Bridge Statistics for Patterson, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Patterson, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 21 Total length: 44 meters (144ft) Total costs: $17,293,000 Total average daily traffic: 290,948 Total average daily truck traffic: 44,047 National Bridge Inventory (NBI) Registered Bridges for Patterson
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 101668, Location: 0.4 MI N JCT RTS 22+164 (Lat: 41.477997, Lng: -73.578853), Route carried "on" structure: State highway 22, Year Built: 1932, Year Reconstructed: 1998, Status: Open, Structure Length: 2.49m (8.17ft), Average Daily Traffic: 7,601 (year 2000), Truck Traffic: 6%, Average Future Daily Traffic: 10,641 (year 2020), Design Load: HS 25, Features Intersected: CROTON RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 20.035, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 22.8m (74.8ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 12.8m (42.0ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Channel: Satisfactory, Operating Rating: 65.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.49m (8.17ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $1,574,000, Roadway Improvement Cost: $937,000, Total Project Cost: $2,511,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 10456, Location: 0.4 MI W JCT RTS 311+22 (Lat: 41.514142, Lng: -73.599308), Route carried "on" structure: State highway 311, Year Built: 1958, Status: Open, Structure Length: 2.16m (7.09ft), Average Daily Traffic: 8,323 (year 2002), Truck Traffic: 8%, Average Future Daily Traffic: 10,850 (year 2022), Design Load: HS 20, Features Intersected: E BR CROTON RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 170.168, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 10.6m (34.8ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 20.1m (65.9ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 12.0m (39.4ft), Out-to-Out Width: 13.5m (44.3ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Channel: Good, Operating Rating: 68.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.16m (7.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $629,000, Roadway Improvement Cost: $374,000, Total Project Cost: $1,003,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 104561, Location: 2.4 MI W JCT RTS 312+22 (Lat: 41.433150, Lng: -73.614958), Route carried "on" structure: State highway 312, Year Built: 1977, Status: Open, Structure Length: 1.34m (4.40ft), Average Daily Traffic: 10,534 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 14,748 (year 2026), Features Intersected: MNRR BE LINE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.437, Lanes on structure: 2, Base Highway Network: Yes, Owner: Railroad, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 8.8m (28.9ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 13.4m (44.0ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 8.9m (29.2ft), Out-to-Out Width: 9.9m (32.5ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 96.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 64.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.34m (4.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $629,000, Roadway Improvement Cost: $374,000, Total Project Cost: $1,003,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1052771, Location: I84 INT 18 (Lat: 41.473989, Lng: -73.649000), Route carried "on" structure: Interstate 84, Year Built: 1968, Status: Open, Structure Length: 3.62m (11.88ft), Average Daily Traffic: 36,625 (year 1999), Truck Traffic: 18%, Average Future Daily Traffic: 51,275 (year 2019), Design Load: HS 20, Features Intersected: RTE 311 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.405, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Maintenance Responsibility: State Toll Authority, Approaching Roadway Width: 12.1m (39.7ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 35.0m (114.8ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 11.8m (38.7ft), Out-to-Out Width: 12.7m (41.7ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 79.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.62m (11.88ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $1,087,000, Roadway Improvement Cost: $647,000, Total Project Cost: $1,734,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1052772, Location: I84 INT 18 (Lat: 41.473989, Lng: -73.649000), Route carried "on" structure: Interstate 84, Year Built: 1968, Year Reconstructed: 1980, Status: Open, Structure Length: 3.62m (11.88ft), Average Daily Traffic: 36,625 (year 1999), Truck Traffic: 18%, Average Future Daily Traffic: 51,275 (year 2019), Design Load: HS 20, Features Intersected: RTE 311 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.405, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Maintenance Responsibility: State Toll Authority, Approaching Roadway Width: 12.1m (39.7ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 35.0m (114.8ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 11.8m (38.7ft), Out-to-Out Width: 12.7m (41.7ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 79.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.62m (11.88ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $1,087,000, Roadway Improvement Cost: $647,000, Total Project Cost: $1,734,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1052781, Location: .6 MI SE I84 EXIT 18 (Lat: 41.465228, Lng: -73.644608), Route carried "on" structure: Interstate 84, Year Built: 1968, Status: Open, Structure Length: 3.07m (10.07ft), Average Daily Traffic: 36,625 (year 1999), Truck Traffic: 18%, Average Future Daily Traffic: 51,275 (year 2019), Design Load: HS 20, Features Intersected: FAIR STREET-CR 60 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.389, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Maintenance Responsibility: State Toll Authority, Approaching Roadway Width: 11.5m (37.7ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 28.9m (94.8ft), Curb-To-Curb Width: 11.8m (38.7ft), Out-to-Out Width: 12.9m (42.