Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Orinda, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 144ft / 44.4mTotal length
  • $1,794,000Total costs
  • 794,801Total average daily traffic
  • 21,698Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Orinda
  • No street view available for this location

New bridges in Orinda, CA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 41950-1959
  • 141960-1969
  • 32010-2019
Average Bridge Daily Traffic in Orinda, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 75.0%Good
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 83.3%Good
  • 16.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 91.7%Good
  • 8.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 62.5%Very good
  • 12.5%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 28 0103L,  Location: 04-CC-024-R2.31-ORIN (Lat: 37.879086,  Lng: -122.184797),  Route carried "on" structure: State highway 24,  Year Built: 1969,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 79,500 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 116,615 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: CAMINO PABLO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.310,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0103R,  Location: 04-CC-024-R2.31-ORIN (Lat: 37.878236,  Lng: -122.183344),  Route carried "on" structure: State highway 24,  Year Built: 1954,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 79,500 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 117,394 (year 2041),  Design Load: HS 20,  Features Intersected: CAMINO PABLO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.310,  Lanes on structure: 5,  Lanes under structure: 6,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.3m (89.6ft),  Curb-To-Curb Width: 23.3m (76.4ft),  Out-to-Out Width: 23.9m (78.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0111,  Location: 04-CC-024-R3.47-ORIN (Lat: 37.891989,  Lng: -122.171486),  Route carried "on" structure: City street ,  Year Built: 1969,  Status: Open,  Structure Length: 8.20m (26.90ft),  Average Daily Traffic: 4,500 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,453 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: STATE ROUTE 24 & BARTD,  Facility Carried by Structure: ST STEPHENS DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28 0187,  Location: 04-CC-024-1.20 (Lat: 37.867797,  Lng: -122.198556),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 9.33m (30.61ft),  Average Daily Traffic: 4,460 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,413 (year 2042),  Design Load: HS 20,  Features Intersected: STATE ROUTE 24,  Facility Carried by Structure: WILDER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 84.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28C0161,  Location: BTWN SR 24E & SR 24W (Lat: 37.878708,  Lng: -122.184369),  Route carried "on" structure: City street ,  Year Built: 1969,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 3,000 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,804 (year 2040),  Features Intersected: CAMINO PABLO ROAD,  Facility Carried by Structure: PARKING LOT ACCESS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: Local Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28C0227,  Location: 0.4 MI N HAPPY VALLEY RD (Lat: 37.921564,  Lng: -122.164386),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 4.12m (13.52ft),  Average Daily Traffic: 1,040 (year 2013),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,336 (year 2037),  Design Load: HS 20,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: BEAR CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.6m (34.8ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 26.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28C0331,  Location: 0.2 MI E/O CAMINO PABLO (Lat: 37.901394,  Lng: -122.207086),  Route carried "on" structure: City street ,  Year Built: 1957,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 955 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,665 (year 2042),  Features Intersected: SAN PABLO CREEK,  Facility Carried by Structure: BEAR CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: December 2021,  Other Special Inspection Date: April 2019,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28C038,  Location: EAST OF SOUTH 'H' ST (Lat: 38.037614,  Lng: -122.266864),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 440 (year 2013),  Truck Traffic: 2%,  Average Future Daily Traffic: 751 (year 2037),  Features Intersected: RODEO CREEK,  Facility Carried by Structure: FIRST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28C0387,  Location: AT CAMINO PABLO (Lat: 37.885944,  Lng: -122.193156),  Route carried "on" structure: City street ,  Year Built: 1920,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 6,000 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,977 (year 2040),  Features Intersected: SAN PABLO CREEK,  Facility Carried by Structure: ORINDA WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.6m (41.3ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 33.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28C0388,  Location: 75 FT E CAMINO PABLO (Lat: 37.883758,  Lng: -122.191806),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,514 (year 1968),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,370 (year 2038),  Features Intersected: SAN PABLO CREEK,  Facility Carried by Structure: CAMINO SOBRANTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Poor,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,068,000,  Roadway Improvement Cost: $213,000,  Total Project Cost: $1,794,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 28C049,  Location: AT BROOKSIDE DR (Lat: 37.963919,  Lng: -122.354678),  Route carried "on" structure: City street ,  Year Built: 2012,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 18,800 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 28,444 (year 2040),  Features Intersected: SAN PABLO CREEK,  Facility Carried by Structure: RUMRILL BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28C0494,  Location: .1 MI E OF WILDER RD (Lat: 37.865486,  Lng: -122.192856),  Route carried "on" structure: City street ,  Year Built: 2011,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 300 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 389 (year 2042),  Design Load: HS 20,  Features Intersected: QUERCUS CREEK,  Facility Carried by Structure: ORINDA BALLFLD LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28C0498,  Location: 0.2 MI E OF CAMINO PABLO (Lat: 37.893675,  Lng: -122.202217),  Route carried "on" structure: City street ,  Year Built: 2014,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 612 (year 2010),  Average Future Daily Traffic: 1,641 (year 2042),  Design Load: HS 20,  Features Intersected: SAN PABLO CREEK,  Facility Carried by Structure: MANZANITA DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0103K,  Location: 04-CC-024-R2.31-ORIN (Lat: 37.879211,  Lng: -122.185011),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 4,460 (year 2019),  Truck Traffic: 1%,  Features Intersected: CAMINO PABLO,  Facility Carried by Structure: W24-CAMINO PABLO
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 28 0103L,  Location: 04-CC-024-R2.31-ORIN (Lat: 37.879086,  Lng: -122.184797),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 4,460 (year 2019),  Truck Traffic: 1%,  Features Intersected: CAMINO PABLO,  Facility Carried by Structure: STATE ROUTE 24 WB
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 28 0103R,  Location: 04-CC-024-R2.31-ORIN (Lat: 37.878236,  Lng: -122.183344),  Route carried "under" structure: City street ,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 4,460 (year 2017),  Truck Traffic: 1%,  Features Intersected: CAMINO PABLO,  Facility Carried by Structure: STATE ROUTE 24 EB
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.3m (89.6ft)

