Number of bridges: 17
Total length: 128 meters (420ft)
Total costs: $3,997,000
Total average daily traffic: 100,551
Total average daily truck traffic: 14,674
National Bridge Inventory (NBI) Registered Bridges for Paola

New bridges - Historical Statistics

  • 1970-1979: 12
  • 1980-1989: 0
  • 1990-1999: 0
  • 2000-2009: 5

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 999906800610331,  Location: JCT K68/US169 (Lat: 38.621111,  Lng: -94.835833),  Route carried "on" structure: State highway 68,  Year Built: 1972,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 8.46m (27.76ft),  Average Daily Traffic: 6,690 (year 2007),  Truck Traffic: 12%,  Average Future Daily Traffic: 15,828 (year 2027),  Design Load: HS 20,  Features Intersected: US 169, K7 HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 79.445,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 8.46m (27.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2006,  Bridge Improvement Cost: $281,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $421,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 999916900610261,  Location: 1.64 MI S OF K-263 (Lat: 38.553333,  Lng: -94.871389),  Route carried "on" structure: US 169,  Year Built: 1972,  Status: Open,  Structure Length: 7.24m (23.75ft),  Average Daily Traffic: 5,550 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,929 (year 2027),  Design Load: HS 20,  Features Intersected: BNRR & LOCAL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 204.382,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.24m (23.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2006,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $360,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 999916900610271,  Location: 1.25 MI S OF K-263 (Lat: 38.558056,  Lng: -94.867500),  Route carried "on" structure: US 169,  Year Built: 1972,  Status: Open,  Structure Length: 9.53m (31.27ft),  Average Daily Traffic: 5,550 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,929 (year 2027),  Design Load: HS 20,  Features Intersected: BULL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 205.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.53m (31.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2006,  Bridge Improvement Cost: $316,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $475,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 999916900610281,  Location: 0.70 MI S OF K-263 (Lat: 38.563611,  Lng: -94.860000),  Route carried "on" structure: City street 1705,  Year Built: 1972,  Status: Open,  Structure Length: 9.11m (29.89ft),  Average Daily Traffic: 161 (year 2004),  Truck Traffic: 8%,  Average Future Daily Traffic: 221 (year 2027),  Design Load: HS 20,  Features Intersected: US 169, K7 HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 9.11m (29.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2006,  Bridge Improvement Cost: $302,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $454,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 999916900610291,  Location: JCT US169 & BAPTISTE DR (Lat: 38.570833,  Lng: -94.851111),  Route carried "on" structure: US 169,  Year Built: 1972,  Status: Open,  Structure Length: 8.00m (26.25ft),  Average Daily Traffic: 6,100 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,111 (year 2027),  Design Load: HS 20,  Features Intersected: RS1021, K263 HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 207.039,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2006,  Bridge Improvement Cost: $266,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $398,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 999916900610301,  Location: 0.77 MI N K263 (Lat: 38.578056,  Lng: -94.840000),  Route carried "on" structure: US 169,  Year Built: 1971,  Status: Open,  Structure Length: 1.85m (6.07ft),  Average Daily Traffic: 6,100 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,111 (year 2027),  Design Load: H 20,  Features Intersected: DORSEY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 208.278,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2006,  Bridge Improvement Cost: $46,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $69,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 999916900610311,  Location: 1.50 MI N K263 (Lat: 38.587222,  Lng: -94.834722),  Route carried "on" structure: City street 1021,  Year Built: 1972,  Status: Open,  Structure Length: 8.49m (27.85ft),  Average Daily Traffic: 150 (year 2003),  Truck Traffic: 8%,  Average Future Daily Traffic: 206 (year 2027),  Design Load: H 20,  Features Intersected: US 169 K7 HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 8.49m (27.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2006,  Bridge Improvement Cost: $179,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $269,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 999916900610321,  Location: 0.96 MI S OF K-68 (Lat: 38.609722,  Lng: -94.835278),  Route carried "on" structure: US 169,  Year Built: 1972,  Status: Open,  Structure Length: 4.34m (14.24ft),  Average Daily Traffic: 6,100 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,111 (year 2027),  Design Load: HS 20,  Features Intersected: 287TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 211.916,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.34m (14.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2006,  Bridge Improvement Cost: $144,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $216,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 999916900610961,  Location: 1.64 MI S K-263 HIGHWAY (Lat: 38.553333,  Lng: -94.871389),  Route carried "on" structure: US 169,  Year Built: 2005,  Status: Open,  Structure Length: 7.34m (24.08ft),  Average Daily Traffic: 5,550 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,929 (year 2027),  Design Load: HS 25,  Features Intersected: BNSF RR; LOCAL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 204.382,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.9m (65.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.34m (24.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2006,  Bridge Improvement Cost: $222,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $333,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 999916900610971,  Location: 1.25 MI S K-263 HIGHWAY (Lat: 38.558056,  Lng: -94.867500),  Route carried "on" structure: US 169,  Year Built: 2005,  Status: Open,  Structure Length: 9.53m (31.27ft),  Average Daily Traffic: 5,550 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,929 (year 2027),  Design Load: HS 25,  Features Intersected: BULL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 205.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.53m (31.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2006,  Bridge Improvement Cost: $288,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $432,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 999916900610981,  Location: JCT US-169 & BAPTISTE DR. (Lat: 38.570833,  Lng: -94.851111),  Route carried "on" structure: US 169,  Year Built: 2002,  Status: Open,  Structure Length: 8.02m (26.31ft),  Average Daily Traffic: 6,100 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,111 (year 2027),  Design Load: HS 25,  Features Intersected: RS-1021; BAPTISTE DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 207.039,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.02m (26.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2006,  Bridge Improvement Cost: $242,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $363,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 999916900610991,  Location: .96 MI S K-68 HIGHWAY (Lat: 38.609722,  Lng: -94.835278),  Route carried "on" structure: US 169,  Year Built: 2002,  Status: Open,  Structure Length: 4.58m (15.03ft),  Average Daily Traffic: 6,100 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,111 (year 2027),  Design Load: HS 25,  Features Intersected: 287TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 211.916,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.58m (15.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2006,  Bridge Improvement Cost: $138,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $207,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 999906800610331,  Location: JCT K68/US169 (Lat: 38.621111,  Lng: -94.835833),  Route carried "under" structure: US 169,  Year Built: 1972,  Structure Length: 8.46m (27.76ft),  Average Daily Traffic: 6,250 (year 2007),  Truck Traffic: 21%,  Features Intersected: US 169, K7 HWY,  Facility Carried by Structure: K68 HWY
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 21.104,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>

