![]() |
Bridge Statistics for Ossining, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Ossining, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 12 Total length: 62 meters (203ft) Total costs: $12,493,000 Total average daily traffic: 107,717 Total average daily truck traffic: 6,552 National Bridge Inventory (NBI) Registered Bridges for Ossining
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 100495, Location: 0.2 MI N JCT RTS 9 & 133 (Lat: 41.165247, Lng: -73.861550), Route carried "on" structure: US 9, Year Built: 1983, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 16,527 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 23,138 (year 2026), Design Load: HS 20, Features Intersected: SING SING CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 21.863, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.6m (11.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 16.1m (52.8ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 75.1 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.85m (2.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $304,000, Roadway Improvement Cost: $181,000, Total Project Cost: $485,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100619, Location: JCT SH 9A & SH 133 (Lat: 41.168303, Lng: -73.838350), Route carried "on" structure: State highway 9A, Year Built: 1932, Status: Open, Structure Length: 2.04m (6.69ft), Average Daily Traffic: 35,706 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 49,988 (year 2027), Features Intersected: RTE 133 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 23.964, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 17.3m (56.8ft), Curb-To-Curb Width: 13.7m (44.9ft), Out-to-Out Width: 15.2m (49.9ft) Condition: Superstructure: Good, Substructure: Good, Operating Rating: 55.7 metric tons, Inventory Rating: 22.3 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 2.04m (6.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2006, Bridge Improvement Cost: $687,000, Roadway Improvement Cost: $409,000, Total Project Cost: $1,096,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 10062, Location: .2 MI N JCT SH 9A & SH133 (Lat: 41.171819, Lng: -73.839658), Route carried "on" structure: Other road , Year Built: 1932, Year Reconstructed: 1963, Status: Open, Structure Length: 1.73m (5.68ft), Average Daily Traffic: 3,436 (year 1997), Truck Traffic: 6%, Average Future Daily Traffic: 4,984 (year 2017), Features Intersected: RTE 9A, Facility Carried by Structure: RYDER ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.0m (45.9ft), Curb-To-Curb Width: 16.7m (54.8ft), Out-to-Out Width: 18.0m (59.1ft) Condition: Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 57.7 metric tons, Inventory Rating: 23.8 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.73m (5.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2006, Bridge Improvement Cost: $693,000, Roadway Improvement Cost: $412,000, Total Project Cost: $1,105,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 222518, Location: IN OSSINING (Lat: 41.163183, Lng: -73.863422), Route carried "on" structure: City street , Year Built: 1861, Year Reconstructed: 1993, Status: Open, Structure Length: 2.68m (8.79ft), Average Daily Traffic: 854 (year 1995), Truck Traffic: 8%, Average Future Daily Traffic: 1,196 (year 2015), Features Intersected: KILL BROOK, AQUEDUCT, Facility Carried by Structure: BROADWAY Minimum Vertical Clearance: 5.71m (18.73ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Masonry, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 20.1m (65.9ft), Curb or Sidewalk Widths: Left: 1.1m (3.6ft), Right: 0.0m, Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 8.4m (27.6ft) Condition: Superstructure: Fair, Substructure: Satisfactory, Channel: Serious, Operating Rating: 44.1 metric tons, Inventory Rating: 17.2 metric tons, Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.68m (8.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $500,000, Roadway Improvement Cost: $297,000, Total Project Cost: $797,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 222519, Location: IN OSSINING (Lat: 41.160694, Lng: -73.865731), Route carried "on" structure: City street , Year Built: 1920, Year Reconstructed: 1988, Status: Open, Structure Length: 2.46m (8.07ft), Average Daily Traffic: 1,468 (year 1995), Truck Traffic: 8%, Average Future Daily Traffic: 2,055 (year 2015), Design Load: HS 20, Features Intersected: KILL BROOK, Facility Carried by Structure: BRANDRETH STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 24.3m (79.7ft), Curb or Sidewalk Widths: Left: 2.1m (6.9ft), Right: 0.0m, Curb-To-Curb Width: 8.3m (27.2ft), Out-to-Out Width: 11.2m (36.7ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 79.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 56.