Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Pauls Valley, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 64Number of bridges
  • 853ft / 260mTotal length
  • $65,025,000Total costs
  • 423,675Total average daily traffic
  • 116,380Total average daily truck traffic
  • 523,570Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pauls Valley
  • No street view available for this location

New bridges in Pauls Valley, OK - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 51930-1939
  • 41940-1949
  • 31950-1959
  • 161960-1969
  • 121970-1979
  • 61980-1989
  • 61990-1999
  • 62000-2009
  • 42010-2018
Reconstructed bridges in Pauls Valley, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 11950-1959
  • 21960-1969
  • 11970-1979
  • 01980-1989
  • 01990-1999
  • 02000-2009
  • 12010-2018
Average Bridge Daily Traffic in Pauls Valley, OK
Average Bridge Truck Traffic in Pauls Valley, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.7%Excellent
  • 17.9%Very good
  • 33.3%Good
  • 15.4%Satisfactory
  • 23.1%Fair
  • 2.6%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.4%Excellent
  • 17.9%Very good
  • 25.6%Good
  • 30.8%Satisfactory
  • 5.1%Fair
  • 5.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 30.8%Very good
  • 35.9%Good
  • 15.4%Satisfactory
  • 15.4%Fair
  • 2.6%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.7%Excellent
  • 13.3%Very good
  • 28.9%Good
  • 44.4%Satisfactory
  • 6.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 26.7%Good
  • 26.7%Satisfactory
  • 6.7%Fair
  • 6.7%Poor
Find on map >>   Show street view

Structure Number: 8,  Location: 3.6W 2S OF PAULS VALLEY (Lat: 34.724614,  Lng: -97.282789),  Route carried "on" structure: County highway E1580,  Year Built: 1990,  Status: Open,  Structure Length: 2.82m (9.25ft),  Average Daily Traffic: 100 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2036),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 61.0m (200.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 58.90m (193.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2016,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $165,000,  Total Project Cost: $480,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1482,  Location: 6.2 MI N MURRAY C/L (Lat: 34.687911,  Lng: -97.212822),  Route carried "on" structure: US 77,  Year Built: 1925,  Year Reconstructed: 1962,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 3,000 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,800 (year 2036),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.783,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 122.0m (400.3ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 40.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.50m (27.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2016,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 388,  Location: 9.7 MI E JCT SH 74 (Lat: 34.739272,  Lng: -97.269778),  Route carried "on" structure: State highway 19,  Year Built: 1933,  Year Reconstructed: 1973,  Status: Open,  Structure Length: 0.07m (0.23ft),  Average Daily Traffic: 4,400 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 7,040 (year 2036),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.495,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 116.0m (380.6ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 0.3m (1.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.07m (0.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2017,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 4006,  Location: 6.6 MI E JCT SH 74 (Lat: 34.770056,  Lng: -97.307492),  Route carried "on" structure: State highway 19,  Year Built: 1933,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 2,800 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,480 (year 2036),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.459,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 73.0m (239.5ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.80m (78.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2017,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 4658,  Location: .4 S 1.5 W PAULS VALLEY (Lat: 34.730392,  Lng: -97.247647),  Route carried "on" structure: County highway N3230,  Year Built: 1936,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 200 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 320 (year 2036),  Design Load: H 10,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 67.0m (219.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 27.90m (91.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2016,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 6282,  Location: 1.4 MI E JCT US 77 (Lat: 34.753842,  Lng: -97.205286),  Route carried "on" structure: State highway 19,  Year Built: 1938,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 3,700 (year 2016),  Truck Traffic: 16%,  Average Future Daily Traffic: 5,920 (year 2036),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.317,  Lanes on structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 73.0m (239.5ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.10m (33.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2016,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 6797,  Location: 3.6 N .6 E WYNNEWOOD (Lat: 34.695153,  Lng: -97.160167),  Route carried "on" structure: County highway E1600,  Year Built: 1939,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 100 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2036),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 61.0m (200.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 0.3m (1.0ft),  Curb-To-Curb Width: 1.1m (3.6ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 27.90m (91.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2016,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 8393,  Location: 4.5 MI S PAULS VALLEY (Lat: 34.672514,  Lng: -97.212764),  Route carried "on" structure: County highway N3250,  Year Built: 1940,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 100 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2036),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 55.0m (180.4ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 2.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 32.20m (105.