Structure Number: 999916900610281,  Location: 0.70 MI S OF K-263 (Lat: 38.563611,  Lng: -94.860000),  Route carried "under" structure: US 169,  Year Built: 1972,  Structure Length: 9.11m (29.89ft),  Average Daily Traffic: 11,100 (year 2007),  Truck Traffic: 21%,  Features Intersected: US 169, K7 HWY,  Facility Carried by Structure: RS1705, CENTENNIAL
Minimum Vertical Clearance: 5.07m (16.63ft),  Kilometerpoint: 200.081,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>

Structure Number: 999916900610291,  Location: JCT US169 & BAPTISTE DR (Lat: 38.570833,  Lng: -94.851111),  Route carried "under" structure: City street 1021,  Year Built: 1972,  Structure Length: 8.00m (26.25ft),  Average Daily Traffic: 8,700 (year 2003),  Truck Traffic: 21%,  Features Intersected: RS1021, K263 HWY,  Facility Carried by Structure: US169, K7 HWY, SB
Minimum Vertical Clearance: 0.66m (2.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>

Structure Number: 999916900610311,  Location: 1.50 MI N K263 (Lat: 38.587222,  Lng: -94.834722),  Route carried "under" structure: US 169,  Year Built: 1972,  Structure Length: 8.49m (27.85ft),  Average Daily Traffic: 6,100 (year 2007),  Truck Traffic: 21%,  Features Intersected: US 169 K7 HWY,  Facility Carried by Structure: RS1021
Minimum Vertical Clearance: 5.01m (16.44ft),  Kilometerpoint: 204.616,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>

Structure Number: 999916900610981,  Location: JCT US-169 & BAPTISTE DR. (Lat: 38.570833,  Lng: -94.851111),  Route carried "under" structure: City street 1071,  Year Built: 2002,  Structure Length: 8.02m (26.31ft),  Average Daily Traffic: 8,700 (year 2003),  Truck Traffic: 21%,  Features Intersected: RS-1021; BAPTISTE DR,  Facility Carried by Structure: US-169 HIGHWAY, NB
Minimum Vertical Clearance: 0.66m (2.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Discuss this city on our hugely popular Kansas forum

Back to: Paola, KS, Kansas, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.