Bridge Statistics for Paterson, New Jersey (NJ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 105Number of bridges
  • 1,144m3,753ftTotal length
  • $39,789,000Total costs
  • 2,640,126Total average daily traffic
  • 141,302Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Paterson
  • No street view available for this location

New bridges - Historical Statistics

  • 1Before 1900
  • 91900-1909
  • 11920-1929
  • 21930-1939
  • 461960-1969
  • 191970-1979
  • 31980-1989
  • 241990-1999

Reconstructed bridges - Historical Statistics

  • 11960-1969
  • 01970-1979
  • 71980-1989
  • 31990-1999
  • 12000-2009

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Structure Number: 1600002,  Location: 0.1 MI. EAST OF RT.21 JCT,  Route carried "on" structure: City street ,  Year Built: 1906,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 7.47m (24.51ft),  Average Daily Traffic: 25,908 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 31,608 (year 2033),  Design Load: H 20,  Features Intersected: PASSAIC RIVER,  Facility Carried by Structure: GREGORY AVENUE
Minimum Vertical Clearance: 3.51m (11.52ft),  Kilometerpoint: 2.430,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.2m (108.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 82.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.50m (24.61ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: July 13,  Critical Feature Inspection Date: July 13,  Underwater Inspection Date: July 11,  Bridge Improvement Cost: $25,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $35,000 ( Estimate for 2013),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 1600009,  Location: EAST OF JCT RT 20,  Route carried "on" structure: County highway ,  Year Built: 1905,  Year Reconstructed: 1967,  Status: Posted for load,  Structure Length: 8.23m (27.00ft),  Average Daily Traffic: 2,071 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,485 (year 2033),  Features Intersected: PASSAIC RIVER,  Facility Carried by Structure: FIFTH AVENUE
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 40.8m (133.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 12.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 7.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 9.30m (30.51ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 13,  Critical Feature Inspection Date: August 13,  Other Special Inspection Date: August 14,  Bridge Improvement Cost: $5,000,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $7,400,000 ( Estimate for 2013),  Deck Structure Type: Open Grating
Structure Number: 160001,  Location: AT JCT. OF ROUTE 20,  Route carried "on" structure: City street ,  Year Built: 1907,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 9.91m (32.51ft),  Average Daily Traffic: 20,655 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 28,917 (year 2033),  Features Intersected: PASSAIC RIVER,  Facility Carried by Structure: MAPLE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 9.90m (32.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 13,  Bridge Improvement Cost: $876,000,  Roadway Improvement Cost: $184,000,  Total Project Cost: $1,333,000 ( Estimate for 2013)
Structure Number: 1600011,  Location: 1.20 MI SW OF JCT. RT 208,  Route carried "on" structure: County highway 504,  Year Built: 1926,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 11.89m (39.01ft),  Average Daily Traffic: 28,100 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 37,850 (year 2033),  Design Load: HS 25,  Features Intersected: PASSAIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.412,  Lanes on structure: 3,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 11.90m (39.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 13,  Bridge Improvement Cost: $39,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $64,000 ( Estimate for 2013),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: 1600012,  Location: 0.4 NE OF HALEDON ST(504),  Route carried "on" structure: County highway 652,  Year Built: 1900,  Year Reconstructed: 1987,  Status: Posted for load-capacity,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 8,400 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,080 (year 2033),  Features Intersected: PASSAIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 10.10m (33.14ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 13,  Critical Feature Inspection Date: July 13,  Underwater Inspection Date: July 13,  Bridge Improvement Cost: $6,480,000,  Roadway Improvement Cost: $679,000,  Total Project Cost: $8,644,000 ( Estimate for 2013),  Deck Structure Type: Open Grating
Structure Number: 1600014,  Location: 0.5 MI N OF BROADWAY,  Route carried "on" structure: City street ,  Year Built: 1907,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 7.77m (25.49ft),  Average Daily Traffic: 23,312 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 28,570 (year 2033),  Features Intersected: PASSAIC RIVER,  Facility Carried by Structure: STRAIGHT STREET
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 76.5m (251.0ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 13,  Critical Feature Inspection Date: August 13,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: 1600015,  Location: 0.15 MI. N OF BROADWAY,  Route carried "on" structure: City street ,  Year Built: 1905,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 23,195 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 28,305 (year 2033),  Features Intersected: PASSAIC RIVER,  Facility Carried by Structure: ARCH STREET
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 54.3m (178.1ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 13,  Critical Feature Inspection Date: August 13,  Deck Structure Type: Closed Grating
