![]() |
Bridge Statistics for Pamelia, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Pamelia, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 28 Total length: 149 meters (489ft) Total costs: $27,708,000 Total average daily traffic: 168,072 Total average daily truck traffic: 31,302 National Bridge Inventory (NBI) Registered Bridges for Pamelia
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 1009681, Location: JCT I81 & SH 12 (Lat: 44.001156, Lng: -75.919806), Route carried "on" structure: Interstate 81, Year Built: 1959, Year Reconstructed: 2003, Status: Open, Structure Length: 4.54m (14.90ft), Average Daily Traffic: 10,804 (year 2007), Truck Traffic: 17%, Average Future Daily Traffic: 15,453 (year 2027), Design Load: HS 20, Features Intersected: RTE 12 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 44.064, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 20.1m (65.9ft), Curb-To-Curb Width: 11.7m (38.4ft), Out-to-Out Width: 12.7m (41.7ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 63.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.54m (14.90ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2007, Bridge Improvement Cost: $1,743,000, Roadway Improvement Cost: $1,187,000, Total Project Cost: $2,930,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1009682, Location: JCT I81 & SH 12 (Lat: 44.000878, Lng: -75.919653), Route carried "on" structure: Interstate 81, Year Built: 1959, Year Reconstructed: 2003, Status: Open, Structure Length: 4.54m (14.90ft), Average Daily Traffic: 10,804 (year 2007), Truck Traffic: 17%, Average Future Daily Traffic: 15,453 (year 2027), Design Load: HS 20, Features Intersected: RTE 12 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 44.064, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 20.1m (65.9ft), Curb-To-Curb Width: 11.7m (38.4ft), Out-to-Out Width: 12.7m (41.7ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 64.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.54m (14.90ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2007, Bridge Improvement Cost: $1,743,000, Roadway Improvement Cost: $1,187,000, Total Project Cost: $2,930,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 100969, Location: .6 MT N JCT RTE 12&I81 (Lat: 44.009683, Lng: -75.924597), Route carried "on" structure: State highway 12, Year Built: 1985, Status: Open, Structure Length: 1.82m (5.97ft), Average Daily Traffic: 4,602 (year 2005), Truck Traffic: 7%, Average Future Daily Traffic: 5,301 (year 2025), Design Load: HS 20, Features Intersected: PHILOMEL CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.998, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 16.7m (54.8ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 12.9m (42.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Channel: Very good, Operating Rating: 59.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.82m (5.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $509,000, Roadway Improvement Cost: $303,000, Total Project Cost: $812,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1010081, Location: JCT RTS 12E + I-81 SB (Lat: 43.996703, Lng: -75.931972), Route carried "on" structure: Interstate 81, Year Built: 1959, Status: Open, Structure Length: 6.46m (21.19ft), Average Daily Traffic: 12,017 (year 2005), Truck Traffic: 17%, Average Future Daily Traffic: 17,188 (year 2025), Design Load: HS 20, Features Intersected: RTE 12E, CSX TRANSPRTATI Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 39.871, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 24.3m (79.7ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Operating Rating: 65.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 48.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.46m (21.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $346,000, Roadway Improvement Cost: $206,000, Total Project Cost: $552,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1010082, Location: JCT RTS 12E + I-81 NB (Lat: 43.996511, Lng: -75.931783), Route carried "on" structure: Interstate 81, Year Built: 1959, Year Reconstructed: 2003, Status: Open, Structure Length: 6.46m (21.19ft), Average Daily Traffic: 24,033 (year 2005), Truck Traffic: 17%, Average Future Daily Traffic: 34,374 (year 2025), Design Load: HS 20, Features Intersected: RTE 12E, CSX TRANSPRTATI Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 39.871, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 24.3m (79.7ft), Curb-To-Curb Width: 11.7m (38.4ft), Out-to-Out Width: 12.7m (41.7ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Operating Rating: 66.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.46m (21.