Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Peekskill, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 190ft / 58.3mTotal length
  • $100,643,000Total costs
  • 334,956Total average daily traffic
  • 8,987Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Peekskill
  • No street view available for this location

New bridges in Peekskill, NY - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 21940-1949
  • 21960-1969
  • 11980-1989
  • 51990-1999
  • 12000-2009
  • 82010-2019
Average Bridge Daily Traffic in Peekskill, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 54.5%Good
  • 36.4%Satisfactory
  • 9.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.7%Excellent
  • 23.1%Very good
  • 30.8%Good
  • 38.5%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.7%Very good
  • 46.2%Good
  • 30.8%Satisfactory
  • 15.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 100341,  Location: 3.6 MI S JCT RTS 6&202&9D (Lat: 41.296314,  Lng: -73.933875),  Route carried "on" structure: US 6,  Year Built: 1948,  Status: Open,  Structure Length: 14.08m (46.19ft),  Average Daily Traffic: 25,742 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 36,314 (year 2040),  Design Load: HS 20,  Features Intersected: OLD PEMART AVENUE, ANNSV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.162,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m,  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 19.4m (63.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 14.08m (46.19ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $11,380,000,  Roadway Improvement Cost: $6,664,000,  Total Project Cost: $18,045,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1005099,  Location: 5.8 MI N JCT RTS 9+129 (Lat: 41.270550,  Lng: -73.934386),  Route carried "on" structure: US 9,  Year Built: 1964,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 32,870 (year 2014),  Truck Traffic: 4%,  Average Future Daily Traffic: 46,369 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: WELCHER AVE CR92
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.540,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 18.1m (59.4ft),  Out-to-Out Width: 24.8m (81.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 72.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 56.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $4,208,000,  Roadway Improvement Cost: $2,464,000,  Total Project Cost: $6,673,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 10051,  Location: 0.6MI S JCT RTS 9 & 6 (Lat: 41.280814,  Lng: -73.929894),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 1,004 (year 2015),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,242 (year 2040),  Design Load: HS 20,  Features Intersected: 9 9 87033008 SB, RTE 9,  Facility Carried by Structure: FRANKLIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.4m (122.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 79.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 61.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.87m (12.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,992,000,  Roadway Improvement Cost: $1,752,000,  Total Project Cost: $4,743,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100511,  Location: 0.5 MI S JCT RTS 9 AND 6 (Lat: 41.281958,  Lng: -73.929853),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 672 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 941 (year 2036),  Design Load: HS 20,  Features Intersected: 9 9 87033009 SB, RTE 9,  Facility Carried by Structure: NEW BAY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,536,000,  Roadway Improvement Cost: $1,485,000,  Total Project Cost: $4,021,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100512,  Location: 6.6 MI N JCT RTS 9+129 (Lat: 41.283561,  Lng: -73.929717),  Route carried "on" structure: US 9,  Year Built: 2010,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 32,870 (year 2014),  Truck Traffic: 4%,  Average Future Daily Traffic: 46,369 (year 2040),  Design Load: HL 93,  Features Intersected: REQUA STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.036,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 26.3m (86.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $5,136,000,  Roadway Improvement Cost: $3,008,000,  Total Project Cost: $8,144,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100513,  Location: 6.7 MI N JCT RTS 9+129 (Lat: 41.285803,  Lng: -73.929106),  Route carried "on" structure: US 9,  Year Built: 2010,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 32,870 (year 2014),  Truck Traffic: 4%,  Average Future Daily Traffic: 46,369 (year 2040),  Design Load: HL 93,  Features Intersected: HUDSON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.293,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.9m (104.7ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 26.3m (86.3ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $5,926,000,  Roadway Improvement Cost: $3,470,000,  Total Project Cost: $9,396,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100514,  Location: 6.9 MI N JCT US 9 & SH129 (Lat: 41.288364,  Lng: -73.928581),  Route carried "on" structure: US 9,  Year Built: 2010,  Status: Open,  Structure Length: 10.09m (33.10ft),  Average Daily Traffic: 32,870 (year 2014),  Truck Traffic: 4%,  Average Future Daily Traffic: 46,369 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CENTRAL AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.519,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 23 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 50.0m (164.0ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 29.9m (98.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.08m (33.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $16,699,000,  Roadway Improvement Cost: $9,779,000,  Total Project Cost: $26,479,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 105045,  Location: 0.4 MI E RTE 9-ANNSVILLE (Lat: 41.305169,  Lng: -73.924253),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 2.35m (7.71ft),  Truck Traffic: 6%,  Design Load: HS 25 or greater,  Features Intersected: PEEKSKILL HOL CRK,  Facility Carried by Structure: COUNTY ROAD 306
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.384,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 88.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 60.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $845,000,  Roadway Improvement Cost: $495,000,  Total Project Cost: $1,339,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 105438,  Location: JCT US 9 & US 202 (Lat: 41.289119,  Lng: -73.928769),  Route carried "on" structure: US 6,  Year Built: 2010,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 7,623 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,658 (year 2040),  Design Load: HL 93,  Features Intersected: 9 9 87033014, RTE 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.514,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.3m (102.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,805,000,  Roadway Improvement Cost: $1,643,000,  Total Project Cost: $4,447,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10716,  Location: 1 MILE NE JCT US 9 & US 6 (Lat: 41.302264,  Lng: -73.920611),  Route carried "on" structure: State highway 987H,  Year Built: 1930,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 14,368 (year 2009),  Truck Traffic: 3%,  Average Future Daily Traffic: 20,268 (year 2040),  Features Intersected: HIGHLAND AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.352,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.9m (81.7ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 60.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 14.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,399,000,  Roadway Improvement Cost: $1,405,000,  Total Project Cost: $3,804,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107161,  Location: 1.2 MI NE JCT US 9 & US 6 (Lat: 41.301469,  Lng: -73.915944),  Route carried "on" structure: State highway 987H,  Year Built: 1930,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 14,368 (year 2009),  Truck Traffic: 3%,  Average Future Daily Traffic: 20,268 (year 2040),  Features Intersected: DIVISION STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.4m (53.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,957,000,  Roadway Improvement Cost: $1,146,000,  Total Project Cost: $3,104,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107403,  Location: 0.8 MI S JCT RTS 9 & 6 (Lat: 41.276903,  Lng: -73.930972),  Route carried "on" structure: US 9,  Year Built: 1990,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 32,870 (year 2014),  Truck Traffic: 4%,  Average Future Daily Traffic: 46,369 (year 2040),  Design Load: HS 20,  Features Intersected: LOUISA STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.280,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 18.8m (61.7ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,338,000,  Roadway Improvement Cost: $1,369,000,  Total Project Cost: $3,708,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 22624,  Location: IN PEEKSKILL (Lat: 41.278356,  Lng: -73.937078),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 5.82m (19.09ft),  Truck Traffic: 4%,  Design Load: HS 20,  Features Intersected: METRO NO COMMUTER,  Facility Carried by Structure: COUNTY ROAD 155
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 83.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.82m (19.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $4,251,000,  Roadway Improvement Cost: $2,489,000,  Total Project Cost: $6,740,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 100341,  Location: 3.6 MI S JCT RTS 6&202&9D (Lat: 41.296314,  Lng: -73.933875),  Route carried "under" structure: City street ,  Year Built: 1948,  Structure Length: 0. m,  Features Intersected: OLD PEMART AVENUE, ANNSV,  Facility Carried by Structure: RTE 6
Minimum Vertical Clearance: 7.31m (23.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 1005099,  Location: 5.8 MI N JCT RTS 9+129 (Lat: 41.270550,  Lng: -73.934386),  Route carried "under" structure: Alternate County highway ,  Year Built: 1964,  Structure Length: 0. m,  Features Intersected: WELCHER AVE CR92,  Facility Carried by Structure: RTE 9
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 10051,  Location: 0.6MI S JCT RTS 9 & 6 (Lat: 41.280814,  Lng: -73.929894),  Route carried "under" structure: US 9,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 31,025 (year 1999),  Features Intersected: 9 9 87033008 SB, RTE 9,  Facility Carried by Structure: FRANKLIN STREET
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 1.400,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.4m (122.7ft)