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2016,  Bridge Improvement Cost: $165,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $261,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 857,  Location: .4 W .5 N OF WHITEBEAD (Lat: 34.768144,  Lng: -97.304878),  Route carried "on" structure: County highway E1550,  Year Built: 1940,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 100 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2036),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.965,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 61.0m (200.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 34.70m (113.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2016,  Bridge Improvement Cost: $177,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $281,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8933,  Location: 1.5 W .5 N OF WHITEBEAD (Lat: 34.768167,  Lng: -97.326403),  Route carried "on" structure: County highway E1550,  Year Built: 1940,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 100 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2036),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 79.0m (259.2ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Poor,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 39.80m (130.58ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2017,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 1051,  Location: 3.8 MI E SH10 (Lat: 36.597942,  Lng: -94.645825),  Route carried "on" structure: State highway 25,  Year Built: 1946,  Year Reconstructed: 1953,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 3,000 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,800 (year 2036),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.018,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 73.0m (239.5ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 43.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.50m (41.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2016,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 12597,  Location: WEST EDGE PAULSVALLEY (Lat: 34.735517,  Lng: -97.230461),  Route carried "on" structure: State highway 19,  Year Built: 1951,  Year Reconstructed: 1973,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 11,100 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 17,760 (year 2036),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.195,  Lanes on structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 207.0m (679.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 32.6m (107.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.20m (53.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2017,  Bridge Improvement Cost: $377,000,  Roadway Improvement Cost: $623,000,  Total Project Cost: $1,057,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 1312,  Location: S EDGE PAULS VALLEY (Lat: 34.735081,  Lng: -97.214306),  Route carried "on" structure: US 77,  Year Built: 1953,  Status: Open,  Structure Length: 16.31m (53.51ft),  Average Daily Traffic: 6,500 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 10,400 (year 2036),  Design Load: H 20,  Features Intersected: RUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.851,  Lanes on structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 76.0m (249.3ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 3,  Length of Maximum Span: 41.5m (136.2ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 163.10m (535.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2016,  Bridge Improvement Cost: $3,975,000,  Roadway Improvement Cost: $4,500,000,  Total Project Cost: $8,955,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 14473,  Location: .3 S 1.5 W PAULS VALLEY (Lat: 34.731711,  Lng: -97.247750),  Route carried "on" structure: County highway N3230,  Year Built: 1959,  Status: Open,  Structure Length: 6.37m (20.90ft),  Average Daily Traffic: 100 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2036),  Design Load: H 20,  Features Intersected: RUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 67.0m (219.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 92.30m (302.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2016,  Bridge Improvement Cost: $471,000,  Roadway Improvement Cost: $259,000,  Total Project Cost: $735,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14685,  Location: 3.2 MI W PAULSVALLEY (Lat: 34.739200,  Lng: -97.278303),  Route carried "on" structure: County highway 2524C,  Year Built: 1960,  Status: Posted for load,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 100 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2036),  Design Load: H 15,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.987,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 67.0m (219.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 0.3m (1.0ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 28.60m (93.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2016,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 16814,  Location: 5.3 MI S PAOLI (Lat: 34.754483,  Lng: -97.251258),  Route carried "on" structure: US 77,  Year Built: 1966,  Status: Open,  Structure Length: 16.83m (55.22ft),  Average Daily Traffic: 2,100 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,360 (year 2036),  Design Load: H 20,  Features Intersected: WASHITA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.936,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 134.0m (439.6ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 168.20m (551.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2016,  Bridge Improvement Cost: $1,252,000,  Roadway Improvement Cost: $2,065,000,  Total Project Cost: $3,504,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17198,  Location: 2.1 MI N JCT SH 29 (Lat: 34.681108,  Lng: -97.228225),  Route carried "on" structure: Interstate 35,  Year Built: 1968,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 16,050 (year 2016),  Truck Traffic: 36%,  Average Future Daily Traffic: 25,680 (year 2036),  Design Load: HS 20,  Features Intersected: E-W 161 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.048,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 3),  Owner: State Highway Agency,  Approaching Roadway Width: 116.0m (380.6ft),  Skew: 11 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 39.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 58.60m (192.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2017,  Bridge Improvement Cost: $505,000,  Roadway Improvement Cost: $833,000,  Total Project Cost: $1,414,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17198,  Location: 2.1 MI N JCT SH 29 (Lat: 34.681108,  Lng: -97.228225),  Route carried "under" structure: County highway 2574C,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 250 (year 2016),  Truck Traffic: 10%,  Features Intersected: E-W 161 UNDER,  Facility Carried by Structure: I-35