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $346,000, Roadway Improvement Cost: $206,000, Total Project Cost: $552,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 102378, Location: 0.3 MI N JCT RTS 11 & 37 (Lat: 44.005931, Lng: -75.901906), Route carried "on" structure: State highway 37, Year Built: 1993, Status: Open, Structure Length: 1.24m (4.07ft), Average Daily Traffic: 3,012 (year 2006), Truck Traffic: 7%, Average Future Daily Traffic: 3,469 (year 2026), Design Load: HS 20, Features Intersected: KELSEY CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.274, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.9m (35.8ft), Curb-To-Curb Width: 10.3m (33.8ft), Out-to-Out Width: 11.2m (36.7ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Good, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.24m (4.07ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $458,000, Roadway Improvement Cost: $273,000, Total Project Cost: $731,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 103223, Location: 3.6 MI N JCT I-81 + 342 (Lat: 44.087972, Lng: -75.914625), Route carried "on" structure: County highway , Year Built: 1965, Status: Open, Structure Length: 9.05m (29.69ft), Average Daily Traffic: 428 (year 2000), Truck Traffic: 6%, Average Future Daily Traffic: 571 (year 2020), Design Load: HS 20, Features Intersected: RTE I81, RTE I81, Facility Carried by Structure: COUNTY ROAD 16 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 19.8m (65.0ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 55.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.05m (29.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $2,272,000, Roadway Improvement Cost: $1,318,000, Total Project Cost: $3,590,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1032241, Location: 3.7 MI S JCT I-81 + 411 (Lat: 44.137183, Lng: -75.882031), Route carried "on" structure: Interstate 81, Year Built: 1965, Status: Open, Structure Length: 3.99m (13.09ft), Average Daily Traffic: 4,754 (year 2007), Truck Traffic: 31%, Average Future Daily Traffic: 5,928 (year 2027), Design Load: HS 20, Features Intersected: COUNTY ROAD 15 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 62.571, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 14.9m (48.9ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.6m (34.8ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.99m (13.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $363,000, Roadway Improvement Cost: $208,000, Total Project Cost: $571,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1032242, Location: 3.7 MI S JCT I-81 + 411 (Lat: 44.137075, Lng: -75.881553), Route carried "on" structure: Interstate 81, Year Built: 1965, Status: Open, Structure Length: 3.99m (13.09ft), Average Daily Traffic: 4,754 (year 2007), Truck Traffic: 31%, Average Future Daily Traffic: 5,928 (year 2027), Design Load: HS 20, Features Intersected: COUNTY ROAD 15 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 62.571, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.0m (32.8ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 14.9m (48.9ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.6m (34.8ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.99m (13.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $363,000, Roadway Improvement Cost: $208,000, Total Project Cost: $571,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1043261, Location: 1.1 MI S JCT I-81 & 342 (Lat: 44.020147, Lng: -75.916694), Route carried "on" structure: Interstate 81, Year Built: 1959, Status: Open, Structure Length: 2.43m (7.97ft), Average Daily Traffic: 10,804 (year 2007), Truck Traffic: 17%, Average Future Daily Traffic: 15,453 (year 2027), Design Load: HS 20, Features Intersected: PHILOMEL CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 44.075, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.2m (36.7ft), Skew: 2 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 5.1m (16.7ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 75.9 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.43m (7.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $736,000, Roadway Improvement Cost: $438,000, Total Project Cost: $1,174,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1043262, Location: 1.1 MI S JCT I-81 & 342 (Lat: 44.020681, Lng: -75.915533), Route carried "on" structure: Interstate 81, Year Built: 1959, Status: Open, Structure Length: 2.43m (7.97ft), Average Daily Traffic: 10,804 (year 2007), Truck Traffic: 17%, Average Future Daily Traffic: 15,453 (year 2027), Design Load: HS 20, Features Intersected: PHILOMEL CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 44.075, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.2m (36.7ft), Skew: 2 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 5.1m (16.7ft) Condition: Channel: Good, Culverts: Satisfactory, Operating Rating: 75.9 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.43m (7.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $736,000, Roadway Improvement Cost: $438,000, Total Project Cost: $1,174,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 104327, Location: JCT OF RTE I-81 + 342 (Lat: 44.035183, Lng: -75.914639), Route carried "on" structure: State highway 342, Year Built: 1965, Year Reconstructed: 1990, Status: Open, Structure Length: 9.35m (30.68ft), Average Daily Traffic: 2,178 (year 2002), Truck Traffic: 7%, Average Future Daily Traffic: 2,509 (year 2022), Design Load: H 20, Features Intersected: RTE I81, RTE I81 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.804, Lanes on structure: 2, Lanes under structure: 5, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.6m (34.8ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 21.3m (69.9ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.35m (30.