Number of bridges: 31
Total length: 148 meters (486ft)
Total costs: $35,644,000
Total average daily traffic: 467,200
Total average daily truck traffic: 63,242
National Bridge Inventory (NBI) Registered Bridges for Pelham

New bridges - Historical Statistics

  • 1920-1929: 2
  • 1930-1939: 0
  • 1940-1949: 1
  • 1950-1959: 4
  • 1960-1969: 0
  • 1970-1979: 11
  • 1980-1989: 4
  • 1990-1999: 5
  • 2000-2009: 4

Reconstructed bridges - Historical Statistics

  • 1940-1949: 2
  • 1950-1959: 0
  • 1960-1969: 0
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 1
  • 2000-2009: 1

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 2091,  Location: @ CO RD 52 (Lat: 33.267778,  Lng: -86.810556),  Route carried "on" structure: US 31,  Year Built: 1924,  Year Reconstructed: 1940,  Status: Open,  Structure Length: 14.30m (46.92ft),  Average Daily Traffic: 17,920 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 18,403 (year 2027),  Design Load: H 15,  Features Intersected: PEAVINE CK & ACL RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 412.962,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 9.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 6.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 15.09m (49.51ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2006,  Other Special Inspection Date: January 2008,  Bridge Improvement Cost: $2,084,000,  Roadway Improvement Cost: $208,000,  Total Project Cost: $3,126,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 2092,  Location: .1 MI. SO. AL 119 (Lat: 33.339167,  Lng: -86.802500),  Route carried "on" structure: US 31,  Year Built: 1924,  Year Reconstructed: 1940,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 17,920 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 18,332 (year 2027),  Design Load: H 15,  Features Intersected: CAHABA VALLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 419.099,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.81m (15.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $771,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $1,156,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 3267,  Location: .4 MI. W JCT ST RT 31 (Lat: 33.283333,  Lng: -86.800000),  Route carried "on" structure: County highway 52,  Year Built: 1948,  Status: Posted for load,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 20,740 (year 2006),  Truck Traffic: 20%,  Average Future Daily Traffic: 29,033 (year 2026),  Design Load: H 15,  Features Intersected: BUCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.95m (12.96ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2006,  Other Special Inspection Date: June 2007,  Bridge Improvement Cost: $439,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $659,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 3619,  Location: OAK MTN. STATE PARK (Lat: 33.366667,  Lng: -86.733333),  Route carried "on" structure: Alternate State lands road ,  Year Built: 1950,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 2,100 (year 2000),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,500 (year 2025),  Design Load: HS 20,  Features Intersected: SPILLWAY,  Facility Carried by Structure: VALLEY DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.999,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $217,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $326,000 ( Estimate for 2008),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 5097,  Location: @ CO RD 52 (Lat: 33.278889,  Lng: -86.823056),  Route carried "on" structure: US 31,  Year Built: 1955,  Status: Open,  Structure Length: 13.01m (42.68ft),  Average Daily Traffic: 17,920 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 18,403 (year 2027),  Design Load: HS 20,  Features Intersected: PEAVINE CK & ACL RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 413.447,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 9 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.82m (45.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,690,000,  Roadway Improvement Cost: $169,000,  Total Project Cost: $2,535,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 5098,  Location: .1 MI.SO.AL 119 (Lat: 33.323333,  Lng: -86.805278),  Route carried "on" structure: US 31,  Year Built: 1955,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 17,920 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 18,332 (year 2027),  Design Load: HS 20,  Features Intersected: CAHABA VALLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 418.986,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.78m (15.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $876,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 11382,  Location: CHANDLAR RD & CHANDLAR LN (Lat: 33.283333,  Lng: -86.783333),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Posted for load,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 2,115 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,200 (year 2028),  Design Load: H 15,  Features Intersected: BISHOP CREEK,  Facility Carried by Structure: CHANDLAR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Fair,  Operating Rating: 10.9 metric tons,  Inventory Rating: 7.2 metric tons,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.11m (16.77ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $566,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $849,000 ( Estimate for 2008),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 12033,  Location: 0.8 MI E OF PELHAM (Lat: 33.266667,  Lng: -86.783333),  Route carried "on" structure: County highway 52,  Year Built: 1978,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 10,221 (year 2007),  Truck Traffic: 20%,  Average Future Daily Traffic: 14,309 (year 2027),  Design Load: HS 20,  Features Intersected: HOGPEN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 90.8 metric tons,  Inventory Rating: 90.8 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $1,218,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,827,000 ( Estimate for 2008)
Find on map >>

