Bridge Statistics for Peru, Illinois (IL) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Peru, IL, Illinois, Illinois forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 13 Total length: 204 meters (669ft) Total costs: $2,798,000 Total average daily traffic: 154,809 Total average daily truck traffic: 35,510 National Bridge Inventory (NBI) Registered Bridges for Peru
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Find on map >>
Structure Number: 50002711345, Location: JCT US 6 & ILL 251 (Lat: 41.327481, Lng: -89.119975), Route carried "on" structure: US 6, Year Built: 1960, Year Reconstructed: 1998, Status: Open, Structure Length: 4.42m (14.50ft), Average Daily Traffic: 14,400 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 20,100 (year 2027), Design Load: HS 20, Features Intersected: ILL 251 FAP 46 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 130.683, Lanes on structure: 6, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 23.2m (76.1ft), Skew: 30 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 21.3m (69.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 23.2m (76.1ft), Out-to-Out Width: 28.0m (91.9ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Operating Rating: 59.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.42m (14.50ft), Designated Inspection Frequency: Every 48 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $879,000, Roadway Improvement Cost: $88,000, Total Project Cost: $1,319,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 50007711394, Location: JC ILL 251 & I-80 (Lat: 41.365208, Lng: -89.125664), Route carried "on" structure: State highway 251, Year Built: 1961, Status: Open, Structure Length: 6.34m (20.80ft), Average Daily Traffic: 6,350 (year 2007), Truck Traffic: 16%, Average Future Daily Traffic: 8,400 (year 2027), Design Load: HS 20, Features Intersected: I 80 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 84.296, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 18.6m (61.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.9m (35.8ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 50.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.34m (20.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2007, Bridge Improvement Cost: $149,000, Roadway Improvement Cost: $15,000, Total Project Cost: $179,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 50007811395, Location: JCT IL 251 & I-80 (Lat: 41.365200, Lng: -89.125467), Route carried "on" structure: State highway 251, Year Built: 1961, Status: Open, Structure Length: 6.34m (20.80ft), Average Daily Traffic: 6,350 (year 2007), Truck Traffic: 16%, Average Future Daily Traffic: 8,400 (year 2027), Design Load: HS 20, Features Intersected: I 80 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 84.279, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 18.6m (61.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 11.0m (36.1ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 50.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.34m (20.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2007, Bridge Improvement Cost: $150,000, Roadway Improvement Cost: $15,000, Total Project Cost: $180,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 50007911396, Location: 0.1 MI S OF US 6 (Lat: 41.324919, Lng: -89.119944), Route carried "on" structure: State highway 251, Year Built: 1958, Status: Open, Structure Length: 69.86m (229.20ft), Average Daily Traffic: 12,800 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 12,600 (year 2026), Design Load: HS 20, Features Intersected: IL RV/WATER ST/RR Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 79.903, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Navigation Control: Yes ( Vertical Clearance: 13.4m (44.0ft), Horizontal Clearance: 121.9m (399.9ft)), Material/Design: Steel continuous, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 10, Length of Maximum Span: 145.4m (477.0ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Channel: Good, Operating Rating: 54.9 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 34.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: June 2006, Critical Feature Inspection Date: June 2006, Underwater Inspection Date: May 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 50008211408, Location: 1.4 MI W. OF IL 251 (Lat: 41.364767, Lng: -89.152219), Route carried "on" structure: Other road 6097, Year Built: 1960, Status: Open, Structure Length: 7.38m (24.21ft), Average Daily Traffic: 4,000 (year 2006), Truck Traffic: 7%, Average Future Daily Traffic: 8,000 (year 2028), Design Load: HS 20, Features Intersected: I-80, Facility Carried by Structure: PLANK ROAD CH 56 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.834, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 2 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 21.7m (71.2ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 10.9m (35.8ft) Condition: Deck: Poor, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 54.0 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.38m (24.21ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2007, Bridge Improvement Cost: $665,000, Roadway Improvement Cost: $67,000, Total Project Cost: $998,000 ( Estimate for 2001), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: 5001402618, Location: 0.2 MI N OF US 6 (Lat: 41.330483, Lng: -89.119994), Route carried "on" structure: Other road 6087, Year Built: 1961, Status: Open, Structure Length: 3.52m (11.55ft), Average Daily Traffic: 2,500 (year 2006), Truck Traffic: 4%, Average Future Daily Traffic: 3,000 (year 2028), Design Load: HS 20, Features Intersected: ILL 251 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.011, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 21.7m (71.2ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 13.4m (44.