National Bridge Inventory (NBI) Statistics
Number of bridges: 29
Total length: 101 meters (331ft)
Total costs: $41,886,000
Total average daily traffic: 1,024,500
Total average daily truck traffic: 111,347
Total future (year 2027) average daily traffic: 1,617,993
National Bridge Inventory (NBI) Registered Bridges for Peabody

New bridges - Historical Statistics

  • Before 1900: 1
  • 1900-1909: 0
  • 1910-1919: 0
  • 1920-1929: 0
  • 1930-1939: 3
  • 1940-1949: 3
  • 1950-1959: 6
  • 1960-1969: 0
  • 1970-1979: 6
  • 1980-1989: 7
  • 1990-1999: 0
  • 2000-2009: 3

Reconstructed bridges - Historical Statistics

  • 1980-1989: 1
  • 1990-1999: 0
  • 2000-2009: 2

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Find on map >>

Structure Number: P030012TFMHDNBI,  Location: .1 MI N RR TRACKS (Lat: 42.548506,  Lng: -70.983778),  Route carried "on" structure: US 1,  Year Built: 1948,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 2.17m (7.12ft),  Average Daily Traffic: 45,700 (year 2004),  Truck Traffic: 12%,  Average Future Daily Traffic: 72,174 (year 2027),  Design Load: HS 20,  Features Intersected: HWY LOWELL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.495,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.7m (41.7ft),  Skew: 32 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $582,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $874,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: P030012TGMHDNBI,  Location: .1 MI. N RR TRACKS (Lat: 42.548556,  Lng: -70.984031),  Route carried "on" structure: US 1,  Year Built: 1948,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 2.17m (7.12ft),  Average Daily Traffic: 45,700 (year 2004),  Truck Traffic: 12%,  Average Future Daily Traffic: 72,174 (year 2027),  Design Load: HS 20,  Features Intersected: HWY LOWELL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.495,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.7m (41.7ft),  Skew: 32 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $582,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $874,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: P030062QCMHD634,  Location: NEXT TO WARREN STREET CAF (Lat: 42.529936,  Lng: -70.930742),  Route carried "on" structure: City street ,  Year Built: 1946,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 6,400 (year 2006),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,108 (year 2027),  Design Load: H 20,  Features Intersected: RR MBTA/BMRR,  Facility Carried by Structure: HWY WARREN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $270,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $406,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: P03007AX6MHD634,  Location: .1 MI N PINE STREET (Lat: 42.543667,  Lng: -70.995367),  Route carried "on" structure: State highway ,  Year Built: 2004,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 4,100 (year 2007),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,475 (year 2028),  Design Load: HS 20,  Features Intersected: RR MBTA,  Facility Carried by Structure: HWY JOHNSON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 0.0m,  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Inventory Rating: 60.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: P03008AX5MHD634,  Location: .1 MI S PINE STREET (Lat: 42.542061,  Lng: -70.995653),  Route carried "on" structure: State highway ,  Year Built: 2004,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 100 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 158 (year 2028),  Design Load: HS 20,  Features Intersected: RR MBTA,  Facility Carried by Structure: HWY JHNSN ST EXT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 3.9m (12.8ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 98.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: P030092QDMHD634,  Location: .1 MI SW OF RTE 114 (Lat: 42.533108,  Lng: -70.930764),  Route carried "on" structure: City street ,  Year Built: 1937,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 6,500 (year 2006),  Truck Traffic: 2%,  Average Future Daily Traffic: 10,265 (year 2027),  Features Intersected: RR MBTA/BMRR,  Facility Carried by Structure: HWY ENDICOTT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $328,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: P03010AF9MHDNBI,  Location: .8K EAST OF ST 128 (Lat: 42.535022,  Lng: -70.930758),  Route carried "on" structure: State highway 114,  Year Built: 2000,  Status: Open,  Structure Length: 1.69m (5.54ft),  Average Daily Traffic: 45,000 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 71,068 (year 2028),  Design Load: HS 20,  Features Intersected: RR MBTA/BMRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.200,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.6m (54.5ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: P030132RJMUNNBI,  Location: .16 KM NO. OF MAIN STREET (Lat: 42.523828,  Lng: -70.919386),  Route carried "on" structure: City street ,  Year Built: 1850,  Status: Posted for load,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 10,000 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 15,793 (year 2028),  Features Intersected: WATER NORTH RIVER,  Facility Carried by Structure: HWY HOWLEY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Masonry,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 0.0m,  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Poor,  Operating Rating: 8.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 8.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2007,  Underwater Inspection Date: July 2007,  Other Special Inspection Date: July 2007,  Bridge Improvement Cost: $773,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $1,160,000 ( Estimate for 2006),  Deck Structure Type: Other
Find on map >>