Structure Number: 12117,  Location: I65 & HOGPEN CK (Lat: 33.285000,  Lng: -86.789167),  Route carried "on" structure: Interstate 65,  Year Built: 1979,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 69,180 (year 2007),  Truck Traffic: 17%,  Average Future Daily Traffic: 72,293 (year 2027),  Design Load: HS 20,  Features Intersected: HOGPEN CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 388.813,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $3,071,000,  Roadway Improvement Cost: $307,000,  Total Project Cost: $4,606,000 ( Estimate for 2008),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 12118,  Location: CO RD 52 & I65 (Lat: 33.286111,  Lng: -86.824444),  Route carried "on" structure: County highway ,  Year Built: 1979,  Status: Open,  Structure Length: 11.83m (38.81ft),  Average Daily Traffic: 8,500 (year 2002),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,900 (year 2022),  Design Load: HS 20,  Features Intersected: I65*,  Facility Carried by Structure: CO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 1,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.68m (41.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $2,366,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $3,549,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 12119,  Location: I 65 & CO RD 33 (Lat: 33.324722,  Lng: -86.806667),  Route carried "on" structure: County highway 33,  Year Built: 1979,  Status: Open,  Structure Length: 13.35m (43.80ft),  Average Daily Traffic: 1,200 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,300 (year 2026),  Design Load: HS 20,  Features Intersected: I 65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 60.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 14.16m (46.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $2,642,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $3,963,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1212,  Location: I 65 & OAK MT RD (Lat: 33.325833,  Lng: -86.795833),  Route carried "on" structure: Interstate 65,  Year Built: 1979,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 41,070 (year 2007),  Truck Traffic: 16%,  Average Future Daily Traffic: 42,959 (year 2028),  Design Load: HS 20,  Features Intersected: CO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 393.646,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 6 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.10m (26.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $1,350,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $2,025,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 12121,  Location: OAK MT RD & I 65 (Lat: 33.328889,  Lng: -86.806111),  Route carried "on" structure: Interstate 65,  Year Built: 1979,  Status: Open,  Structure Length: 6.92m (22.70ft),  Average Daily Traffic: 41,070 (year 2007),  Truck Traffic: 16%,  Average Future Daily Traffic: 42,959 (year 2028),  Design Load: HS 20,  Features Intersected: OAK MOUNTIAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 393.646,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 6 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 47.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.94m (26.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $1,324,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,986,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 14928,  Location: .2MI E JCT CO 35 (Lat: 33.283333,  Lng: -86.783333),  Route carried "on" structure: County highway 72,  Year Built: 1989,  Status: Open,  Structure Length: 0.80m (2.62ft),  Average Daily Traffic: 769 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,640 (year 2027),  Design Load: HS 20,  Features Intersected: PEAVINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 89.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.45m (4.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $151,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $226,000 ( Estimate for 2008)
Find on map >>

Structure Number: 17091,  Location: 0.4MI N JCT US 31 (Lat: 33.300000,  Lng: -86.800000),  Route carried "on" structure: County highway 105,  Year Built: 1998,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 7,888 (year 2006),  Average Future Daily Traffic: 11,043 (year 2026),  Design Load: HS 20,  Features Intersected: CAHABA VALLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 32.3 metric tons,  Inventory Rating: 32.3 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.11m (16.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $912,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,368,000 ( Estimate for 2008),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 17681,  Location: JCT FRONTIER DR (Lat: 33.266667,  Lng: -86.766667),  Route carried "on" structure: City street ,  Year Built: 1959,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 4,300 (year 2004),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,600 (year 2026),  Features Intersected: BISHOP CREEK,  Facility Carried by Structure: CROSSCREEK TRAIL
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.0m (3.3ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.82m (22.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $943,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,414,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 19877,  Location: 0.15 MI SE EXIT 242 I-65 (Lat: 33.266667,  Lng: -86.783333),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 7,500 (year 2005),  Average Future Daily Traffic: 7,500 (year 2028),  Design Load: HS 20,  Features Intersected: HOGPEN CREEK,  Facility Carried by Structure: MCCAIN PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $383,000 ( Estimate for 2008)
Find on map >>

Structure Number: 19878,  Location: 0.1 MI E OF CR 33 (Lat: 33.283333,  Lng: -86.800000),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,650 (year 2005),  Average Future Daily Traffic: 1,650 (year 2028),  Design Load: HS 20,  Features Intersected: COALES BRANCH,  Facility Carried by Structure: COMMERCE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.4m (27.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $177,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $266,000 ( Estimate for 2008)
Find on map >>

Structure Number: 19879,  Location: @ JCT W/ COMMERCE DRIVE (Lat: 33.283333,  Lng: -86.800000),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 800 (year 2005),  Average Future Daily Traffic: 800 (year 2028),  Design Load: HS 20,  Features Intersected: COALES BRANCH,  Facility Carried by Structure: COMMERCE CIRCLE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.4m (27.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $177,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $266,000 ( Estimate for 2008)
Find on map >>

Structure Number: 1988,  Location: 0.1 MI NW JCT K. CREST LN (Lat: 33.266667,  Lng: -86.766667),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 2,230 (year 2005),  Average Future Daily Traffic: 2,230 (year 2028),  Design Load: HS 20,  Features Intersected: PEAVINE CREEK,  Facility Carried by Structure: WEATHERLY WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.97m (6.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $384,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $576,000 ( Estimate for 2008)
Find on map >>