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 87.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.07m (10.07ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $1,087,000, Roadway Improvement Cost: $647,000, Total Project Cost: $1,734,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1052782, Location: .6 MI SE I84 EXIT 18 (Lat: 41.465228, Lng: -73.644608), Route carried "on" structure: Interstate 84, Year Built: 1968, Status: Open, Structure Length: 2.98m (9.78ft), Average Daily Traffic: 36,625 (year 1999), Truck Traffic: 18%, Average Future Daily Traffic: 51,275 (year 2019), Design Load: HS 20, Features Intersected: FAIR STREET-CR 60 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.422, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Maintenance Responsibility: State Toll Authority, Approaching Roadway Width: 12.1m (39.7ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 28.0m (91.9ft), Curb-To-Curb Width: 11.8m (38.7ft), Out-to-Out Width: 12.9m (42.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 88.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 52.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.98m (9.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $1,087,000, Roadway Improvement Cost: $647,000, Total Project Cost: $1,734,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1052791, Location: 1.7 MI E I84 INT 18 (Lat: 41.451411, Lng: -73.638586), Route carried "on" structure: Interstate 84, Year Built: 1968, Status: Open, Structure Length: 2.74m (8.99ft), Average Daily Traffic: 36,625 (year 1999), Truck Traffic: 18%, Average Future Daily Traffic: 51,275 (year 2019), Design Load: HS 20, Features Intersected: BULLET HOLE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 8.064, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Maintenance Responsibility: State Toll Authority, Approaching Roadway Width: 12.1m (39.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 25.6m (84.0ft), Curb-To-Curb Width: 11.8m (38.7ft), Out-to-Out Width: 12.9m (42.3ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 87.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.74m (8.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $1,087,000, Roadway Improvement Cost: $647,000, Total Project Cost: $1,734,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1052792, Location: 1.7 MI E I84 INT 18 (Lat: 41.451411, Lng: -73.638586), Route carried "on" structure: Interstate 84, Year Built: 1968, Status: Open, Structure Length: 2.59m (8.50ft), Average Daily Traffic: 36,625 (year 1999), Truck Traffic: 18%, Average Future Daily Traffic: 51,275 (year 2019), Design Load: HS 20, Features Intersected: BULLET HOLE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 8.064, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Maintenance Responsibility: State Toll Authority, Approaching Roadway Width: 12.1m (39.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 24.3m (79.7ft), Curb-To-Curb Width: 11.8m (38.7ft), Out-to-Out Width: 12.9m (42.3ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Operating Rating: 86.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.59m (8.50ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $1,087,000, Roadway Improvement Cost: $647,000, Total Project Cost: $1,734,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 222387, Location: 1.2 MILES SE OF HOLMES (Lat: 41.509031, Lng: -73.633269), Route carried "on" structure: City street , Year Built: 1988, Status: Open, Structure Length: 1.92m (6.30ft), Average Daily Traffic: 250 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 350 , Features Intersected: MNRR BE LINE, Facility Carried by Structure: MOONEY HILL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Railroad, Maintenance Responsibility: Town or Township Highway Agency, Approaching Roadway Width: 5.7m (18.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 18.2m (59.7ft), Curb-To-Curb Width: 6.0m (19.7ft), Out-to-Out Width: 6.8m (22.3ft) Condition: Deck: Excellent, Superstructure: Very good, Substructure: Fair, Operating Rating: 84.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.92m (6.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Bridge Improvement Cost: $291,000, Roadway Improvement Cost: $173,000, Total Project Cost: $464,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Other Coated Reinforcing Find on map >>
Structure Number: 334546, Location: 2 MI NE OF CR 65 ON CR 68 (Lat: 41.498664, Lng: -73.533653), Route carried "on" structure: County highway , Year Built: 1993, Status: Open, Structure Length: 1.55m (5.09ft), Average Daily Traffic: 1,200 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 1,680 , Design Load: HS 20, Features Intersected: QUAKER BROOK, Facility Carried by Structure: HAVLND HOLLOW RD Minimum Vertical Clearance: 0.00m, Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 15.5m (50.9ft), Curb-To-Curb Width: 9.0m (29.5ft), Out-to-Out Width: 9.6m (31.5ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Satisfactory, Operating Rating: 88.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.55m (5.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2006, Bridge Improvement Cost: $668,000, Roadway Improvement Cost: $397,000, Total Project Cost: $1,065,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 334547, Location: 3.3 MILES SE OF PATTERSON (Lat: 41.494236, Lng: -73.546919), Route carried "on" structure: City street , Year Built: 1938, Status: Open, Structure Length: 1.03m (3.38ft), Average Daily Traffic: 400 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 560 , Features Intersected: HAVILAND HLLW BRK, Facility Carried by Structure: BRIMSTONE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 5.7m (18.