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.46m (8.07ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $614,000, Roadway Improvement Cost: $366,000, Total Project Cost: $980,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 225715, Location: IN VILLAGE OF OSSINING (Lat: 41.157467, Lng: -73.869111), Route carried "on" structure: Other road , Year Built: 1980, Year Reconstructed: 1991, Status: Open, Structure Length: 11.24m (36.88ft), Average Daily Traffic: 2,329 (year 1997), Truck Traffic: 6%, Average Future Daily Traffic: 3,378 (year 2017), Design Load: H 20, Features Intersected: WESTERLY ROAD, MNRR HU L, Facility Carried by Structure: SECOR ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 3, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.0m (23.0ft), Skew: 9 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 8, Length of Maximum Span: 19.8m (65.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.0m, Curb-To-Curb Width: 6.8m (22.3ft), Out-to-Out Width: 9.1m (29.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 55.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: High priority of replacement, Length Of Structure Improvement: 11.24m (36.88ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $1,164,000, Roadway Improvement Cost: $692,000, Total Project Cost: $1,856,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 771277, Location: AT OSSINNING (Lat: 41.149769, Lng: -73.868636), Route carried "on" structure: Other road , Year Built: 1966, Status: Open, Structure Length: 2.07m (6.79ft), Average Daily Traffic: 2,377 (year 1995), Truck Traffic: 8%, Average Future Daily Traffic: 3,161 (year 2015), Features Intersected: MNRR HU LINE, Facility Carried by Structure: PRISON ROAD Minimum Vertical Clearance: 4.21m (13.81ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: State Agenciy, Maintenance Responsibility: Railroad, Approaching Roadway Width: 4.8m (15.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 19.8m (65.0ft), Curb-To-Curb Width: 4.8m (15.7ft), Out-to-Out Width: 6.0m (19.7ft) Condition: Deck: Poor, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 85.3 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 2.07m (6.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $279,000, Roadway Improvement Cost: $166,000, Total Project Cost: $445,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 771279, Location: IN OSSINING (Lat: 41.161781, Lng: -73.869167), Route carried "on" structure: Other road , Year Built: 1913, Year Reconstructed: 1991, Status: Open, Structure Length: 15.66m (51.38ft), Average Daily Traffic: 1,096 (year 1995), Truck Traffic: 6%, Average Future Daily Traffic: 1,590 (year 2015), Design Load: HS 20, Features Intersected: WESTERLY ROAD WAY, MNRR, Facility Carried by Structure: WESTERLY ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 6, Length of Maximum Span: 32.9m (107.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.0m (3.3ft), Curb-To-Curb Width: 8.2m (26.9ft), Out-to-Out Width: 10.4m (34.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 49.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 25.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 15.66m (51.38ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2007, Critical Feature Inspection Date: June 2007, Bridge Improvement Cost: $3,625,000, Roadway Improvement Cost: $2,104,000, Total Project Cost: $5,729,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 100619, Location: JCT SH 9A & SH 133 (Lat: 41.168303, Lng: -73.838350), Route carried "under" structure: State highway 133, Year Built: 1932, Structure Length: 2.04m (6.69ft), Average Daily Traffic: 7,598 (year 2006), Truck Traffic: 6%, Features Intersected: RTE 133, Facility Carried by Structure: RTE 9A Minimum Vertical Clearance: 0.49m (1.61ft), Kilometerpoint: 2.156, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 17.3m (56.8ft) Find on map >>
Structure Number: 10062, Location: .2 MI N JCT SH 9A & SH133 (Lat: 41.171819, Lng: -73.839658), Route carried "under" structure: State highway 9A, Year Built: 1932, Structure Length: 1.73m (5.68ft), Average Daily Traffic: 35,706 (year 2007), Truck Traffic: 6%, Features Intersected: RTE 9A, Facility Carried by Structure: RYDER ROAD Minimum Vertical Clearance: 4.87m (15.98ft), Kilometerpoint: 24.409, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 14.0m (45.9ft) Find on map >>
Structure Number: 552327, Location: 0.2 MI W OF ALB POST RD (Lat: 41.165186, Lng: -73.864519), Route carried "under" structure: Alternate City street , Year Built: 1840, Structure Length: 3.93m (12.89ft), Average Daily Traffic: 500 (year 2007), Truck Traffic: 6%, Features Intersected: BROADWAY, KILL BROOK, Facility Carried by Structure: ABAND AQUEDUCT Minimum Vertical Clearance: 3.75m (12.30ft), Kilometerpoint: 0.000, Lanes under structure: 2, Material/Design: Masonry, Design/Construction: Arch - Deck, Length of Maximum Span: 28.9m (94.8ft) Find on map >>
Structure Number: 771279, Location: IN OSSINING (Lat: 41.161781, Lng: -73.869167), Route carried "under" structure: Other road , Year Built: 1913, Structure Length: 15.66m (51.38ft), Average Daily Traffic: 120 (year 2007), Truck Traffic: 6%, Features Intersected: WESTERLY ROAD WAY, MNRR, Facility Carried by Structure: WESTERLY ROAD Minimum Vertical Clearance: 4.26m (13.98ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.9m (107.9ft) Discuss this city on our hugely popular New York forum Back to: Ossining, NY, New York, All US cities.
|
![]() |