Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Pine Grove, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 174ft / 53.3mTotal length
  • $8,327,000Total costs
  • 111,174Total average daily traffic
  • 22,208Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pine Grove
  • No street view available for this location

New bridges in Pine Grove, PA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 31930-1939
  • 11950-1959
  • 81960-1969
  • 11990-1999
  • 22000-2009
  • 12010-2019
Reconstructed bridges in Pine Grove, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31990-1999
  • 42000-2009
Average Bridge Daily Traffic in Pine Grove, PA
Average Bridge Truck Traffic in Pine Grove, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Good
  • 50.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 23.1%Good
  • 30.8%Satisfactory
  • 30.8%Fair
  • 7.7%Poor
  • 7.7%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.7%Very good
  • 15.4%Good
  • 46.2%Satisfactory
  • 15.4%Fair
  • 15.4%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Good
  • 16.7%Satisfactory
  • 25.0%Fair
  • 41.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 31,  Location: E OF YORK SPRINGS (Lat: 40.000975,  Lng: -77.105742),  Route carried "on" structure: US 15,  Year Built: 1957,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 17,930 (year 2021),  Truck Traffic: 21%,  Average Future Daily Traffic: 24,080 (year 2032),  Design Load: HS 20,  Features Intersected: PA 94; SR 0094
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.934,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 25.8m (84.6ft),  Out-to-Out Width: 26.7m (87.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $127,000,  Roadway Improvement Cost: $375,000,  Total Project Cost: $1,717,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 30551,  Location: 0.5 MI. S. EXIT 100 (31) (Lat: 40.526658,  Lng: -76.433369),  Route carried "on" structure: Interstate 81,  Year Built: 1968,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 14,294 (year 2021),  Truck Traffic: 27%,  Average Future Daily Traffic: 21,335 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SWATARA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.586,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.70m (28.54ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $111,000,  Roadway Improvement Cost: $326,000,  Total Project Cost: $1,495,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 30552,  Location: 0.5 MI. S. EXIT 100 (31) (Lat: 40.526894,  Lng: -76.434153),  Route carried "on" structure: Interstate 81,  Year Built: 1968,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 14,230 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 17,705 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SWATARA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.478,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.70m (28.54ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $111,000,  Roadway Improvement Cost: $326,000,  Total Project Cost: $1,495,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 30553,  Location: EXIT 100 (31) (Lat: 40.534306,  Lng: -76.428658),  Route carried "on" structure: Interstate 81,  Year Built: 1968,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 12,745 (year 2021),  Truck Traffic: 37%,  Average Future Daily Traffic: 21,335 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: PA 443 (LR 140)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.394,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $50,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $673,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 30554,  Location: EXIT 100 ( 31) (Lat: 40.534117,  Lng: -76.429203),  Route carried "on" structure: Interstate 81,  Year Built: 1968,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 14,230 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 17,705 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: PA 443 (LR 140)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.297,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $110,000,  Roadway Improvement Cost: $324,000,  Total Project Cost: $1,485,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 30683,  Location: AT I-81 INTERCHANGE (Lat: 40.534681,  Lng: -76.427036),  Route carried "on" structure: State highway 443,  Year Built: 1968,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 6,173 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,021 (year 2032),  Design Load: HS 20,  Features Intersected: TRIB. TO SWATARA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.277,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 15.4m (50.5ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2019,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 30684,  Location: EAST SIDE OF PINE GROVE (Lat: 40.554536,  Lng: -76.381744),  Route carried "on" structure: State highway 443,  Year Built: 1968,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 6,340 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,946 (year 2032),  Design Load: HS 20,  Features Intersected: SWATARA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.495,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 30706,  Location: PINE GROVE BORO LINE (Lat: 40.543281,  Lng: -76.382897),  Route carried "on" structure: State highway 895,  Year Built: 1934,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 3,277 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,196 (year 2032),  Features Intersected: SWATARA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2019,  Bridge Improvement Cost: $19,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $260,000
Find on map >>   Show street view