Structure Number: P030152UEMHDNBI,  Location: .8 MI S ST114 (Lat: 42.533467,  Lng: -70.951325),  Route carried "on" structure: State highway 128,  Year Built: 1937,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 97,500 (year 2007),  Truck Traffic: 12%,  Average Future Daily Traffic: 153,982 (year 2028),  Design Load: HS 20,  Features Intersected: HWY LOWELL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.675,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 19.0m (62.3ft),  Out-to-Out Width: 23.9m (78.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 66.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $412,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $619,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: P030162UMMHDNBI,  Location: .8 MI LOWELL STREET (Lat: 42.539697,  Lng: -70.938306),  Route carried "on" structure: State highway 114,  Year Built: 1938,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 44,900 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 70,911 (year 2027),  Design Load: H 20,  Features Intersected: ST128
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.328,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $974,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,462,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: P030212UFMHDNBI,  Location: .3 MI S ST114 (Lat: 42.537275,  Lng: -70.943056),  Route carried "on" structure: State highway 128,  Year Built: 1958,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 97,500 (year 2007),  Truck Traffic: 12%,  Average Future Daily Traffic: 153,982 (year 2028),  Design Load: H 20,  Features Intersected: HWY ACCESS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 26.8m (87.9ft),  Out-to-Out Width: 29.9m (98.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Inventory Rating: 75.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $359,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $539,000 ( Estimate for 2006),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: P030232VNMHDNBI,  Location: .2 MI E US1 (Lat: 42.518908,  Lng: -70.994178),  Route carried "on" structure: Interstate 95,  Year Built: 1959,  Status: Open,  Structure Length: 7.41m (24.31ft),  Average Daily Traffic: 59,400 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 93,810 (year 2028),  Design Load: H 20,  Features Intersected: I 95 /ST128,  Facility Carried by Structure: US 1 CONN RPS A&B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 23.5m (77.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 46.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.50m (24.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $3,147,000,  Roadway Improvement Cost: $315,000,  Total Project Cost: $4,721,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: P030242VPMHDNBI,  Location: .1 MI E US1 (Lat: 42.520397,  Lng: -70.995631),  Route carried "on" structure: Interstate 95,  Year Built: 1959,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 22,000 (year 2007),  Truck Traffic: 12%,  Average Future Daily Traffic: 34,745 (year 2028),  Design Load: H 20,  Features Intersected: I 95 RAMP F
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 101.659,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $325,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $488,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: P030252VQMHDNBI,  Location: .1 MI E US1 (Lat: 42.521628,  Lng: -70.994828),  Route carried "on" structure: Interstate 95,  Year Built: 1959,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 16,800 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 26,532 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: I 95 RAMP C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 101.666,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $550,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $826,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: P030262VRMHDNBI,  Location: 2.1 KM S I95 (Lat: 42.523406,  Lng: -70.997056),  Route carried "on" structure: Interstate 95,  Year Built: 1959,  Status: Open,  Structure Length: 7.99m (26.21ft),  Average Daily Traffic: 35,000 (year 2007),  Truck Traffic: 12%,  Average Future Daily Traffic: 55,276 (year 2028),  Design Load: HS 20,  Features Intersected: US 1 NEWBURY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.5m (57.4ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.1m (95.5ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 17.5m (57.4ft),  Out-to-Out Width: 21.5m (70.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 47.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $3,042,000,  Roadway Improvement Cost: $305,000,  Total Project Cost: $4,564,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: P030272TEMHDNBI,  Location: 0.16 KM EAST US 1 (Lat: 42.526389,  Lng: -70.993472),  Route carried "on" structure: State highway ,  Year Built: 1959,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 5,600 (year 2007),  Truck Traffic: 26%,  Average Future Daily Traffic: 8,844 (year 2028),  Design Load: H 20,  Features Intersected: HWY RAMP C TO US 1 N,  Facility Carried by Structure: HWY DEARBON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.3m (53.5ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $421,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $632,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: P030362VWMHDNBI,  Location: .1 MI N LOWELL STREET (Lat: 42.547000,  Lng: -70.982603),  Route carried "on" structure: Interstate 95,  Year Built: 1974,  Status: Open,  Structure Length: 0.93m (3.05ft),  Average Daily Traffic: 35,600 (year 2007),  Truck Traffic: 13%,  Average Future Daily Traffic: 56,223 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: RR MBTA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 105.163,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.7m (28.5ft),  Curb-To-Curb Width: 81.5m (267.4ft),  Out-to-Out Width: 82.8m (271.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Critical Feature Inspection Date: March 2007,  Bridge Improvement Cost: $296,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $445,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: P030362VXMHDNBI,  Location: .1 MI N LOWELL STREET (Lat: 42.546631,  Lng: -70.983119),  Route carried "on" structure: Interstate 95,  Year Built: 1974,  Status: Open,  Structure Length: 0.93m (3.05ft),  Average Daily Traffic: 54,200 (year 2007),  Truck Traffic: 13%,  Average Future Daily Traffic: 85,598 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: RR MBTA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 105.163,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.7m (28.5ft),  Curb-To-Curb Width: 81.5m (267.4ft),  Out-to-Out Width: 82.8m (271.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Critical Feature Inspection Date: March 2007,  Bridge Improvement Cost: $296,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $445,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: P0303731TMHDNBI,  Location: AT FOREST STREET (Lat: 42.532333,  Lng: -70.982247),  Route carried "on" structure: State highway ,  Year Built: 1974,  Status: Open,  Structure Length: 8.90m (29.20ft),  Average Daily Traffic: 3,800 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,001 (year 2028),  Design Load: HS 20,  Features Intersected: I 95,  Facility Carried by Structure: HWY FOREST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 42.4m (139.