Bridge Statistics for Piedmont, Alabama (AL) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Piedmont, AL, Alabama, Alabama forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 12
Total length: 36 meters (118ft)
Total costs: $9,237,000
Total average daily traffic: 38,850
Total average daily truck traffic: 3,268
Total future (year 2027) average daily traffic: 41,867
National Bridge Inventory (NBI) Registered Bridges for Piedmont

New bridges - Historical Statistics

  • 1920-1929: 2
  • 1930-1939: 3
  • 1940-1949: 1
  • 1950-1959: 4
  • 1960-1969: 0
  • 1970-1979: 2

Reconstructed bridges - Historical Statistics

  • 1940-1949: 2
  • 1950-1959: 0
  • 1960-1969: 0
  • 1970-1979: 0
  • 1980-1989: 2

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 1913,  Location: PIEDMONT (Lat: 33.916667,  Lng: -85.583333),  Route carried "on" structure: City street ,  Year Built: 1939,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 3,200 (year 2008),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,755 (year 2028),  Features Intersected: NANCES CREEK,  Facility Carried by Structure: VIGO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.599,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 14.5 metric tons,  Inventory Rating: 10.9 metric tons,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $480,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $720,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 3408,  Location: 0.7 MI N JCT US 78 (Lat: 33.933333,  Lng: -85.600000),  Route carried "on" structure: State highway 9,  Year Built: 1949,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 5,090 (year 2007),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,140 (year 2027),  Design Load: H 15,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 389.669,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.19m (20.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $661,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $991,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 3951,  Location: 1.7 MI S JCT SR 200 (Lat: 33.900000,  Lng: -85.650000),  Route carried "on" structure: State highway 21,  Year Built: 1925,  Year Reconstructed: 1951,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 5,540 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,623 (year 2027),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 445.297,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 22.7 metric tons,  Inventory Rating: 17.1 metric tons,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $371,000 ( Estimate for 2008)
Find on map >>

Structure Number: 3952,  Location: 0.1 MI S JCT SR 200 (Lat: 33.900000,  Lng: -85.616667),  Route carried "on" structure: State highway 21,  Year Built: 1925,  Year Reconstructed: 1951,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 5,990 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,019 (year 2027),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 448.035,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 22.7 metric tons,  Inventory Rating: 17.1 metric tons,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $189,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $284,000 ( Estimate for 2008)
Find on map >>

Structure Number: 51,  Location: PIEDMONT (Lat: 33.650000,  Lng: -85.916667),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 700 (year 2008),  Truck Traffic: 15%,  Average Future Daily Traffic: 900 (year 2028),  Design Load: H 15,  Features Intersected: CREEK,  Facility Carried by Structure: OLD GADSDEN HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.399,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.9m (19.4ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 14.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $179,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $269,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 6665,  Location: 0.2 MI E JCT SR 200 (Lat: 33.916667,  Lng: -85.616667),  Route carried "on" structure: US 278,  Year Built: 1959,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 9,170 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 9,390 (year 2027),  Design Load: H 20,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 250.947,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 30.8 metric tons,  Inventory Rating: 22.7 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.33m (7.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $953,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,429,000 ( Estimate for 2008)
Find on map >>

Structure Number: 6724,  Location: CITY OF PIEDMONT (Lat: 33.916667,  Lng: -85.616667),  Route carried "on" structure: State highway 200,  Year Built: 1959,  Status: Open,  Structure Length: 10.12m (33.20ft),  Average Daily Traffic: 3,630 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,655 (year 2027),  Design Load: HS 20,  Features Intersected: PED./BICYCLE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 11.03m (36.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $1,349,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $2,024,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 6725,  Location: CITY OF PIEDMONT (Lat: 33.916667,  Lng: -85.616667),  Route carried "on" structure: State highway 200,  Year Built: 1959,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 3,630 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,655 (year 2027),  Design Load: HS 20,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.51m (8.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $641,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $961,000 ( Estimate for 2008)
Find on map >>

Structure Number: 1026,  Location: PIEDMONT (Lat: 33.916667,  Lng: -85.633333),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 0.83m (2.72ft),  Average Daily Traffic: 500 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 650 (year 2028),  Design Load: H 15,  Features Intersected: CREEK,  Facility Carried by Structure: W ALABAMA ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.299,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 22.7 metric tons,  Inventory Rating: 17.1 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.48m (4.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $146,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $219,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 11407,  Location: PIEDMONT (Lat: 33.933333,  Lng: -85.583333),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 6.80m (22.31ft),  Average Daily Traffic: 800 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,188 (year 2028),  Design Load: H 15,  Features Intersected: NANCES CREEK,  Facility Carried by Structure: N CK INDUST PK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Number Of Approach Spans: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 22.7 metric tons,  Inventory Rating: 17.1 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 7.83m (25.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $989,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $1,484,000 ( Estimate for 2008),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 14691,  Location: PIEDMONT (Lat: 33.933333,  Lng: -85.600000),  Route carried "on" structure: City street ,  Year Built: 1932,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 300 (year 2008),  Truck Traffic: 5%,  Average Future Daily Traffic: 446 (year 2028),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: OLD CENTRE HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.0m (16.4ft),  Material/Design: Steel,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 18.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $199,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $299,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 14692,  Location: PIEDMONT (Lat: 33.933333,  Lng: -85.616667),  Route carried "on" structure: City street ,  Year Built: 1932,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 300 (year 2008),  Truck Traffic: 5%,  Average Future Daily Traffic: 446 (year 2028),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: OLD CENTRE HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.399,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.1m (16.7ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $124,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $186,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular Alabama forum