Find on map >>   Show street view

Structure Number: 100511,  Location: 0.5 MI S JCT RTS 9 AND 6 (Lat: 41.281958,  Lng: -73.929853),  Route carried "under" structure: US 9,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 31,025 (year 1999),  Features Intersected: 9 9 87033009 SB, RTE 9,  Facility Carried by Structure: NEW BAY STREET
Minimum Vertical Clearance: 4.59m (15.06ft),  Kilometerpoint: 1.384,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 100512,  Location: 6.6 MI N JCT RTS 9+129 (Lat: 41.283561,  Lng: -73.929717),  Route carried "under" structure: City street ,  Year Built: 2010,  Structure Length: 0. m,  Features Intersected: REQUA STREET,  Facility Carried by Structure: RTE 9
Minimum Vertical Clearance: 6.53m (21.42ft),  Kilometerpoint: 0.129,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 100513,  Location: 6.7 MI N JCT RTS 9+129 (Lat: 41.285803,  Lng: -73.929106),  Route carried "under" structure: City street ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 4,286 (year 2017),  Truck Traffic: 4%,  Features Intersected: HUDSON AVENUE,  Facility Carried by Structure: RTE 9
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.9m (104.7ft)

Find on map >>   Show street view

Structure Number: 100514,  Location: 6.9 MI N JCT US 9 & SH129 (Lat: 41.288364,  Lng: -73.928581),  Route carried "under" structure: City street ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 1,610 (year 2016),  Truck Traffic: 4%,  Features Intersected: CENTRAL AVENUE,  Facility Carried by Structure: RTE 9
Minimum Vertical Clearance: 12.19m (39.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.0m (164.0ft)

Find on map >>   Show street view

Structure Number: 105438,  Location: JCT US 9 & US 202 (Lat: 41.289119,  Lng: -73.928769),  Route carried "under" structure: US 9,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 33,360 (year 1999),  Features Intersected: 9 9 87033014, RTE 9,  Facility Carried by Structure: RTE 6
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 3.556,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.3m (102.7ft)

Find on map >>   Show street view

Structure Number: 10716,  Location: 1 MILE NE JCT US 9 & US 6 (Lat: 41.302264,  Lng: -73.920611),  Route carried "under" structure: City street ,  Year Built: 1930,  Structure Length: 0. m,  Average Daily Traffic: 4,723 (year 2018),  Truck Traffic: 6%,  Features Intersected: HIGHLAND AVENUE,  Facility Carried by Structure: RTE 987H
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 0.901,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 24.9m (81.7ft)

Find on map >>   Show street view

Structure Number: 107161,  Location: 1.2 MI NE JCT US 9 & US 6 (Lat: 41.301469,  Lng: -73.915944),  Route carried "under" structure: City street ,  Year Built: 1930,  Structure Length: 0. m,  Average Daily Traffic: 800 (year 2021),  Features Intersected: DIVISION STREET,  Facility Carried by Structure: RTE 987H
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 16.4m (53.8ft)

Discuss Peekskill, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.