![]() |
Bridge Statistics for Pelham, Alabama (AL) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Pelham, AL, Alabama, Alabama forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 31 Total length: 148 meters (486ft) Total costs: $35,644,000 Total average daily traffic: 467,200 Total average daily truck traffic: 63,242 National Bridge Inventory (NBI) Registered Bridges for Pelham
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 2091, Location: @ CO RD 52 (Lat: 33.267778, Lng: -86.810556), Route carried "on" structure: US 31, Year Built: 1924, Year Reconstructed: 1940, Status: Open, Structure Length: 14.30m (46.92ft), Average Daily Traffic: 17,920 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 18,403 (year 2027), Design Load: H 15, Features Intersected: PEAVINE CK & ACL RR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 412.962, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 13.4m (44.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.6m (34.8ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Good, Operating Rating: 9.0 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 6.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: High priority of replacement, Deck Geometry: Meets minimum limits, Underclear: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 15.09m (49.51ft), Designated Inspection Frequency: Every 12 months, Other Special Inspection Frequency: Every 12 months, Inspection Date: April 2006, Other Special Inspection Date: January 2008, Bridge Improvement Cost: $2,084,000, Roadway Improvement Cost: $208,000, Total Project Cost: $3,126,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 2092, Location: .1 MI. SO. AL 119 (Lat: 33.339167, Lng: -86.802500), Route carried "on" structure: US 31, Year Built: 1924, Year Reconstructed: 1940, Status: Open, Structure Length: 3.87m (12.70ft), Average Daily Traffic: 17,920 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 18,332 (year 2027), Design Load: H 15, Features Intersected: CAHABA VALLEY CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 419.099, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 12.8m (42.0ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 12.3m (40.4ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Channel: Satisfactory, Operating Rating: 43.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.81m (15.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $771,000, Roadway Improvement Cost: $77,000, Total Project Cost: $1,156,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 3267, Location: .4 MI. W JCT ST RT 31 (Lat: 33.283333, Lng: -86.800000), Route carried "on" structure: County highway 52, Year Built: 1948, Status: Posted for load, Structure Length: 3.11m (10.20ft), Average Daily Traffic: 20,740 (year 2006), Truck Traffic: 20%, Average Future Daily Traffic: 29,033 (year 2026), Design Load: H 15, Features Intersected: BUCK CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 10.4m (34.1ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.5m (27.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Satisfactory, Operating Rating: 35.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 21.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Somewhat better than minimum adequacy, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 3.95m (12.96ft), Designated Inspection Frequency: Every 12 months, Other Special Inspection Frequency: Every 12 months, Inspection Date: June 2006, Other Special Inspection Date: June 2007, Bridge Improvement Cost: $439,000, Roadway Improvement Cost: $44,000, Total Project Cost: $659,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 3619, Location: OAK MTN. STATE PARK (Lat: 33.366667, Lng: -86.733333), Route carried "on" structure: Alternate State lands road , Year Built: 1950, Status: Open, Structure Length: 1.22m (4.00ft), Average Daily Traffic: 2,100 (year 2000), Truck Traffic: 2%, Average Future Daily Traffic: 3,500 (year 2025), Design Load: HS 20, Features Intersected: SPILLWAY, Facility Carried by Structure: VALLEY DRIVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.999, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.2m (40.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.8m (28.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Very good, Operating Rating: 43.5 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.88m (6.17ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Bridge Improvement Cost: $217,000, Roadway Improvement Cost: $22,000, Total Project Cost: $326,000 ( Estimate for 2008), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 5097, Location: @ CO RD 52 (Lat: 33.278889, Lng: -86.823056), Route carried "on" structure: US 31, Year Built: 1955, Status: Open, Structure Length: 13.01m (42.68ft), Average Daily Traffic: 17,920 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 18,403 (year 2027), Design Load: HS 20, Features Intersected: PEAVINE CK & ACL RR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 413.447, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Skew: 9 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 13.4m (44.0ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.4m (30.8ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Good, Operating Rating: 55.2 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: Somewhat better than minimum adequacy, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 13.82m (45.34ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $1,690,000, Roadway Improvement Cost: $169,000, Total Project Cost: $2,535,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 5098, Location: .1 MI.SO.AL 119 (Lat: 33.323333, Lng: -86.805278), Route carried "on" structure: US 31, Year Built: 1955, Status: Open, Structure Length: 3.84m (12.60ft), Average Daily Traffic: 17,920 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 18,332 (year 2027), Design Load: HS 20, Features Intersected: CAHABA VALLEY CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 418.986, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 12.8m (42.0ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.4m (30.8ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 56.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.78m (15.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $584,000, Roadway Improvement Cost: $58,000, Total Project Cost: $876,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 11382, Location: CHANDLAR RD & CHANDLAR LN (Lat: 33.283333, Lng: -86.783333), Route carried "on" structure: City street , Year Built: 1975, Status: Posted for load, Structure Length: 4.15m (13.62ft), Average Daily Traffic: 2,115 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 4,200 (year 2028), Design Load: H 15, Features Intersected: BISHOP CREEK, Facility Carried by Structure: CHANDLAR RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 10.4m (34.1ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 8.5m (27.9ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Good, Channel: Fair, Operating Rating: 10.9 metric tons, Inventory Rating: 7.2 metric tons, Structural Evaluation: High priority of replacement, Deck Geometry: High priority of corrective action, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 5.11m (16.77ft), Designated Inspection Frequency: Every 12 months, Inspection Date: March 2008, Bridge Improvement Cost: $566,000, Roadway Improvement Cost: $57,000, Total Project Cost: $849,000 ( Estimate for 2008), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 12033, Location: 0.8 MI E OF PELHAM (Lat: 33.266667, Lng: -86.783333), Route carried "on" structure: County highway 52, Year Built: 1978, Year Reconstructed: 2006, Status: Open, Structure Length: 0.75m (2.46ft), Average Daily Traffic: 10,221 (year 2007), Truck Traffic: 20%, Average Future Daily Traffic: 14,309 (year 2027), Design Load: HS 20, Features Intersected: HOGPEN CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 24.4m (80.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.7m (12.1ft) Condition: Channel: Good, Culverts: Fair, Operating Rating: 90.8 metric tons, Inventory Rating: 90.8 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.38m (4.53ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2007, Bridge Improvement Cost: $1,218,000, Roadway Improvement Cost: $122,000, Total Project Cost: $1,827,000 ( Estimate for 2008) Find on map >>
Structure Number: 12117, Location: I65 & HOGPEN CK (Lat: 33.285000, Lng: -86.789167), Route carried "on" structure: Interstate 65, Year Built: 1979, Status: Open, Structure Length: 1.37m (4.49ft), Average Daily Traffic: 69,180 (year 2007), Truck Traffic: 17%, Average Future Daily Traffic: 72,293 (year 2027), Design Load: HS 20, Features Intersected: HOGPEN CREEK Minimum Vertical Clearance: 7.56m (24.80ft), Kilometerpoint: 388.813, Lanes on structure: 5, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 24.4m (80.1ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 4.3m (14.1ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 43.5 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.04m (6.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2008, Bridge Improvement Cost: $3,071,000, Roadway Improvement Cost: $307,000, Total Project Cost: $4,606,000 ( Estimate for 2008), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 12118, Location: CO RD 52 & I65 (Lat: 33.286111, Lng: -86.824444), Route carried "on" structure: County highway , Year Built: 1979, Status: Open, Structure Length: 11.83m (38.81ft), Average Daily Traffic: 8,500 (year 2002), Truck Traffic: 10%, Average Future Daily Traffic: 11,900 (year 2022), Design Load: HS 20, Features Intersected: I65*, Facility Carried by Structure: CO RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 3, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 3 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Number Of Approach Spans: 1, Length of Maximum Span: 24.7m (81.0ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 14.3m (46.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 43.5 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 12.68m (41.