Structure Number: 1600016,  Location: 0.2 N OF W.BROADWAY (673),  Route carried "on" structure: City street 509,  Year Built: 1900,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 7.13m (23.39ft),  Average Daily Traffic: 13,112 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 16,203 (year 2033),  Design Load: HS 25,  Features Intersected: PASSAIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.813,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 13,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: 1600017,  Location: 0.4 SE OF UNION AV(CR646),  Route carried "on" structure: County highway 509Z,  Year Built: 1897,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 8.84m (29.00ft),  Average Daily Traffic: 21,287 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 30,549 (year 2033),  Features Intersected: PASSAIC RIVER,  Facility Carried by Structure: W. BROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 2.9m (9.5ft),  Right: 2.9m (9.5ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 13
Structure Number: 1600018,  Location: 0.1 MI. SE OF TOTOWA AVE.,  Route carried "on" structure: County highway 666,  Year Built: 1931,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 9.20m (30.18ft),  Average Daily Traffic: 25,954 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 31,664 (year 2033),  Features Intersected: PASSAIC RIVER,  Facility Carried by Structure: SPRUCE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.20m (30.18ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: July 13,  Underwater Inspection Date: August 13,  Bridge Improvement Cost: $8,456,000,  Roadway Improvement Cost: $1,860,000,  Total Project Cost: $12,280,000 ( Estimate for 2013),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 1600096,  Location: 0.2 E OF MCBRIDE AV-CR639,  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 790 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,065 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: SLIPPERY ROCK BROOK,  Facility Carried by Structure: CALDWELL AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 13,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 1600097,  Location: 0.25 E OF MCBRIDE AV(639),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 2,550 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,430 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: SLIPPERY ROCK BROOK,  Facility Carried by Structure: DIXON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 13,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 1600112,  Location: 0.9 SW OF BROADWAY(CR673),  Route carried "on" structure: County highway 640,  Year Built: 1939,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 16,075 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 19,612 (year 2033),  Features Intersected: MOLLY ANN'S BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.573,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 4.6m (15.1ft),  Right: 3.9m (12.8ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 21.5m (70.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 13,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 1600113,  Location: 1.1 MI NE TOTOWA RD-CR644,  Route carried "on" structure: County highway 646,  Year Built: 1904,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 17,170 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 23,125 (year 2033),  Design Load: HS 25,  Features Intersected: MOLLY ANN'S BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.263,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 13,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: 1600114,  Location: 125FT NW OF UNION AVE/646,  Route carried "on" structure: City street ,  Year Built: 1997,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 3,345 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,505 (year 2033),  Features Intersected: MOLLY ANN'S BROOK,  Facility Carried by Structure: BERKSHIRE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 3.4m (11.2ft),  Right: 3.4m (11.2ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 13,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: 1600115,  Location: 0.2 MI NW OF UNION AV/646,  Route carried "on" structure: City street ,  Year Built: 1997,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 2,800 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,770 (year 2033),  Features Intersected: MOLLY ANN'S BROOK,  Facility Carried by Structure: SHERWOOD AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 3.4m (11.2ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 13,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: 1600116,  Location: 0.3 NW OF UNION AV(CR646),  Route carried "on" structure: County highway 666,  Year Built: 1993,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 8,568 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,248 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: MOLLY ANN'S BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.497,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 74.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 13,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: 1600117,  Location: 0.3 MI NW OF UNION AVENUE,  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 9,885 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,315 (year 2033),  Features Intersected: MOLLY ANN'S BROOK,  Facility Carried by Structure: REDWOOD AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 75.