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 46.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 27.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.54m (11.61ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2007, Bridge Improvement Cost: $102,000, Roadway Improvement Cost: $10,000, Total Project Cost: $122,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay Find on map >>
Structure Number: 50308011533, Location: E 209TH N 2605 (Lat: 41.312650, Lng: -89.128669), Route carried "on" structure: City street 8100, Year Built: 1932, Year Reconstructed: 1996, Status: Open, Structure Length: 8.72m (28.61ft), Average Daily Traffic: 59 (year 1984), Average Future Daily Traffic: 75 (year 2022), Features Intersected: ILL RV BACK WATER, Facility Carried by Structure: RD TO LANDFILL Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 1.239, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 5.8m (19.0ft), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 2, Length of Maximum Span: 42.4m (139.1ft), Curb-To-Curb Width: 5.5m (18.0ft), Out-to-Out Width: 5.5m (18.0ft) Condition: Deck: Very good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 36.9 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 25.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Somewhat better than minimum adequacy, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2005, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 50002711345, Location: JCT US 6 & ILL 251 (Lat: 41.327481, Lng: -89.119975), Route carried "under" structure: State highway 251, Year Built: 1960, Structure Length: 4.42m (14.50ft), Average Daily Traffic: 12,800 (year 2007), Truck Traffic: 5%, Features Intersected: ILL 251 FAP 46, Facility Carried by Structure: US 6/FAU 6088/FAP6 Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 80.048, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.3m (69.9ft) Find on map >>
Structure Number: 50007711394, Location: JC ILL 251 & I-80 (Lat: 41.365208, Lng: -89.125664), Route carried "under" structure: Interstate 80, Year Built: 1961, Structure Length: 6.34m (20.80ft), Average Daily Traffic: 27,600 (year 2007), Truck Traffic: 36%, Features Intersected: I 80, Facility Carried by Structure: ILL 251 (SB) Minimum Vertical Clearance: 0.49m (1.61ft), Kilometerpoint: 120.707, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 18.6m (61.0ft) Find on map >>
Structure Number: 50007811395, Location: JCT IL 251 & I-80 (Lat: 41.365200, Lng: -89.125467), Route carried "under" structure: Interstate 80, Year Built: 1961, Structure Length: 6.34m (20.80ft), Average Daily Traffic: 27,600 (year 2007), Truck Traffic: 36%, Features Intersected: I 80, Facility Carried by Structure: ILL 251 (NB) Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 120.723, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 18.6m (61.0ft) Find on map >>
Structure Number: 50007911396, Location: 0.1 MI S OF US 6 (Lat: 41.324919, Lng: -89.119944), Route carried "under" structure: Other road 6091, Year Built: 1958, Structure Length: 69.86m (229.20ft), Average Daily Traffic: 1,450 (year 2006), Truck Traffic: 22%, Features Intersected: IL RV/WATER ST/RR, Facility Carried by Structure: IL 251 Minimum Vertical Clearance: 12.19m (39.99ft), Kilometerpoint: 1.094, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Truss - Thru, Length of Maximum Span: 145.4m (477.0ft) Find on map >>
Structure Number: 50008211408, Location: 1.4 MI W. OF IL 251 (Lat: 41.364767, Lng: -89.152219), Route carried "under" structure: Interstate 80, Year Built: 1960, Structure Length: 7.38m (24.21ft), Average Daily Traffic: 26,800 (year 2007), Truck Traffic: 37%, Features Intersected: I-80, Facility Carried by Structure: PLANK ROAD CH 56 Minimum Vertical Clearance: 0.49m (1.61ft), Kilometerpoint: 118.487, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.7m (71.2ft) Find on map >>
Structure Number: 5001402618, Location: 0.2 MI N OF US 6 (Lat: 41.330483, Lng: -89.119994), Route carried "under" structure: State highway 251, Year Built: 1961, Structure Length: 3.52m (11.55ft), Average Daily Traffic: 12,100 (year 2007), Truck Traffic: 7%, Features Intersected: ILL 251, Facility Carried by Structure: FAU 6087 SEVENTH S Minimum Vertical Clearance: 0.46m (1.51ft), Kilometerpoint: 80.386, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.7m (71.2ft) Discuss this city on our hugely popular Illinois forum Back to: Peru, IL, Illinois, All US cities.
|
![]() |