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $2,366,000, Roadway Improvement Cost: $237,000, Total Project Cost: $3,549,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 12119, Location: I 65 & CO RD 33 (Lat: 33.324722, Lng: -86.806667), Route carried "on" structure: County highway 33, Year Built: 1979, Status: Open, Structure Length: 13.35m (43.80ft), Average Daily Traffic: 1,200 (year 2002), Truck Traffic: 2%, Average Future Daily Traffic: 1,300 (year 2026), Design Load: HS 20, Features Intersected: I 65 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 4 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 1, Length of Maximum Span: 39.6m (129.9ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 14.3m (46.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 60.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Equal to present desirable criteria, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 14.16m (46.46ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $2,642,000, Roadway Improvement Cost: $264,000, Total Project Cost: $3,963,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1212, Location: I 65 & OAK MT RD (Lat: 33.325833, Lng: -86.795833), Route carried "on" structure: Interstate 65, Year Built: 1979, Status: Open, Structure Length: 7.07m (23.20ft), Average Daily Traffic: 41,070 (year 2007), Truck Traffic: 16%, Average Future Daily Traffic: 42,959 (year 2028), Design Load: HS 20, Features Intersected: CO RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 393.646, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 6 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 26.8m (87.9ft), Curb-To-Curb Width: 11.9m (39.0ft), Out-to-Out Width: 12.8m (42.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 80.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 48.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 8.10m (26.57ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2008, Bridge Improvement Cost: $1,350,000, Roadway Improvement Cost: $135,000, Total Project Cost: $2,025,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 12121, Location: OAK MT RD & I 65 (Lat: 33.328889, Lng: -86.806111), Route carried "on" structure: Interstate 65, Year Built: 1979, Status: Open, Structure Length: 6.92m (22.70ft), Average Daily Traffic: 41,070 (year 2007), Truck Traffic: 16%, Average Future Daily Traffic: 42,959 (year 2028), Design Load: HS 20, Features Intersected: OAK MOUNTIAN ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 393.646, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 6 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 26.8m (87.9ft), Curb-To-Curb Width: 11.9m (39.0ft), Out-to-Out Width: 12.8m (42.0ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 47.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 7.94m (26.05ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2008, Bridge Improvement Cost: $1,324,000, Roadway Improvement Cost: $132,000, Total Project Cost: $1,986,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 14928, Location: .2MI E JCT CO 35 (Lat: 33.283333, Lng: -86.783333), Route carried "on" structure: County highway 72, Year Built: 1989, Status: Open, Structure Length: 0.80m (2.62ft), Average Daily Traffic: 769 (year 2007), Truck Traffic: 2%, Average Future Daily Traffic: 1,640 (year 2027), Design Load: HS 20, Features Intersected: PEAVINE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 2.4m (7.9ft) Condition: Channel: Fair, Culverts: Good, Operating Rating: 89.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 60.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.45m (4.76ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2007, Bridge Improvement Cost: $151,000, Roadway Improvement Cost: $15,000, Total Project Cost: $226,000 ( Estimate for 2008) Find on map >>
Structure Number: 17091, Location: 0.4MI N JCT US 31 (Lat: 33.300000, Lng: -86.800000), Route carried "on" structure: County highway 105, Year Built: 1998, Status: Open, Structure Length: 4.15m (13.62ft), Average Daily Traffic: 7,888 (year 2006), Average Future Daily Traffic: 11,043 (year 2026), Design Load: HS 20, Features Intersected: CAHABA VALLEY CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 10.4m (34.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 2.1m (6.9ft), Curb-To-Curb Width: 10.7m (35.1ft), Out-to-Out Width: 13.7m (44.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Channel: Very good, Operating Rating: 32.3 metric tons, Inventory Rating: 32.3 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.11m (16.77ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $912,000, Roadway Improvement Cost: $91,000, Total Project Cost: $1,368,000 ( Estimate for 2008), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 17681, Location: JCT FRONTIER DR (Lat: 33.266667, Lng: -86.766667), Route carried "on" structure: City street , Year Built: 1959, Year Reconstructed: 1999, Status: Open, Structure Length: 5.79m (19.00ft), Average Daily Traffic: 4,300 (year 2004), Truck Traffic: 5%, Average Future Daily Traffic: 8,600 (year 2026), Features Intersected: BISHOP CREEK, Facility Carried by Structure: CROSSCREEK TRAIL Minimum Vertical Clearance: 7.56m (24.80ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 24.4m (80.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.0m (3.3ft), Curb-To-Curb Width: 9.5m (31.2ft), Out-to-Out Width: 10.6m (34.8ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 32.7 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.82m (22.