), Average Daily Traffic: 2,529 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 3,149 (year 2025), Design Load: H 20, Features Intersected: COWASELON CREEK, Facility Carried by Structure: COUNTY ROAD 14 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.8m (42.0ft), Curb-To-Curb Width: 8.4m (27.6ft), Out-to-Out Width: 8.5m (27.9ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Fair, Operating Rating: 59.1 metric tons, Inventory Rating: 24.6 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.34m (4.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $248,000, Roadway Improvement Cost: $148,000, Total Project Cost: $396,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 330942, Location: 3.0 MI SW OF ONEIDA (Lat: 43.062544, Lng: -75.701058), Route carried "on" structure: County highway , Year Built: 2004, Status: Open, Structure Length: 1.56m (5.12ft), Average Daily Traffic: 2,737 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 3,408 (year 2025), Features Intersected: COWASELON CREEK, Facility Carried by Structure: UPPR LENOX AVENUE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.9m (32.5ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.5m (27.9ft), Curb-To-Curb Width: 9.0m (29.5ft), Out-to-Out Width: 9.9m (32.5ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Good, Operating Rating: 53.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.56m (5.12ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $248,000, Roadway Improvement Cost: $148,000, Total Project Cost: $396,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 442411, Location: AT CITY OF ONEIDA (Lat: 43.103619, Lng: -75.683322), Route carried "on" structure: County highway , Year Built: 1925, Status: Posted for load, Structure Length: 0.60m (1.97ft), Average Daily Traffic: 863 (year 2005), Truck Traffic: 3%, Average Future Daily Traffic: 1,070 (year 2025), Features Intersected: OLD ERIE CANAL, Facility Carried by Structure: COUNTY ROAD 13 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.0m (19.7ft), Curb-To-Curb Width: 6.0m (19.7ft), Out-to-Out Width: 7.0m (23.0ft) Condition: Deck: Poor, Superstructure: Fair, Substructure: Satisfactory, Channel: Very good, Operating Rating: 11.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 7.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Meets minimum limits, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 0.60m (1.97ft), Designated Inspection Frequency: Every 12 months, Inspection Date: May 2007, Bridge Improvement Cost: $135,000, Roadway Improvement Cost: $81,000, Total Project Cost: $216,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 442419, Location: 500 FT.NO.INT.RTS 316&46 (Lat: 43.115497, Lng: -75.671261), Route carried "on" structure: State highway 316, Year Built: 1925, Status: Posted for load-capacity, Structure Length: 0.64m (2.10ft), Average Daily Traffic: 3,763 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 4,686 (year 2027), Features Intersected: OLD ERIE CANAL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.399, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.4m (21.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.0m, Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Very good, Superstructure: Serious, Substructure: Fair, Channel: Good, Operating Rating: 49.2 metric tons, Inventory Rating: 9.7 metric tons, Structural Evaluation: High priority of replacement, Deck Geometry: High priority of corrective action, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.64m (2.10ft), Designated Inspection Frequency: Every 12 months, Inspection Date: August 2007, Bridge Improvement Cost: $601,000, Roadway Improvement Cost: $405,000, Total Project Cost: $1,006,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 502567, Location: 0.3 MI S JCT RTS 316 + 46 (Lat: 43.110292, Lng: -75.664661), Route carried "on" structure: State highway 46, Year Built: 1954, Status: Open, Structure Length: 6.12m (20.08ft), Average Daily Traffic: 7,312 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 9,110 (year 2026), Design Load: HS 20, Features Intersected: RTE I90 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 9.269, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Toll Authority, Approaching Roadway Width: 10.9m (35.8ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 18.3m (60.0ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 10.9m (35.8ft), Out-to-Out Width: 13.1m (43.0ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.12m (20.08ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $1,436,000, Roadway Improvement Cost: $849,000, Total Project Cost: $2,285,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 5512859, Location: 4 MI W EXIT 33 OF I90 (Lat: 43.111989, Lng: -75.658944), Route carried "on" structure: Interstate 90, Year Built: 1953, Status: Open, Structure Length: 5.43m (17.81ft), Average Daily Traffic: 34,358 (year 2007), Truck Traffic: 21%, Average Future Daily Traffic: 52,819 (year 2027), Design Load: HS 20+Mod, Features Intersected: NO LAKE ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.462, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 23.8m (78.1ft), Skew: 31 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 20.4m (66.9ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 29.9m (98.1ft), Out-to-Out Width: 34.6m (113.5ft) Condition: Deck: Poor, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 59.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 5.43m (17.81ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $3,331,000, Roadway Improvement Cost: $1,922,000, Total Project Cost: $5,253,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 5513059, Location: 3.8 MI W EXIT 33 OF I90 (Lat: 43.113331, Lng: -75.654319), Route carried "on" structure: Interstate 90, Year Built: 1993, Status: Open, Structure Length: 4.87m (15.98ft), Average Daily Traffic: 34,737 (year 2006), Truck Traffic: 21%, Average Future Daily Traffic: 53,401 (year 2026), Design Load: HS 20+Mod, Features Intersected: ONEIDA CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.465, Lanes on structure: 4, Base Highway Network: Yes, Toll: On Interstate toll segment, Owner: State Toll Authority, Approaching Roadway Width: 29.8m (97.8ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 47.5m (155.8ft), Curb-To-Curb Width: 34.5m (113.2ft), Out-to-Out Width: 35.3m (115.8ft) Condition: Deck: Very good, Superstructure: Excellent, Substructure: Very good, Channel: Very good, Operating Rating: 76.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.87m (15.98ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $3,331,000, Roadway Improvement Cost: $1,922,000, Total Project Cost: $5,253,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Galvanized Reinforcing Find on map >>
Structure Number: 502567, Location: 0.3 MI S JCT RTS 316 + 46 (Lat: 43.110292, Lng: -75.664661), Route carried "under" structure: Interstate 90, Year Built: 1954, Structure Length: 6.12m (20.08ft), Average Daily Traffic: 34,358 (year 2007), Truck Traffic: 21%, Features Intersected: RTE I90, Facility Carried by Structure: RTE 46 Minimum Vertical Clearance: 4.39m (14.40ft), Kilometerpoint: 3.427, Lanes on structure: 2, Lanes under structure: 4, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 18.3m (60.0ft) Find on map >>
Structure Number: 5512859, Location: 4 MI W EXIT 33 OF I90 (Lat: 43.111989, Lng: -75.658944), Route carried "under" structure: City street , Year Built: 1953, Structure Length: 5.43m (17.81ft), Average Daily Traffic: 200 (year 2000), Truck Traffic: 6%, Features Intersected: NO LAKE ST, Facility Carried by Structure: RTE I90 Minimum Vertical Clearance: 6.02m (19.75ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Toll: On toll road, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 20.4m (66.9ft) Discuss this city on our hugely popular New York forum Back to: Oneida, NY, New York, All US cities.
|
![]() |