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Bridge Improvement Cost: $2,161,000, Roadway Improvement Cost: $1,254,000, Total Project Cost: $3,415,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 104328, Location: 1.3 MI N JCT I81 & SH 342 (Lat: 44.054517, Lng: -75.918864), Route carried "on" structure: City street , Year Built: 1965, Status: Open, Structure Length: 10.08m (33.07ft), Average Daily Traffic: 517 (year 2000), Truck Traffic: 4%, Average Future Daily Traffic: 620 (year 2020), Design Load: HS 20, Features Intersected: RTE I81, RTE I81, Facility Carried by Structure: MILITARY RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 22.2m (72.8ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 59.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 10.08m (33.07ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $2,161,000, Roadway Improvement Cost: $1,254,000, Total Project Cost: $3,415,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 10433, Location: 2.5 MI N JCT I81 & SH 342 (Lat: 44.073864, Lng: -75.917828), Route carried "on" structure: City street , Year Built: 1965, Status: Open, Structure Length: 11.12m (36.48ft), Average Daily Traffic: 275 (year 1999), Truck Traffic: 4%, Average Future Daily Traffic: 330 (year 2019), Design Load: HS 20, Features Intersected: RTE I81, RTE I81, Facility Carried by Structure: PERCH LAKE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 18.6m (61.0ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 62.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.12m (36.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $2,161,000, Roadway Improvement Cost: $1,254,000, Total Project Cost: $3,415,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1094641, Location: 4.6 MI S JCT I-81 + 411 (Lat: 44.124636, Lng: -75.884561), Route carried "on" structure: Interstate 81, Year Built: 1965, Status: Open, Structure Length: 1.52m (4.99ft), Average Daily Traffic: 4,754 (year 2007), Truck Traffic: 31%, Average Future Daily Traffic: 5,928 (year 2027), Design Load: HS 20, Features Intersected: GILLETTE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 62.584, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.9m (12.8ft) Condition: Channel: Very good, Culverts: Good, Operating Rating: 75.4 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.52m (4.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $460,000, Roadway Improvement Cost: $274,000, Total Project Cost: $734,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1094642, Location: 4.6 MI S JCT I-81 + 411 (Lat: 44.124642, Lng: -75.882536), Route carried "on" structure: Interstate 81, Year Built: 1965, Status: Open, Structure Length: 1.52m (4.99ft), Average Daily Traffic: 4,754 (year 2007), Truck Traffic: 31%, Average Future Daily Traffic: 5,928 (year 2027), Design Load: HS 20, Features Intersected: GILLETTE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 56.469, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.9m (12.8ft) Condition: Channel: Very good, Culverts: Good, Operating Rating: 75.4 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.52m (4.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $460,000, Roadway Improvement Cost: $274,000, Total Project Cost: $734,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 336337, Location: 4.2 MILES S OF ORLEANS (Lat: 44.138017, Lng: -75.886072), Route carried "on" structure: County highway , Year Built: 1971, Status: Open, Structure Length: 0.67m (2.20ft), Average Daily Traffic: 258 (year 2001), Truck Traffic: 6%, Average Future Daily Traffic: 344 (year 2021), Features Intersected: EISS CREEK, Facility Carried by Structure: PERCH LAKE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 5.7m (18.7ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.3m (10.8ft) Condition: Channel: Fair, Culverts: Fair, Structural Evaluation: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.67m (2.20ft), Designated Inspection Frequency: Every 12 months, Inspection Date: October 2007, Bridge Improvement Cost: $151,000, Roadway Improvement Cost: $90,000, Total Project Cost: $241,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 552384, Location: .2 MI W OF I81 AT PERCH L (Lat: 44.122742, Lng: -75.889206), Route carried "on" structure: City street , Year Built: 1968, Year Reconstructed: 1978, Status: Posted for load, Structure Length: 1.58m (5.18ft), Truck Traffic: 4%, Features Intersected: GILLETTE CREEK, Facility Carried by Structure: PERCH LAKE EXT Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: State Agenciy, Approaching Roadway Width: 2.7m (8.9ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Length of Maximum Span: 15.2m (49.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 3.3m (10.8ft), Out-to-Out Width: 3.7m (12.1ft) Condition: Deck: Serious, Superstructure: Good, Substructure: Good, Channel: Very good, Operating Rating: 10.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 8.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Meets minimum limits, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 1.58m (5.18ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: October 2007, Critical Feature Inspection Date: October 2007, Bridge Improvement Cost: $105,000, Roadway Improvement Cost: $62,000, Total Project Cost: $167,000 ( Estimate for 2007), Deck Structure Type: Open Grating Find on map >>