Structure Number: 19881,  Location: 0.4 MI E JCT CR332/CSX RR (Lat: 33.266667,  Lng: -86.750000),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 620 (year 2005),  Average Future Daily Traffic: 620 (year 2028),  Design Load: HS 20,  Features Intersected: PEAVINE CREEK,  Facility Carried by Structure: WEATHERLY WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $320,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $480,000 ( Estimate for 2008)
Find on map >>

Structure Number: 19882,  Location: 0.25 MI E OF JCT CR35 (Lat: 33.283333,  Lng: -86.783333),  Route carried "on" structure: City street ,  Year Built: 1992,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 175 (year 2005),  Average Future Daily Traffic: 175 (year 2028),  Design Load: HS 20,  Features Intersected: HOGPEN CREEK,  Facility Carried by Structure: BROOKSHIRE LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $170,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $255,000 ( Estimate for 2008)
Find on map >>

Structure Number: 19883,  Location: 0.1 MI. E OF CR 33 (Lat: 33.283333,  Lng: -86.800000),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,210 (year 2005),  Average Future Daily Traffic: 1,210 (year 2028),  Design Load: HS 20,  Features Intersected: COALES BRANCH,  Facility Carried by Structure: HIDDEN CREEK PKWY.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $295,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $443,000 ( Estimate for 2008)
Find on map >>

Structure Number: 19884,  Location: WEST OF FIRE STATION # 5 (Lat: 33.250000,  Lng: -86.733333),  Route carried "on" structure: City street ,  Year Built: 2003,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 101 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 150 (year 2028),  Design Load: HS 20,  Features Intersected: S. FORK YELLOWLEAF CREEK,  Facility Carried by Structure: BALLANTRAE CLUB DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $268,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $402,000 ( Estimate for 2008)
Find on map >>

Structure Number: 19885,  Location: NE QUADRANT GOLF COURSE (Lat: 33.250000,  Lng: -86.750000),  Route carried "on" structure: City street ,  Year Built: 2003,  Status: Open,  Structure Length: 1.51m (4.95ft),  Average Daily Traffic: 101 (year 2005),  Average Future Daily Traffic: 150 (year 2026),  Design Load: HS 20,  Features Intersected: SPILLWAY FOR LAKE,  Facility Carried by Structure: KILKERRAN LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.18m (7.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $382,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $573,000 ( Estimate for 2008)
Find on map >>

Structure Number: 19888,  Location: 0.25 MI. W OF JCT US 31 (Lat: 33.266667,  Lng: -86.800000),  Route carried "on" structure: City street ,  Year Built: 2003,  Status: Open,  Structure Length: 2.17m (7.12ft),  Average Daily Traffic: 5,450 (year 2002),  Average Future Daily Traffic: 7,457 (year 2027),  Design Load: HS 20,  Features Intersected: BUCK CREEK,  Facility Carried by Structure: STONEHAVEN TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.96m (9.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $462,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $693,000 ( Estimate for 2008)
Find on map >>

Structure Number: 19898,  Location: 0.2 MILE FROM CR 11 (Lat: 33.300000,  Lng: -86.716667),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 3.53m (11.58ft),  Average Daily Traffic: 50 (year 2007),  Average Future Daily Traffic: 70 (year 2027),  Design Load: HS 20,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: SUBDIVISION ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.3m (115.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.42m (14.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $544,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $816,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 12118,  Location: I65 & CO RD 52 (Lat: 33.286111,  Lng: -86.824444),  Route carried "under" structure: Interstate 65,  Year Built: 1979,  Structure Length: 11.83m (38.81ft),  Average Daily Traffic: 82,140 (year 2007),  Truck Traffic: 16%,  Features Intersected: I-65,  Facility Carried by Structure: CO RD
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 389.344,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>

Structure Number: 12119,  Location: I65 & CO RD 33 (Lat: 33.324722,  Lng: -86.806667),  Route carried "under" structure: Interstate 65,  Year Built: 1979,  Structure Length: 13.35m (43.80ft),  Average Daily Traffic: 82,140 (year 2007),  Truck Traffic: 16%,  Features Intersected: I-65,  Facility Carried by Structure: CO RD 33
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 392.229,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>

Structure Number: 1212,  Location: I65 AT OAK MT. RD. (Lat: 33.325833,  Lng: -86.795833),  Route carried "under" structure: County highway ,  Year Built: 1979,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 1,100 (year 2002),  Truck Traffic: 14%,  Features Intersected: OAK MT RD,  Facility Carried by Structure: I 65
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>

Structure Number: 12121,  Location: I65 AT OAK MT. RD. (Lat: 33.328889,  Lng: -86.806111),  Route carried "under" structure: County highway ,  Year Built: 1979,  Structure Length: 6.92m (22.70ft),  Average Daily Traffic: 1,100 (year 2002),  Truck Traffic: 14%,  Features Intersected: OAK MT. RD.,  Facility Carried by Structure: I 65
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Discuss this city on our hugely popular Alabama forum

Back to: Pelham, AL, Alabama, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.