National Bridge Inventory (NBI) Statistics
Number of bridges: 16
Total length: 32 meters (105ft)
Total costs: $9,468,000
Total average daily traffic: 13,532
Total average daily truck traffic: 1,179
National Bridge Inventory (NBI) Registered Bridges for Petersburgh

New bridges - Historical Statistics

  • 1920-1929: 3
  • 1930-1939: 3
  • 1940-1949: 5
  • 1950-1959: 0
  • 1960-1969: 0
  • 1970-1979: 0
  • 1980-1989: 2
  • 1990-1999: 3

Reconstructed bridges - Historical Statistics

  • 1970-1979: 1
  • 1980-1989: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 100025,  Location: JCT OF RTS 2 & 22 (Lat: 42.751056,  Lng: -73.346069),  Route carried "on" structure: State highway 2,  Year Built: 1931,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 3,009 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,825 (year 2026),  Features Intersected: RTE 22
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.921,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 22 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 57.6 metric tons,  Inventory Rating: 15.0 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $626,000,  Roadway Improvement Cost: $410,000,  Total Project Cost: $1,036,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 100027,  Location: IN PETERSBURG (Lat: 42.748989,  Lng: -73.339275),  Route carried "on" structure: State highway 2,  Year Built: 1931,  Status: Open,  Structure Length: 1.64m (5.38ft),  Average Daily Traffic: 912 (year 2007),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,159 (year 2027),  Features Intersected: LITTLE HOOSIC RIV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.885,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 56.4 metric tons,  Inventory Rating: 22.9 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $397,000,  Roadway Improvement Cost: $236,000,  Total Project Cost: $633,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 100028,  Location: 1.6 MI E PETERSBURG (Lat: 42.744714,  Lng: -73.310850),  Route carried "on" structure: State highway 2,  Year Built: 1926,  Status: Open,  Structure Length: 5.57m (18.27ft),  Average Daily Traffic: 912 (year 2007),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,159 (year 2027),  Features Intersected: DAYFOOT BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.923,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 24 degrees,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 48.3 metric tons,  Inventory Rating: 22.0 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 5.57m (18.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $1,171,000,  Roadway Improvement Cost: $697,000,  Total Project Cost: $1,868,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 101697,  Location: 1.2 MI N JCT 22 & 2 (Lat: 42.768936,  Lng: -73.342156),  Route carried "on" structure: State highway 22,  Year Built: 1945,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 3,890 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,945 (year 2026),  Features Intersected: DILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.611,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $246,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 104624,  Location: 0.3 MI E JCT RTS 22 & 346 (Lat: 42.822997,  Lng: -73.326892),  Route carried "on" structure: State highway 346,  Year Built: 1999,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 1,400 (year 2007),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,800 (year 2027),  Design Load: HS 25,  Features Intersected: LITTLE HOOSIC RIV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.800,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $478,000,  Roadway Improvement Cost: $285,000,  Total Project Cost: $763,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 220168,  Location: 1.0 MI NE PETERSBURG (Lat: 42.763697,  Lng: -73.337253),  Route carried "on" structure: City street ,  Year Built: 1948,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 50 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 66 ,  Features Intersected: LITTLE HOOSIC RIV,  Facility Carried by Structure: LEWIS HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.2m (13.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $157,000,  Total Project Cost: $421,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 220171,  Location: 2.1MI.N.PETERSBURG (Lat: 42.781044,  Lng: -73.335639),  Route carried "on" structure: City street ,  Year Built: 1947,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 50 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 66 ,  Features Intersected: LITTLE HOOSIC RIV,  Facility Carried by Structure: PROSSER HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.5m (14.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.0m (55.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $302,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $482,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 220172,  Location: 4.6 MI N PETERSBURG (Lat: 42.810422,  Lng: -73.333458),  Route carried "on" structure: City street ,  Year Built: 1948,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 20 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 26 ,  Features Intersected: LITTLE HOOSIC RIV,  Facility Carried by Structure: WEBSTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.3m (10.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 3.2m (10.5ft),  Out-to-Out Width: 3.6m (11.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $302,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $482,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 220173,  Location: 1.6 MI. SW OF PETERSBURG (Lat: 42.725522,  Lng: -73.366542),  Route carried "on" structure: City street ,  Year Built: 1985,  Status: Open,  Structure Length: 1.09m (3.58ft),  Average Daily Traffic: 58 (year 1997),  Truck Traffic: 5%,  Average Future Daily Traffic: 76 (year 2017),  Design Load: HS 20,  Features Intersected: LITTLE HOOSIC RIV,  Facility Carried by Structure: BRIMMER BRIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $302,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $482,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 220174,  Location: 2.2 MILES NORTH OF BERLIN (Lat: 42.731728,  Lng: -73.361589),  Route carried "on" structure: City street ,  Year Built: 1949,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 120 (year 1997),  Truck Traffic: 5%,  Average Future Daily Traffic: 157 (year 2017),  Features Intersected: LITT HOOSIC RIVER,  Facility Carried by Structure: BROKEN WHEEL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.8m (15.7ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $92,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $147,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 220176,  Location: 1.7 MI E OF PETERSBURG (Lat: 42.743794,  Lng: -73.318036),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 62 (year 1997),  Truck Traffic: 5%,  Average Future Daily Traffic: 81 (year 2017),  Features Intersected: DAYFOOT BROOK,  Facility Carried by Structure: BABCOCK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.6m (11.8ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 78.0 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $130,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $207,000 ( Estimate for 2007)
Find on map >>