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 13,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: 1600118,  Location: 0.4 NW OF BELMONT AV(675),  Route carried "on" structure: County highway 673,  Year Built: 1988,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 7,800 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,505 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: MOLLY ANN'S BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 13,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: 1600211,  Location: 0.1 MI NE OF PREAKNSS AV,  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 13,250 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 17,850 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: PASSAIC RIVER RACEWAY,  Facility Carried by Structure: ELLISON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 13,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: 160039,  Location: 0.2 N OF GRAND ST(CR 638),  Route carried "on" structure: County highway 639,  Year Built: 1903,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 23,985 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 32,300 (year 2033),  Features Intersected: PASSAIC RIVER RACEWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.051,  Lanes on structure: 3,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 20.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 13
Structure Number: 1600476,  Location: 0.2 MI SW PREAKNES AV/666,  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 8,100 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,900 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: MOLLY ANN'S BROOK,  Facility Carried by Structure: CROSBY AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 13,  Bridge Improvement Cost: $437,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $770,000 ( Estimate for 2013),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Structure Number: 1602153,  Location: 0.55 ML. S. OF JCT. I-80,  Route carried "on" structure: State highway 20,  Year Built: 1997,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 89,022 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 132,282 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: US ROUTE 46 WESTBOUND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.1m (88.9ft),  Skew: 39 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 26.9m (88.3ft),  Out-to-Out Width: 29.0m (95.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 13,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: 161015,  Location: AT I-80 EXIT 60,  Route carried "on" structure: State highway 20,  Year Built: 1963,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 84,685 (year 2012),  Truck Traffic: 4%,  Average Future Daily Traffic: 101,622 (year 2032),  Design Load: HS 20,  Features Intersected: RAMP 'K'
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.917,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 26.5m (86.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 14,  Roadway Improvement Cost: $300,000,  Total Project Cost: $3,000,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 1610151,  Location: 0.1 MI NORTH OF RT 80 INT,  Route carried "on" structure: Ramp Interstate 80,  Year Built: 1963,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 20,094 (year 2012),  Truck Traffic: 9%,  Average Future Daily Traffic: 24,113 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: RT 20 & RAMP A,  Facility Carried by Structure: RAMP B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 97.220,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 5.90m (19.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 14,  Bridge Improvement Cost: $70,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $253,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 1610152,  Location: 2.3 MI EAST OF RTE 20 FWY,  Route carried "on" structure: Interstate 80,  Year Built: 1964,  Status: Open,  Structure Length: 22.28m (73.10ft),  Average Daily Traffic: 106,200 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 127,450 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: NJ 20,PASS.RIV.&SLG.RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 97.269,  Lanes on structure: 9,  Lanes under structure: 12,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 35.4m (116.1ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 6,  Length of Maximum Span: 37.8m (124.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 40.5m (132.9ft),  Out-to-Out Width: 43.3m (142.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: October 13,  Underwater Inspection Date: November 11,  Roadway Improvement Cost: $100,000,  Total Project Cost: $100,000 ( Estimate for 2013),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Membrane: Preformed Fabric
Structure Number: 1610156,  Location: @ CR 633 & I-80 JCN,  Route carried "on" structure: County highway 633,  Year Built: 1970,  Status: Open,  Structure Length: 7.13m (23.39ft),  Average Daily Traffic: 5,080 (year 2014),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,096 (year 2034),  Design Load: HS 20,  Features Intersected: ROUTE I-80