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 20.048,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 12.8m (42.0ft)

Find on map >>   Show street view

Structure Number: 17199,  Location: 2.1 MI N JCT SH 29 (Lat: 34.681108,  Lng: -97.227631),  Route carried "on" structure: Interstate 35,  Year Built: 1968,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 16,600 (year 2016),  Truck Traffic: 36%,  Average Future Daily Traffic: 26,560 (year 2036),  Design Load: HS 20,  Features Intersected: E-W 161 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.048,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 3),  Owner: State Highway Agency,  Approaching Roadway Width: 116.0m (380.6ft),  Skew: 11 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 39.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 58.60m (192.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2017,  Bridge Improvement Cost: $505,000,  Roadway Improvement Cost: $833,000,  Total Project Cost: $1,414,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17199,  Location: 2.1 MI N JCT SH 29 (Lat: 34.681108,  Lng: -97.227631),  Route carried "under" structure: County highway 2574C,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 250 (year 2016),  Truck Traffic: 10%,  Features Intersected: E-W 161 UNDER,  Facility Carried by Structure: I-35
Minimum Vertical Clearance: 0.43m (1.41ft),  Kilometerpoint: 20.048,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 12.8m (42.0ft)

Find on map >>   Show street view

Structure Number: 17218,  Location: JCT I-35 AND SH 29 (Lat: 34.651533,  Lng: -97.220633),  Route carried "on" structure: Interstate 35,  Year Built: 1968,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 15,300 (year 2016),  Truck Traffic: 36%,  Average Future Daily Traffic: 24,480 (year 2036),  Design Load: HS 20,  Features Intersected: S.H. 29 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.718,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 116.0m (380.6ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 41.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 56.10m (184.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2017,  Bridge Improvement Cost: $487,000,  Roadway Improvement Cost: $803,000,  Total Project Cost: $1,363,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17218,  Location: JCT I-35 AND SH 29 (Lat: 34.651533,  Lng: -97.220633),  Route carried "under" structure: State highway 29,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2016),  Truck Traffic: 16%,  Features Intersected: S.H. 29 UNDER,  Facility Carried by Structure: I-35
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 33.001,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: 17219,  Location: JCT I-35 AND SH 29 (Lat: 34.651533,  Lng: -97.220075),  Route carried "on" structure: Interstate 35,  Year Built: 1968,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 15,650 (year 2016),  Truck Traffic: 36%,  Average Future Daily Traffic: 25,040 (year 2036),  Design Load: HS 20,  Features Intersected: S.H. 29 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.718,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 116.0m (380.6ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 41.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 56.10m (184.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2017,  Bridge Improvement Cost: $487,000,  Roadway Improvement Cost: $803,000,  Total Project Cost: $1,363,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17219,  Location: JCT I-35 AND SH 29 (Lat: 34.651533,  Lng: -97.220075),  Route carried "under" structure: State highway 29,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2016),  Truck Traffic: 16%,  Features Intersected: S.H. 29 UNDER,  Facility Carried by Structure: I-35
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 33.033,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: 17226,  Location: 1 MI N JCT SH 29 (Lat: 34.665592,  Lng: -97.222728),  Route carried "on" structure: Interstate 35,  Year Built: 1968,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 16,600 (year 2016),  Truck Traffic: 36%,  Average Future Daily Traffic: 26,560 (year 2036),  Design Load: HS 20,  Features Intersected: RED BRANCH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.294,  Lanes on structure: 2,  Base Highway Network: Yes (,  Subroute: 3),  Owner: State Highway Agency,  Approaching Roadway Width: 116.0m (380.6ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 68.90m (226.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2016,  Bridge Improvement Cost: $581,000,  Roadway Improvement Cost: $959,000,  Total Project Cost: $1,627,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17227,  Location: 1 MI N JCT SH 29 (Lat: 34.665597,  Lng: -97.223303),  Route carried "on" structure: Interstate 35,  Year Built: 1968,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 16,050 (year 2016),  Truck Traffic: 36%,  Average Future Daily Traffic: 25,680 (year 2036),  Design Load: HS 20,  Features Intersected: RED BRANCH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.294,  Lanes on structure: 2,  Base Highway Network: Yes (,  Subroute: 3),  Owner: State Highway Agency,  Approaching Roadway Width: 116.0m (380.6ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 63.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 68.90m (226.