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $943,000, Roadway Improvement Cost: $94,000, Total Project Cost: $1,414,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 19877, Location: 0.15 MI SE EXIT 242 I-65 (Lat: 33.266667, Lng: -86.783333), Route carried "on" structure: City street , Year Built: 1986, Status: Open, Structure Length: 0.94m (3.08ft), Average Daily Traffic: 7,500 (year 2005), Average Future Daily Traffic: 7,500 (year 2028), Design Load: HS 20, Features Intersected: HOGPEN CREEK, Facility Carried by Structure: MCCAIN PARKWAY Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft) Condition: Channel: Good, Culverts: Fair, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Superior to present desirable criteria, Length Of Structure Improvement: 1.60m (5.25ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $255,000, Roadway Improvement Cost: $26,000, Total Project Cost: $383,000 ( Estimate for 2008) Find on map >>
Structure Number: 19878, Location: 0.1 MI E OF CR 33 (Lat: 33.283333, Lng: -86.800000), Route carried "on" structure: City street , Year Built: 1988, Status: Open, Structure Length: 0.67m (2.20ft), Average Daily Traffic: 1,650 (year 2005), Average Future Daily Traffic: 1,650 (year 2028), Design Load: HS 20, Features Intersected: COALES BRANCH, Facility Carried by Structure: COMMERCE DRIVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 8.4m (27.6ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.30m (4.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $177,000, Roadway Improvement Cost: $18,000, Total Project Cost: $266,000 ( Estimate for 2008) Find on map >>
Structure Number: 19879, Location: @ JCT W/ COMMERCE DRIVE (Lat: 33.283333, Lng: -86.800000), Route carried "on" structure: City street , Year Built: 1988, Status: Open, Structure Length: 0.67m (2.20ft), Average Daily Traffic: 800 (year 2005), Average Future Daily Traffic: 800 (year 2028), Design Load: HS 20, Features Intersected: COALES BRANCH, Facility Carried by Structure: COMMERCE CIRCLE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 8.4m (27.6ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft) Condition: Channel: Good, Culverts: Satisfactory, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.30m (4.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $177,000, Roadway Improvement Cost: $18,000, Total Project Cost: $266,000 ( Estimate for 2008) Find on map >>
Structure Number: 1988, Location: 0.1 MI NW JCT K. CREST LN (Lat: 33.266667, Lng: -86.766667), Route carried "on" structure: City street , Year Built: 1990, Status: Open, Structure Length: 1.30m (4.27ft), Average Daily Traffic: 2,230 (year 2005), Average Future Daily Traffic: 2,230 (year 2028), Design Load: HS 20, Features Intersected: PEAVINE CREEK, Facility Carried by Structure: WEATHERLY WAY Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 3.0m (9.8ft) Condition: Channel: Fair, Culverts: Satisfactory, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.97m (6.46ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $384,000, Roadway Improvement Cost: $38,000, Total Project Cost: $576,000 ( Estimate for 2008) Find on map >>
Structure Number: 19881, Location: 0.4 MI E JCT CR332/CSX RR (Lat: 33.266667, Lng: -86.750000), Route carried "on" structure: City street , Year Built: 1990, Status: Open, Structure Length: 0.98m (3.22ft), Average Daily Traffic: 620 (year 2005), Average Future Daily Traffic: 620 (year 2028), Design Load: HS 20, Features Intersected: PEAVINE CREEK, Facility Carried by Structure: WEATHERLY WAY Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft) Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.64m (5.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $320,000, Roadway Improvement Cost: $32,000, Total Project Cost: $480,000 ( Estimate for 2008) Find on map >>
Structure Number: 19882, Location: 0.25 MI E OF JCT CR35 (Lat: 33.283333, Lng: -86.783333), Route carried "on" structure: City street , Year Built: 1992, Status: Open, Structure Length: 0.63m (2.07ft), Average Daily Traffic: 175 (year 2005), Average Future Daily Traffic: 175 (year 2028), Design Load: HS 20, Features Intersected: HOGPEN CREEK, Facility Carried by Structure: BROOKSHIRE LANE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.25m (4.10ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $170,000, Roadway Improvement Cost: $17,000, Total Project Cost: $255,000 ( Estimate for 2008) Find on map >>
Structure Number: 19883, Location: 0.1 MI. E OF CR 33 (Lat: 33.283333, Lng: -86.800000), Route carried "on" structure: City street , Year Built: 1999, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 1,210 (year 2005), Average Future Daily Traffic: 1,210 (year 2028), Design Load: HS 20, Features Intersected: COALES BRANCH, Facility Carried by Structure: HIDDEN CREEK PKWY. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 8.2m (26.9ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.7m (12.1ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.51m (4.95ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $295,000, Roadway Improvement Cost: $30,000, Total Project Cost: $443,000 ( Estimate for 2008) Find on map >>