Structure Number: 1009681, Location: JCT I81 & SH 12 (Lat: 44.001156, Lng: -75.919806), Route carried "under" structure: State highway 12, Year Built: 1959, Structure Length: 4.54m (14.90ft), Average Daily Traffic: 5,822 (year 2007), Truck Traffic: 7%, Features Intersected: RTE 12, Facility Carried by Structure: RTE I81 Minimum Vertical Clearance: 0.46m (1.51ft), Kilometerpoint: 0.628, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 20.1m (65.9ft) Find on map >>
Structure Number: 1009682, Location: JCT I81 & SH 12 (Lat: 44.000878, Lng: -75.919653), Route carried "under" structure: State highway 12, Year Built: 1959, Structure Length: 4.54m (14.90ft), Average Daily Traffic: 5,822 (year 2007), Truck Traffic: 7%, Features Intersected: RTE 12, Facility Carried by Structure: RTE I81 Minimum Vertical Clearance: 0.46m (1.51ft), Kilometerpoint: 0.595, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 20.1m (65.9ft) Find on map >>
Structure Number: 1010081, Location: JCT RTS 12E + I-81 SB (Lat: 43.996703, Lng: -75.931972), Route carried "under" structure: State highway 12E, Year Built: 1959, Structure Length: 6.46m (21.19ft), Average Daily Traffic: 4,000 (year 2007), Truck Traffic: 7%, Features Intersected: RTE 12E, CSX TRANSPRTATI, Facility Carried by Structure: RTE I81 Minimum Vertical Clearance: 6.75m (22.15ft), Kilometerpoint: 0.531, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.3m (79.7ft) Find on map >>
Structure Number: 1010082, Location: JCT RTS 12E + I-81 NB (Lat: 43.996511, Lng: -75.931783), Route carried "under" structure: State highway 12E, Year Built: 1959, Structure Length: 6.46m (21.19ft), Average Daily Traffic: 4,000 (year 2007), Truck Traffic: 7%, Features Intersected: RTE 12E, CSX TRANSPRTATI, Facility Carried by Structure: RTE I81 Minimum Vertical Clearance: 6.47m (21.23ft), Kilometerpoint: 0.499, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.3m (79.7ft) Find on map >>
Structure Number: 103223, Location: 3.6 MI N JCT I-81 + 342 (Lat: 44.087972, Lng: -75.914625), Route carried "under" structure: Interstate 81, Year Built: 1965, Structure Length: 9.05m (29.69ft), Average Daily Traffic: 8,350 (year 1996), Truck Traffic: 31%, Features Intersected: RTE I81, RTE I81, Facility Carried by Structure: COUNTY ROAD 16 Minimum Vertical Clearance: 5.02m (16.47ft), Kilometerpoint: 50.185, Lanes on structure: 2, Lanes under structure: 2, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 19.8m (65.0ft) Find on map >>
Structure Number: 1032242, Location: 3.7 MI S JCT I-81 + 411 (Lat: 44.137075, Lng: -75.881553), Route carried "under" structure: County highway , Year Built: 1965, Structure Length: 3.99m (13.09ft), Average Daily Traffic: 10 (year 1975), Truck Traffic: 6%, Features Intersected: COUNTY ROAD 15, Facility Carried by Structure: RTE I81 Minimum Vertical Clearance: 4.36m (14.30ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 14.9m (48.9ft) Find on map >>
Structure Number: 104327, Location: JCT OF RTE I-81 + 342 (Lat: 44.035183, Lng: -75.914639), Route carried "under" structure: Interstate 81, Year Built: 1965, Structure Length: 9.35m (30.68ft), Average Daily Traffic: 10,804 (year 2007), Truck Traffic: 17%, Features Intersected: RTE I81, RTE I81, Facility Carried by Structure: RTE 342 Minimum Vertical Clearance: 0.49m (1.61ft), Kilometerpoint: 44.199, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.3m (69.9ft) Find on map >>
Structure Number: 104328, Location: 1.3 MI N JCT I81 & SH 342 (Lat: 44.054517, Lng: -75.918864), Route carried "under" structure: Interstate 81, Year Built: 1965, Structure Length: 10.08m (33.07ft), Average Daily Traffic: 8,350 (year 1996), Truck Traffic: 31%, Features Intersected: RTE I81, RTE I81, Facility Carried by Structure: MILITARY RD Minimum Vertical Clearance: 0.49m (1.61ft), Kilometerpoint: 46.404, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.2m (72.8ft) Find on map >>
Structure Number: 10433, Location: 2.5 MI N JCT I81 & SH 342 (Lat: 44.073864, Lng: -75.917828), Route carried "under" structure: Interstate 81, Year Built: 1965, Structure Length: 11.12m (36.48ft), Average Daily Traffic: 8,350 (year 1996), Truck Traffic: 31%, Features Intersected: RTE I81, RTE I81, Facility Carried by Structure: PERCH LAKE ROAD Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 48.592, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 18.6m (61.0ft) Find on map >>
Structure Number: 702379, Location: 0.5 MI N JCT RTS 11 + 37 (Lat: 44.008489, Lng: -75.902194), Route carried "under" structure: State highway 37, Year Built: 1911, Structure Length: 1.61m (5.28ft), Average Daily Traffic: 3,012 (year 2006), Truck Traffic: 7%, Features Intersected: RTE 37, Facility Carried by Structure: CSX TRANSPRTATION Minimum Vertical Clearance: 4.24m (13.91ft), Kilometerpoint: 0.772, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 13.7m (44.9ft) Discuss this city on our hugely popular New York forum Back to: Pamelia, NY, New York, All US cities.
|
![]() |