Find on map >>   Show street view

Structure Number: 28 0111,  Location: 04-CC-024-R3.47-ORIN (Lat: 37.891989,  Lng: -122.171486),  Route carried "under" structure: State highway 24,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 159,000 (year 2017),  Truck Traffic: 3%,  Features Intersected: STATE ROUTE 24 & BARTD,  Facility Carried by Structure: ST STEPHENS DRIVE
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 3.470,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 28 0187,  Location: 04-CC-024-1.20 (Lat: 37.867797,  Lng: -122.198556),  Route carried "under" structure: State highway 24,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 159,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: STATE ROUTE 24,  Facility Carried by Structure: WILDER ROAD
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 1.200,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 28 0253,  Location: 04-CC-024-R2.40-ORIN (Lat: 37.880364,  Lng: -122.185175),  Route carried "under" structure: Ramp State highway 24,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 161,300 (year 2017),  Truck Traffic: 3%,  Features Intersected: SR 24 ON & OFF-RAMPS,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 2.400,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: 28C0161,  Location: BTWN SR 24E & SR 24W (Lat: 37.878708,  Lng: -122.184369),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 33,500 (year 2008),  Truck Traffic: 1%,  Features Intersected: CAMINO PABLO ROAD,  Facility Carried by Structure: PARKING LOT ACCESS
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 28C0162,  Location: OVER CAMINO PABLO (Lat: 37.878478,  Lng: -122.183789),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 33,500 (year 2008),  Truck Traffic: 1%,  Features Intersected: CAMINO PABLO RD,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 28C0163,  Location: ADJACENT TO SR24 (Lat: 37.878397,  Lng: -122.183650),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 33,500 (year 2008),  Truck Traffic: 1%,  Features Intersected: CAMINO PABLO RD,  Facility Carried by Structure: ORINDA BART STA.
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.4m (89.9ft)

Discuss Orinda, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.