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2016,  Bridge Improvement Cost: $581,000,  Roadway Improvement Cost: $959,000,  Total Project Cost: $1,627,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17456,  Location: 0.4 MI S JCT SH 29 (Lat: 34.645531,  Lng: -97.219511),  Route carried "on" structure: Interstate 35,  Year Built: 1969,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 36,000 (year 2016),  Truck Traffic: 36%,  Average Future Daily Traffic: 50,400 (year 2036),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.042,  Lanes on structure: 2,  Base Highway Network: Yes (,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 116.0m (380.6ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 62.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 62.60m (205.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2017,  Bridge Improvement Cost: $535,000,  Roadway Improvement Cost: $883,000,  Total Project Cost: $1,499,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17457,  Location: 0.4 MI S JCT SH 29 (Lat: 34.645478,  Lng: -97.220067),  Route carried "on" structure: Interstate 35,  Year Built: 1969,  Status: Open,  Structure Length: 3.09m (10.14ft),  Average Daily Traffic: 15,300 (year 2016),  Truck Traffic: 36%,  Average Future Daily Traffic: 24,480 (year 2036),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.042,  Lanes on structure: 2,  Base Highway Network: Yes (,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 116.0m (380.6ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 62.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 62.60m (205.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2017,  Bridge Improvement Cost: $535,000,  Roadway Improvement Cost: $883,000,  Total Project Cost: $1,499,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17568,  Location: 0.6 MI S SH-19 (Lat: 34.732236,  Lng: -97.257461),  Route carried "on" structure: Interstate 35,  Year Built: 1969,  Status: Open,  Structure Length: 9.17m (30.09ft),  Average Daily Traffic: 17,250 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 27,600 (year 2036),  Design Load: HS 20,  Features Intersected: RUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.307,  Lanes on structure: 2,  Base Highway Network: Yes (,  Subroute: 4),  Owner: State Highway Agency,  Approaching Roadway Width: 116.0m (380.6ft),  Skew: 12 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 111.90m (367.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2016,  Bridge Improvement Cost: $1,435,000,  Roadway Improvement Cost: $2,368,000,  Total Project Cost: $4,018,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17569,  Location: 0.6 MI S OF SH-19 (Lat: 34.732178,  Lng: -97.258056),  Route carried "on" structure: Interstate 35,  Year Built: 1969,  Status: Open,  Structure Length: 9.17m (30.09ft),  Average Daily Traffic: 15,900 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 25,440 (year 2036),  Design Load: HS 20,  Features Intersected: RUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.307,  Lanes on structure: 2,  Base Highway Network: Yes (,  Subroute: 4),  Owner: State Highway Agency,  Approaching Roadway Width: 116.0m (380.6ft),  Skew: 12 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 111.90m (367.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2016,  Bridge Improvement Cost: $1,435,000,  Roadway Improvement Cost: $2,368,000,  Total Project Cost: $4,018,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 179,  Location: 18.9 MI N MURRAY C/L (Lat: 34.760947,  Lng: -97.283581),  Route carried "under" structure: County highway E1560,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 250 (year 2016),  Truck Traffic: 10%,  Features Intersected: E1560 UNDER,  Facility Carried by Structure: I-35
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 30.297,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 17901,  Location: 18.9 MI N MURRAY C/L (Lat: 34.760928,  Lng: -97.282936),  Route carried "on" structure: Interstate 35,  Year Built: 1970,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 16,500 (year 2016),  Truck Traffic: 36%,  Average Future Daily Traffic: 26,400 (year 2036),  Design Load: HS 20,  Features Intersected: E1560 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.297,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 6),  Owner: State Highway Agency,  Approaching Roadway Width: 116.0m (380.6ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 65.30m (214.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2017,  Bridge Improvement Cost: $555,000,  Roadway Improvement Cost: $916,000,  Total Project Cost: $1,554,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17901,  Location: 18.9 MI N MURRAY C/L (Lat: 34.760928,  Lng: -97.282936),  Route carried "under" structure: County highway E1580,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 250 (year 2016),  Truck Traffic: 10%,  Features Intersected: E1560 UNDER,  Facility Carried by Structure: I-35
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 30.297,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 17925,  Location: 17 MI N MURRAY C/L (Lat: 34.739122,  Lng: -97.263111),  Route carried "on" structure: Interstate 35,  Year Built: 1970,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 15,900 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 25,440 (year 2036),  Design Load: HS 20,  Features Intersected: S.H. 19 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.289,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (,  Subroute: 4),  Owner: State Highway Agency,  Approaching Roadway Width: 116.0m (380.6ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 47.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 104.40m (342.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2017,  Bridge Improvement Cost: $1,340,000,  Roadway Improvement Cost: $2,210,000,  Total Project Cost: $3,751,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17925,  Location: 17 MI N MURRAY C/L (Lat: 34.739122,  Lng: -97.263111),  Route carried "under" structure: State highway 19,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 11,700 (year 2016),  Truck Traffic: 7%,  Features Intersected: S.H. 19 UNDER,  Facility Carried by Structure: I-35
Minimum Vertical Clearance: 0.49m (1.61ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 17926,  Location: 17 MI N MURRAY C/L (Lat: 34.739114,  Lng: -97.262425),  Route carried "on" structure: Interstate 35,  Year Built: 1970,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 17,250 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 27,600 (year 2036),  Design Load: HS 20,  Features Intersected: S.H. 19 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.289,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (,  Subroute: 4),  Owner: State Highway Agency,  Approaching Roadway Width: 116.0m (380.6ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 47.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 104.40m (342.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2017,  Bridge Improvement Cost: $1,340,000,  Roadway Improvement Cost: $2,210,000,  Total Project Cost: $3,751,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17926,  Location: 17 MI N MURRAY C/L (Lat: 34.739114,  Lng: -97.262425),  Route carried "under" structure: State highway 19,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 11,700 (year 2016),  Truck Traffic: 7%,  Features Intersected: S.H. 19 UNDER,  Facility Carried by Structure: I-35
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 16.106,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 17927,  Location: 4.1 MI N JCT SH 29 (Lat: 34.705903,  Lng: -97.245347),  Route carried "on" structure: County highway 2502,  Year Built: 1970,  Status: Open,  Structure Length: 7.99m (26.21ft),  Average Daily Traffic: 4,250 (year 2016),  Truck Traffic: 26%,  Average Future Daily Traffic: 6,800 (year 2036),  Design Load: HS 20,  Features Intersected: I-35 UNDER,  Facility Carried by Structure: AIRLINE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.266,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 122.0m (400.3ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 40.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.84m (2.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2017,  Bridge Improvement Cost: $689,000,  Roadway Improvement Cost: $1,137,000,  Total Project Cost: $1,929,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17927,  Location: 4.1 MI N JCT SH 29 (Lat: 34.705903,  Lng: -97.245347),  Route carried "under" structure: Interstate 35,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 31,800 (year 2016),  Truck Traffic: 36%,  Features Intersected: I-35 UNDER,  Facility Carried by Structure: AIRLINE RD.
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 23.266,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 1793,  Location: 5.0 MI N. S.H. 29 (Lat: 34.724647,  Lng: -97.254333),  Route carried "on" structure: County highway E1580,  Year Built: 1970,  Status: Open,  Structure Length: 8.41m (27.59ft),  Average Daily Traffic: 1,750 (year 2016),  Truck Traffic: 13%,  Average Future Daily Traffic: 2,800 (year 2036),  Design Load: HS 20,  Features Intersected: I-35 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.547,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 67.0m (219.8ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.2m (10.5ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 34.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 89.40m (293.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2017,  Bridge Improvement Cost: $727,000,  Roadway Improvement Cost: $1,199,000,  Total Project Cost: $2,035,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1793,  Location: 5.0 MI N. S.H. 29 (Lat: 34.724647,  Lng: -97.254333),  Route carried "under" structure: Interstate 35,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 31,800 (year 2016),  Truck Traffic: 36%,  Features Intersected: I-35 UNDER,  Facility Carried by Structure: E1580 ROYAL OAKS
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 2.547,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 3.2m (10.5ft)

Find on map >>   Show street view

Structure Number: 18623,  Location: 4.1 E .8 N OF MC CARTY (Lat: 34.681031,  Lng: -97.245292),  Route carried "on" structure: County highway 2574C,  Year Built: 1974,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 100 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2036),  Features Intersected: RED BRANCH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 55.0m (180.4ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.9m (19.4ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 26.60m (87.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2016,  Bridge Improvement Cost: $136,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1975,  Location: 3. N .5 E WYNNEWOOD (Lat: 34.688175,  Lng: -97.160144),  Route carried "on" structure: County highway N3280,  Year Built: 1980,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 100 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2036),  Design Load: H 20,  Features Intersected: NEGRO SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 55.0m (180.4ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 47.50m (155.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2016,  Bridge Improvement Cost: $243,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $387,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20341,  Location: 11.3 MI N SH 7 (Lat: 34.684522,  Lng: -97.247550),  Route carried "on" structure: County highway N3230,  Year Built: 1983,  Status: Open,  Structure Length: 0.74m (2.43ft),  Average Daily Traffic: 100 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2036),  Design Load: HS 20,  Features Intersected: RED BRANCH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.262,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 0.7m (2.3ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 0.3m (1.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 27.90m (91.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2016,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 21171,  Location: 4.0 MI S OF PAULS VALLEY (Lat: 34.680931,  Lng: -97.214794),  Route carried "on" structure: County highway 2574C,  Year Built: 1986,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 100 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2036),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 55.0m (180.4ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 0.3m (1.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 28.60m (93.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2016,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Discuss Pauls Valley, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2020 Advameg, Inc.