Structure Number: 30922,  Location: S.OF SR 895,E.OF SR 501 (Lat: 40.540094,  Lng: -76.357028),  Route carried "on" structure: City street ,  Year Built: 1932,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 150 (year 1980),  Truck Traffic: 1%,  Average Future Daily Traffic: 150 (year 2000),  Design Load: HS 20,  Features Intersected: LOW. LIT. SWATARA CREEK,  Facility Carried by Structure: T-654 CAMP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $65,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 30953,  Location: 0.1 MI SOUTH OF SR 895 (Lat: 40.544097,  Lng: -76.325561),  Route carried "on" structure: City street ,  Year Built: 1860,  Year Reconstructed: 1997,  Status: Posted for load,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 50 (year 1980),  Average Future Daily Traffic: 250 (year 2030),  Design Load: H 10,  Features Intersected: LOWER LITTLE SWATARA CR,  Facility Carried by Structure: COVERED BRIDGE RD
Minimum Vertical Clearance: 2.90m (9.51ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 3.5m (11.5ft),  Out-to-Out Width: 4.4m (14.4ft)

Condition: Deck: Satisfactory,  Superstructure: Serious,  Substructure: Fair,  Channel: Poor,  Operating Rating: 14.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: April 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $19,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $257,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 31,  Location: E MILL ST. IN PINE GROVE (Lat: 40.548822,  Lng: -76.379803),  Route carried "on" structure: City street ,  Year Built: 1939,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 300 (year 1980),  Average Future Daily Traffic: 420 (year 2000),  Design Load: HS 25 or greater,  Features Intersected: SWATARA CREEK,  Facility Carried by Structure: E MILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Poor,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.40m (17.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $65,000,  Roadway Improvement Cost: $192,000,  Total Project Cost: $880,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 40602,  Location: 0.2 MI. S. OF MARSTOWN (Lat: 40.537197,  Lng: -76.378011),  Route carried "on" structure: State highway 501,  Year Built: 1999,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 3,830 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,402 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: LITTLE SWATARA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.867,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41282,  Location: W.OF SR 645,S.OF SR 443 (Lat: 40.520933,  Lng: -76.391336),  Route carried "on" structure: City street ,  Year Built: 2001,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 2,000 (year 2018),  Average Future Daily Traffic: 2,440 (year 2038),  Design Load: HL 93,  Features Intersected: SWOPE VALLEY RUN,  Facility Carried by Structure: T-649 SWOPE VAL.RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 48266,  Location: SOUTH OF PINE GROVE (Lat: 40.537039,  Lng: -76.389133),  Route carried "on" structure: State highway 645,  Year Built: 2013,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 3,229 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,155 (year 2039),  Design Load: HL 93,  Features Intersected: SWATARA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.404,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 56928,  Location: 0.3 MI W OF PA645 (Lat: 40.533500,  Lng: -76.393833),  Route carried "on" structure: City street ,  Year Built: 2009,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 50 (year 2020),  Average Future Daily Traffic: 75 (year 2040),  Design Load: HL 93,  Features Intersected: Swopes Valley Run,  Facility Carried by Structure: Roberts Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 30553,  Location: EXIT 100 (31) (Lat: 40.534306,  Lng: -76.428658),  Route carried "under" structure: State highway 443,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 6,173 (year 2020),  Truck Traffic: 8%,  Features Intersected: PA 443 (LR 140),  Facility Carried by Structure: I-81NB (LR1005)
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 5.277,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 14.9m (48.9ft)

Find on map >>   Show street view

Structure Number: 30554,  Location: EXIT 100 ( 31) (Lat: 40.534117,  Lng: -76.429203),  Route carried "under" structure: State highway 443,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 6,173 (year 2020),  Truck Traffic: 8%,  Features Intersected: PA 443 (LR 140),  Facility Carried by Structure: I-81 SB (LR 1005)
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 5.277,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 16.2m (53.1ft)

Discuss Pine Grove, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.