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.005,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.1m (115.2ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.10m (23.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 14,  Bridge Improvement Cost: $679,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $1,075,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 1610157,  Location: 0.2M WEST OF NJ ROUTE 19,  Route carried "on" structure: Interstate 80,  Year Built: 1971,  Status: Open,  Structure Length: 17.89m (58.69ft),  Average Daily Traffic: 68,850 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 84,660 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: SLOPE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.503,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.0m,  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 13,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 1610158,  Location: At EXIT 57,  Route carried "on" structure: Interstate 80,  Year Built: 1971,  Status: Open,  Structure Length: 12.22m (40.09ft),  Average Daily Traffic: 170,348 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 253,128 (year 2033),  Design Load: HS 20,  Features Intersected: NJ 19 and Ramp NJ 19 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.696,  Lanes on structure: 9,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 42.7m (140.1ft),  Skew: 35 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.0m (118.1ft),  Curb-To-Curb Width: 42.8m (140.4ft),  Out-to-Out Width: 44.3m (145.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 13,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 1610159,  Location: 0.4 MI E OF I-80 EXIT 57,  Route carried "on" structure: Interstate 80,  Year Built: 1965,  Status: Open,  Structure Length: 44.93m (147.41ft),  Average Daily Traffic: 160,560 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 195,900 (year 2033),  Design Load: HS 20,  Features Intersected: NJ TRANSIT&LOCAL STREETS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 94.227,  Lanes on structure: 8,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.4m (112.9ft),  Skew: 34 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 7,  Length of Maximum Span: 46.0m (150.9ft),  Curb-To-Curb Width: 34.4m (112.9ft),  Out-to-Out Width: 36.6m (120.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 13,  Critical Feature Inspection Date: October 13,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 161016,  Location: 0.65 MI EAST OF RT NJ 20,  Route carried "on" structure: Interstate 80,  Year Built: 1965,  Status: Open,  Structure Length: 8.84m (29.00ft),  Average Daily Traffic: 117,492 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 143,362 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: RMP F,BECKWTH,SVC & UTRN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 94.742,  Lanes on structure: 8,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 43.6m (143.0ft),  Skew: 36 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 41.1m (134.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 42.7m (140.1ft),  Out-to-Out Width: 45.1m (148.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: May 13,  Critical Feature Inspection Date: May 13,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 1610161,  Location: 1.5 MI WEST OF PAS RIV,  Route carried "on" structure: Ramp Interstate 80,  Year Built: 1965,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 8,823 (year 2012),  Truck Traffic: 9%,  Average Future Daily Traffic: 9,000 (year 2032),  Design Load: HS 20,  Features Intersected: FRONTAGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 94.710,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 14,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 1610162,  Location: 1.6 MI W OF PASSAIC RIVER,  Route carried "on" structure: Ramp Interstate 80,  Year Built: 1964,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 6,365 (year 2012),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,638 (year 2032),  Design Load: HS 20,  Features Intersected: FRONTAGE ROAD,  Facility Carried by Structure: RAMPS E & F
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 94.871,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 14,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 1610163,  Location: 1.4 MI WEST OF PAS RIV,  Route carried "on" structure: County highway 649,  Year Built: 1964,  Status: Open,  Structure Length: 10.12m (33.20ft),  Average Daily Traffic: 1,965 (year 2012),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,358 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I80,FRONTAGE ROADS 1,2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.740,  Lanes on structure: 4,  Lanes under structure: 11,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 33 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 14,  Roadway Improvement Cost: $98,000,  Total Project Cost: $123,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 1610164,  Location: 0.1 MI S OF I-80 EXIT 58,  Route carried "on" structure: Ramp Interstate 80,  Year Built: 1964,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 2,672 (year 2012),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,206 (year 2032),  Design Load: HS 20,  Features Intersected: LOWER MADISON AVENUE,  Facility Carried by Structure: RAMP N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 95.096,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 14,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 1610166,  Location: 1.5 MI EAST OF RT 20 JCT,  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Open,  Structure Length: 5.30m (17.39ft),  Average Daily Traffic: 10,555 (year 2012),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,666 (year 2032),  Design Load: HS 20,  Features Intersected: ROUTE I-80,  Facility Carried by Structure: TRENTON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.062,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 14,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 1610167,  Location: 0.4 MI WEST OF PAS RIV,  Route carried "on" structure: County highway 624,  Year Built: 1963,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 22,877 (year 2012),  Truck Traffic: 4%,  Average Future Daily Traffic: 27,452 (year 2032),  Design Load: HS 20,  Features Intersected: ROUTE I-80,  Facility Carried by Structure: LAKEVIEW AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.474,  Lanes on structure: 6,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 14,  Bridge Improvement Cost: $769,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,067,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 1610168,  Location: 1.6 MI WEST OF GSP JCT,  Route carried "on" structure: Ramp Interstate 80,  Year Built: 1963,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 7,446 (year 2012),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,935 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: RAMP "J",  Facility Carried by Structure: RAMP K