Structure Number: 19884, Location: WEST OF FIRE STATION # 5 (Lat: 33.250000, Lng: -86.733333), Route carried "on" structure: City street , Year Built: 2003, Status: Open, Structure Length: 0.96m (3.15ft), Average Daily Traffic: 101 (year 2005), Truck Traffic: 5%, Average Future Daily Traffic: 150 (year 2028), Design Load: HS 20, Features Intersected: S. FORK YELLOWLEAF CREEK, Facility Carried by Structure: BALLANTRAE CLUB DR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 8.2m (26.9ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.62m (5.31ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $268,000, Roadway Improvement Cost: $27,000, Total Project Cost: $402,000 ( Estimate for 2008) Find on map >>
Structure Number: 19885, Location: NE QUADRANT GOLF COURSE (Lat: 33.250000, Lng: -86.750000), Route carried "on" structure: City street , Year Built: 2003, Status: Open, Structure Length: 1.51m (4.95ft), Average Daily Traffic: 101 (year 2005), Average Future Daily Traffic: 150 (year 2026), Design Load: HS 20, Features Intersected: SPILLWAY FOR LAKE, Facility Carried by Structure: KILKERRAN LANE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 8.0m (26.2ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 3.7m (12.1ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft) Condition: Channel: Very good, Culverts: Good, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 2.18m (7.15ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $382,000, Roadway Improvement Cost: $38,000, Total Project Cost: $573,000 ( Estimate for 2008) Find on map >>
Structure Number: 19888, Location: 0.25 MI. W OF JCT US 31 (Lat: 33.266667, Lng: -86.800000), Route carried "on" structure: City street , Year Built: 2003, Status: Open, Structure Length: 2.17m (7.12ft), Average Daily Traffic: 5,450 (year 2002), Average Future Daily Traffic: 7,457 (year 2027), Design Load: HS 20, Features Intersected: BUCK CREEK, Facility Carried by Structure: STONEHAVEN TRAIL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 8.2m (26.9ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 5, Length of Maximum Span: 3.7m (12.1ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 2.96m (9.71ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $462,000, Roadway Improvement Cost: $46,000, Total Project Cost: $693,000 ( Estimate for 2008) Find on map >>
Structure Number: 19898, Location: 0.2 MILE FROM CR 11 (Lat: 33.300000, Lng: -86.716667), Route carried "on" structure: City street , Year Built: 2006, Status: Open, Structure Length: 3.53m (11.58ft), Average Daily Traffic: 50 (year 2007), Average Future Daily Traffic: 70 (year 2027), Design Load: HS 20, Features Intersected: CSX RAILROAD, Facility Carried by Structure: SUBDIVISION ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 8.8m (28.9ft), Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 35.3m (115.8ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.4m (30.8ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Better than present minimum criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.42m (14.50ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Bridge Improvement Cost: $544,000, Roadway Improvement Cost: $54,000, Total Project Cost: $816,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 12118, Location: I65 & CO RD 52 (Lat: 33.286111, Lng: -86.824444), Route carried "under" structure: Interstate 65, Year Built: 1979, Structure Length: 11.83m (38.81ft), Average Daily Traffic: 82,140 (year 2007), Truck Traffic: 16%, Features Intersected: I-65, Facility Carried by Structure: CO RD Minimum Vertical Clearance: 5.09m (16.70ft), Kilometerpoint: 389.344, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.7m (81.0ft) Find on map >>
Structure Number: 12119, Location: I65 & CO RD 33 (Lat: 33.324722, Lng: -86.806667), Route carried "under" structure: Interstate 65, Year Built: 1979, Structure Length: 13.35m (43.80ft), Average Daily Traffic: 82,140 (year 2007), Truck Traffic: 16%, Features Intersected: I-65, Facility Carried by Structure: CO RD 33 Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 392.229, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.6m (129.9ft) Find on map >>
Structure Number: 1212, Location: I65 AT OAK MT. RD. (Lat: 33.325833, Lng: -86.795833), Route carried "under" structure: County highway , Year Built: 1979, Structure Length: 7.07m (23.20ft), Average Daily Traffic: 1,100 (year 2002), Truck Traffic: 14%, Features Intersected: OAK MT RD, Facility Carried by Structure: I 65 Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.8m (87.9ft) Find on map >>
Structure Number: 12121, Location: I65 AT OAK MT. RD. (Lat: 33.328889, Lng: -86.806111), Route carried "under" structure: County highway , Year Built: 1979, Structure Length: 6.92m (22.70ft), Average Daily Traffic: 1,100 (year 2002), Truck Traffic: 14%, Features Intersected: OAK MT. RD., Facility Carried by Structure: I 65 Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 0.001, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.8m (87.9ft) Discuss this city on our hugely popular Alabama forum Back to: Pelham, AL, Alabama, All US cities.
|
![]() |