Structure Number: 220186,  Location: 0.8MI.E.PETERSBURG (Lat: 42.749447,  Lng: -73.332969),  Route carried "on" structure: County highway ,  Year Built: 1927,  Status: Open,  Structure Length: 1.09m (3.58ft),  Average Daily Traffic: 49 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 64 (year 2025),  Features Intersected: DAYFOOT BROOK,  Facility Carried by Structure: DAYFOOT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.8m (15.7ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $135,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $216,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 330369,  Location: 0.5 MI S OF PETERSBURG (Lat: 42.744033,  Lng: -73.348653),  Route carried "on" structure: County highway ,  Year Built: 1923,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 191 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 251 (year 2025),  Design Load: HS 20,  Features Intersected: LITTLE HOOSIC RIV,  Facility Carried by Structure: RIVER ROAD CR.90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $270,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $431,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 33037,  Location: IN PETERSBURG (Lat: 42.750442,  Lng: -73.336428),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 2.28m (7.48ft),  Average Daily Traffic: 117 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 154 (year 2025),  Design Load: HS 20,  Features Intersected: LITTLE HOOSIC RIV,  Facility Carried by Structure: HILLS HOLLOW RO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $270,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $431,000 ( Estimate for 2007),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 330372,  Location: .6 MI NE OF N PETERSBURG (Lat: 42.826475,  Lng: -73.322078),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 4.81m (15.78ft),  Average Daily Traffic: 452 (year 1977),  Truck Traffic: 8%,  Average Future Daily Traffic: 514 (year 1997),  Design Load: HS 20,  Features Intersected: HOOSIC RIVER,  Facility Carried by Structure: COUNTY ROAD 95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.81m (15.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $1,018,000,  Roadway Improvement Cost: $605,000,  Total Project Cost: $1,623,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 100025,  Location: JCT OF RTS 2 & 22 (Lat: 42.751056,  Lng: -73.346069),  Route carried "under" structure: State highway 22,  Year Built: 1931,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 2,240 (year 2006),  Truck Traffic: 9%,  Features Intersected: RTE 22,  Facility Carried by Structure: RTE 2
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 3.004,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 12.1m (39.7ft)

Discuss this city on our hugely popular New York forum

Back to: Petersburgh, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.