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 54.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.00m (29.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $463,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $695,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: P030402VUMHDNBI,  Location: .2 MI E US1 (Lat: 42.547114,  Lng: -70.982542),  Route carried "on" structure: Interstate 95,  Year Built: 1974,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 35,600 (year 2007),  Truck Traffic: 13%,  Average Future Daily Traffic: 56,223 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: HWY LOWELL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 103.945,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 19.7m (64.6ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $371,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: P030402VVMHDNBI,  Location: .2 MI E US1 (Lat: 42.547261,  Lng: -70.982733),  Route carried "on" structure: Interstate 95,  Year Built: 1974,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 54,300 (year 2007),  Truck Traffic: 13%,  Average Future Daily Traffic: 85,756 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: HWY LOWELL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 103.945,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 19.7m (64.6ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $371,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: P030442VTMHDNBI,  Location: .1 MI E US1 (Lat: 42.542650,  Lng: -70.986494),  Route carried "on" structure: Interstate 95,  Year Built: 1975,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 22,800 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 36,008 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: US 1 NB/NEWBURY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,575,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $2,363,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: P0304531UMHDNBI,  Location: 1.5MI S LOWELL STREET (Lat: 42.528597,  Lng: -70.954850),  Route carried "on" structure: State highway ,  Year Built: 1988,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 21,000 (year 2006),  Truck Traffic: 12%,  Average Future Daily Traffic: 33,165 (year 2027),  Design Load: HS 20,  Features Intersected: ST128,  Facility Carried by Structure: HWY FOREST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.977,  Lanes on structure: 6,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 25.1m (82.3ft),  Out-to-Out Width: 27.7m (90.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 7.00m (22.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $1,320,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,981,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: P030462VYMHDNBI,  Location: .1 MI E US1 (Lat: 42.541714,  Lng: -70.985103),  Route carried "on" structure: Interstate 95,  Year Built: 1986,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 54,000 (year 2008),  Truck Traffic: 12%,  Average Future Daily Traffic: 85,282 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: I 95 RAMP FROM US 1 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 40.2m (131.9ft),  Skew: 25 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 63.7m (209.0ft),  Curb-To-Curb Width: 40.2m (131.9ft),  Out-to-Out Width: 41.1m (134.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 69.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 6.70m (21.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $4,916,000,  Roadway Improvement Cost: $492,000,  Total Project Cost: $7,375,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: P030472W0MHDNBI,  Location: .6 MI S FOREST STREET (Lat: 42.524192,  Lng: -70.980047),  Route carried "on" structure: Interstate 95,  Year Built: 1988,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 38,800 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 61,277 (year 2027),  Design Load: HS 20,  Features Intersected: I 95 RAMP E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $792,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $1,189,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: P030482W1MHDNBI,  Location: .7 MI S FOREST STREET (Lat: 42.523292,  Lng: -70.978392),  Route carried "on" structure: Interstate 95,  Year Built: 1988,  Status: Open,  Structure Length: 8.35m (27.40ft),  Average Daily Traffic: 38,100 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 60,171 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: ST128
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 42.1m (138.1ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $1,980,000,  Roadway Improvement Cost: $199,000,  Total Project Cost: $2,971,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: P030492W2MHDNBI,  Location: .7 MI S FOREST STREET (Lat: 42.522758,  Lng: -70.977406),  Route carried "on" structure: Interstate 95,  Year Built: 1988,  Status: Open,  Structure Length: 5.39m (17.68ft),  Average Daily Traffic: 38,800 (year 2006),  Truck Traffic: 12%,  Average Future Daily Traffic: 61,277 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: I 95 RAMP J
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 51.8m (169.9ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 5.40m (17.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $1,273,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,910,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: P030502UGMHDNBI,  Location: 1.7 MI S LOWELL STREET (Lat: 42.523736,  Lng: -70.973969),  Route carried "on" structure: State highway 128,  Year Built: 1988,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 82,100 (year 2006),  Truck Traffic: 12%,  Average Future Daily Traffic: 129,661 (year 2027),  Design Load: HS 20,  Features Intersected: I 95 RAMP J
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 49.1m (161.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 49.0m (160.8ft),  Out-to-Out Width: 49.9m (163.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $2,851,000,  Roadway Improvement Cost: $286,000,  Total Project Cost: $4,277,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: P030512LJMHDNBI,  Location: 1 MILE N OF US ONE (Lat: 42.522953,  Lng: -70.981764),  Route carried "on" structure: State highway ,  Year Built: 1988,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 3,200 (year 2008),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,054 (year 2029),  Design Load: HS 20,  Features Intersected: I 95 /ST128,  Facility Carried by Structure: HWY FARM AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.603,  Lanes on structure: 2,  Lanes under structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 45.1m (148.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 72.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing

Discuss this city on our hugely popular Massachusetts forum

Back to: Peabody, MA, Massachusetts, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.