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.7m (31.8ft), Curb-To-Curb Width: 5.8m (19.0ft), Out-to-Out Width: 6.4m (21.0ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Poor, Channel: Satisfactory, Operating Rating: 76.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 1.03m (3.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $146,000, Roadway Improvement Cost: $87,000, Total Project Cost: $233,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 334548, Location: 1.3 MI NW OF PATTERSON (Lat: 41.494253, Lng: -73.607200), Route carried "on" structure: County highway , Year Built: 1990, Status: Open, Structure Length: 1.58m (5.18ft), Average Daily Traffic: 500 (year 1978), Truck Traffic: 8%, Average Future Daily Traffic: 700 (year 1998), Design Load: HS 20, Features Intersected: MUDDY BROOK, Facility Carried by Structure: CORNWALL HILL RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.3m (46.9ft), Curb-To-Curb Width: 7.5m (24.6ft), Out-to-Out Width: 8.8m (28.9ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Channel: Good, Operating Rating: 68.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.58m (5.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $146,000, Roadway Improvement Cost: $87,000, Total Project Cost: $233,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 334549, Location: .3 MILE SE OF PATTERSON (Lat: 41.484083, Lng: -73.570550), Route carried "on" structure: County highway , Year Built: 1988, Status: Open, Structure Length: 1.37m (4.49ft), Average Daily Traffic: 1,450 (year 1983), Truck Traffic: 8%, Average Future Daily Traffic: 1,890 (year 2003), Design Load: HS 20, Features Intersected: HAVILAND HLLW BRK, Facility Carried by Structure: EAST BRANCH ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.1m (39.7ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.5m (31.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 78.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.37m (4.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2006, Bridge Improvement Cost: $146,000, Roadway Improvement Cost: $87,000, Total Project Cost: $233,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 336512, Location: 1.3 MI NE OF LAKE CARMEL (Lat: 41.475033, Lng: -73.652717), Route carried "on" structure: County highway , Year Built: 1925, Status: Open, Structure Length: 1.00m (3.28ft), Average Daily Traffic: 473 (year 1997), Truck Traffic: 8%, Average Future Daily Traffic: 629 (year 2017), Features Intersected: DREW LAKE OUTLET, Facility Carried by Structure: LUDINGTON CT Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.4m (30.8ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.0m (23.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Satisfactory, Operating Rating: 79.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.00m (3.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $91,000, Roadway Improvement Cost: $53,000, Total Project Cost: $144,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber Find on map >>
Structure Number: 1052771, Location: I84 INT 18 (Lat: 41.473989, Lng: -73.649000), Route carried "under" structure: State highway 311, Year Built: 1968, Structure Length: 3.62m (11.88ft), Average Daily Traffic: 11,498 (year 2005), Truck Traffic: 6%, Features Intersected: RTE 311, Facility Carried by Structure: RTE I84 Minimum Vertical Clearance: 4.82m (15.81ft), Kilometerpoint: 1.689, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.0m (114.8ft) Find on map >>
Structure Number: 1052772, Location: I84 INT 18 (Lat: 41.473989, Lng: -73.649000), Route carried "under" structure: State highway 311, Year Built: 1968, Structure Length: 3.62m (11.88ft), Average Daily Traffic: 11,498 (year 2005), Truck Traffic: 6%, Features Intersected: RTE 311, Facility Carried by Structure: RTE I84 Minimum Vertical Clearance: 4.77m (15.65ft), Kilometerpoint: 1.689, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.0m (114.8ft) Find on map >>
Structure Number: 704136, Location: 0.34 MI N JCT 164&311 (Lat: 41.489128, Lng: -73.624608), Route carried "under" structure: State highway 311, Year Built: 1907, Structure Length: 1.03m (3.38ft), Average Daily Traffic: 8,012 (year 2005), Truck Traffic: 6%, Features Intersected: RTE 311, Facility Carried by Structure: MNRR BE LINE Minimum Vertical Clearance: 3.65m (11.98ft), Kilometerpoint: 4.795, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 8.5m (27.9ft) Find on map >>
Structure Number: 704137, Location: 0.25 MI E JCT 311&164 (Lat: 41.484164, Lng: -73.622150), Route carried "under" structure: State highway 164, Year Built: 1915, Structure Length: 1.00m (3.28ft), Average Daily Traffic: 3,153 (year 2006), Truck Traffic: 6%, Features Intersected: RTE 164, Facility Carried by Structure: MNRR BE LINE Minimum Vertical Clearance: 3.96m (12.99ft), Kilometerpoint: 0.386, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 7.3m (24.0ft) Find on map >>
Structure Number: 704138, Location: 0.50 MI E JCT 311&164 (Lat: 41.481725, Lng: -73.617925), Route carried "under" structure: State highway 164, Year Built: 1915, Structure Length: 1.18m (3.87ft), Average Daily Traffic: 3,153 (year 2006), Truck Traffic: 6%, Features Intersected: RTE 164, Facility Carried by Structure: MNRR BE LINE Minimum Vertical Clearance: 3.99m (13.09ft), Kilometerpoint: 0.869, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 9.4m (30.8ft) Find on map >>
Structure Number: 704139, Location: 0.80 MI E JCT 311&164 (Lat: 41.479567, Lng: -73.611419), Route carried "under" structure: State highway 164, Year Built: 1915, Structure Length: 1.06m (3.48ft), Average Daily Traffic: 3,153 (year 2006), Truck Traffic: 6%, Features Intersected: RTE 164, Facility Carried by Structure: MNRR HA LINE Minimum Vertical Clearance: 3.99m (13.09ft), Kilometerpoint: 0.148, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 7.9m (25.9ft) Discuss this city on our hugely popular New York forum Back to: Patterson, NY, New York, All US cities.
|
![]() |