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 96.850,  Lanes on structure: 2,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.0m (95.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 14,  Bridge Improvement Cost: $67,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $110,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 1610169,  Location: 0.3 MI WEST OF PAS RIV,  Route carried "on" structure: Ramp Interstate 80,  Year Built: 1963,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 5,916 (year 2012),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,099 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: RAMPS 'F' & 'H',  Facility Carried by Structure: RAMP"G"
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 96.770,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.4m (116.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 14,  Bridge Improvement Cost: $413,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $654,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 161017,  Location: 0.2 MI WEST OF PAS RIV,  Route carried "on" structure: Interstate 80,  Year Built: 1963,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 146,390 (year 2014),  Truck Traffic: 9%,  Average Future Daily Traffic: 174,930 (year 2034),  Design Load: HS 20+Mod,  Features Intersected: I-80 RAMP E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 96.995,  Lanes on structure: 7,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.0m (118.1ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.0m,  Curb-To-Curb Width: 36.0m (118.1ft),  Out-to-Out Width: 38.9m (127.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 14,  Roadway Improvement Cost: $650,000,  Total Project Cost: $780,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 1610171,  Location: 0.1 Mile East of Exit 57,  Route carried "on" structure: Interstate 80,  Year Built: 1971,  Status: Open,  Structure Length: 6.04m (19.82ft),  Average Daily Traffic: 123,157 (year 2014),  Truck Traffic: 9%,  Average Future Daily Traffic: 145,288 (year 2034),  Design Load: HS 20+Mod,  Features Intersected: MAIN & MARSHALL STREETS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.937,  Lanes on structure: 9,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 39.3m (128.9ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 39.3m (128.9ft),  Out-to-Out Width: 41.9m (137.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 14,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 1610172,  Location: 0.1 MI SOUTH OF RTE I-80,  Route carried "on" structure: Ramp Interstate 80,  Year Built: 1971,  Status: Open,  Structure Length: 6.00m (19.69ft),  Average Daily Traffic: 5,850 (year 2014),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,900 (year 2034),  Design Load: HS 20+Mod,  Features Intersected: MAIN & MARSHALL STREETS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.921,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 39 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.8m (101.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 14,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 1610173,  Location: AT I-80 EXIT 57,  Route carried "on" structure: Ramp Interstate 80,  Year Built: 1971,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 4,223 (year 2012),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,068 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: MAIN STREET(CO.RTE.601)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.937,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.3m (96.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 14,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 1610174,  Location: I 80 EXIT 57,  Route carried "on" structure: Ramp Interstate 80,  Year Built: 1992,  Status: Open,  Structure Length: 24.08m (79.00ft),  Average Daily Traffic: 1,292 (year 2014),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,768 (year 2034),  Design Load: HS 20,  Features Intersected: I 80 RAMP FM & GRAND ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.696,  Lanes on structure: 1,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 5,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 14,  Critical Feature Inspection Date: July 14,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: 1610175,  Location: .4 MI WEST OF CO. RT. 601,  Route carried "on" structure: Ramp Interstate 80,  Year Built: 1992,  Status: Open,  Structure Length: 33.99m (111.52ft),  Average Daily Traffic: 1,320 (year 2014),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,611 (year 2034),  Design Load: HS 20+Mod,  Features Intersected: RT.19& RAMPS C,D,DE &FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.696,  Lanes on structure: 1,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 11,  Number Of Approach Spans: 3,  Length of Maximum Span: 36.0m (118.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 14,  Critical Feature Inspection Date: July 12,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing