U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Pawlet, Vermont (VT) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Pawlet, VT, Vermont, Vermont forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 11
Total length: 19 meters (62ft)
Total costs: $8,106,000
Total average daily traffic: 13,037
Total average daily truck traffic: 972
Total future (year 2015) average daily traffic: 19,555
National Bridge Inventory (NBI) Registered Bridges for Pawlet

New bridges - Historical Statistics

  • 1910-1919: 1
  • 1920-1929: 1
  • 1930-1939: 7
  • 1940-1949: 0
  • 1950-1959: 1
  • 1960-1969: 0
  • 1970-1979: 1

Reconstructed bridges - Historical Statistics

  • 1930-1939: 1
  • 1940-1949: 1
  • 1950-1959: 0
  • 1960-1969: 1
  • 1970-1979: 1
  • 1980-1989: 1

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 101114002311141,  Location: 0.25 MI TO JCT W VT30 (Lat: 43.345278,  Lng: -73.181667),  Route carried "on" structure: Other road C3024,  Year Built: 1938,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 150 (year 1998),  Truck Traffic: 5%,  Average Future Daily Traffic: 225 (year 2018),  Features Intersected: METTAWEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 3.6m (11.8ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $498,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $648,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 101114002411141,  Location: 0.01 MI TO JCT W CL2 TH1 (Lat: 43.370833,  Lng: -73.216111),  Route carried "on" structure: Other road C3016,  Year Built: 1950,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 50 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 75 (year 2018),  Design Load: HS 15,  Features Intersected: METTAWEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.93m (9.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $404,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $554,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 101114002511141,  Location: 0.15 MI TO JCT W VT30 (Lat: 43.393333,  Lng: -73.224444),  Route carried "on" structure: Other road C3008,  Year Built: 1933,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 1,077 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,615 (year 2024),  Design Load: HS 20,  Features Intersected: METTAWEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $777,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $927,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200015007011142,  Location: 1.5 MI S JCT. VT.133 (Lat: 43.325556,  Lng: -73.171389),  Route carried "on" structure: State highway 30,  Year Built: 1934,  Year Reconstructed: 1949,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 2,800 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,200 (year 2018),  Design Load: H 15,  Features Intersected: METTAWEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 84.670,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.93m (9.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $845,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $995,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200015007311142,  Location: 0.01 MI N JCT. VT.133 (Lat: 43.346667,  Lng: -73.177500),  Route carried "on" structure: State highway 30,  Year Built: 1916,  Year Reconstructed: 1942,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 2,300 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,450 (year 2018),  Design Load: H 20,  Features Intersected: FLOWER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 87.127,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 15.3m (50.2ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.35m (7.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,091,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,241,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200131000611142,  Location: 5.8 MI W JCT. VT.30 (Lat: 43.320833,  Lng: -73.243333),  Route carried "on" structure: County highway 1,  Year Built: 1937,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 430 (year 1995),  Truck Traffic: 6%,  Average Future Daily Traffic: 645 (year 2015),  Design Load: H 15,  Features Intersected: INDIAN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 58.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $406,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $556,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 200131000811142,  Location: 1.3 MI W JCT. VT.30 (Lat: 43.372778,  Lng: -73.230556),  Route carried "on" structure: County highway 1,  Year Built: 1922,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 550 (year 1995),  Truck Traffic: 6%,  Average Future Daily Traffic: 825 (year 2015),  Design Load: H 15,  Features Intersected: METTAWEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $236,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $261,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 200139000111142,  Location: 0.4 MI E JCT. VT.30 (Lat: 43.348056,  Lng: -73.169722),  Route carried "on" structure: State highway 133,  Year Built: 1936,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 1,200 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,800 (year 2018),  Design Load: H 15,  Features Intersected: FLOWER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $627,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $777,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200139000211142,  Location: 0.6 MI E JCT. VT.30 (Lat: 43.348056,  Lng: -73.165556),  Route carried "on" structure: State highway 133,  Year Built: 1936,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 1,200 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,800 (year 2018),  Design Load: H 15,  Features Intersected: FLOWER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 50.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $497,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $647,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200139000311142,  Location: 1.5 MI E JCT. VT.30 (Lat: 43.354444,  Lng: -73.152778),  Route carried "on" structure: State highway 133,  Year Built: 1937,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 780 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,170 (year 2018),  Design Load: H 15,  Features Intersected: FLOWER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $622,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $772,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 200154000211142,  Location: 0.6 MI W JCT. VT.30 (Lat: 43.403056,  Lng: -73.237222),  Route carried "on" structure: State highway 149,  Year Built: 1971,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 2,500 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,750 (year 2018),  Design Load: HS 20,  Features Intersected: WELLS BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 69.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $578,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $728,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric

Discuss this city on our hugely popular Vermont forum

Back to: Pawlet, VT, Vermont, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.