U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Plymouth, Wisconsin (WI) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Plymouth, WI, Wisconsin, Wisconsin forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 13
Total length: 71 meters (233ft)
Total costs: $4,289,000
Total average daily traffic: 65,627
Total average daily truck traffic: 1,224
National Bridge Inventory (NBI) Registered Bridges for Plymouth

New bridges - Historical Statistics

  • 1900-1909: 2
  • 1910-1919: 0
  • 1920-1929: 1
  • 1930-1939: 0
  • 1940-1949: 0
  • 1950-1959: 0
  • 1960-1969: 0
  • 1970-1979: 2
  • 1980-1989: 1
  • 1990-1999: 1
  • 2000-2009: 6

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Find on map >>

Structure Number: B590085,  Location: 0.4M E JCT STH 67 TO N (Lat: 43.746667,  Lng: -87.971667),  Route carried "on" structure: County highway ,  Year Built: 1976,  Status: Open,  Structure Length: 1.51m (4.95ft),  Average Daily Traffic: 16,040 (year 2005),  Average Future Daily Traffic: 17,644 (year 2026),  Design Load: HS 20,  Features Intersected: MULLET RIVER,  Facility Carried by Structure: CTH Eastern Ave.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: B590112,  Location: 0.1M W JCT STH 67,  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 1.32m (4.33ft),  Average Daily Traffic: 400 (year 2005),  Average Future Daily Traffic: 440 (year 2026),  Design Load: H 20,  Features Intersected: MULLET RIVER,  Facility Carried by Structure: LRD FREDERICK ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.6m (41.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: B590138,  Location: 1.0M N JCT CTH PP,  Route carried "on" structure: State highway 67,  Year Built: 1990,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 4,069 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,250 (year 2023),  Design Load: HS 20,  Features Intersected: MULLET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 66.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: B590179,  Location: AT STH 23 (Lat: 43.761650,  Lng: -88.001983),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 8.35m (27.40ft),  Average Daily Traffic: 8,000 (year 2005),  Average Future Daily Traffic: 9,100 (year 2024),  Design Load: HS 20,  Features Intersected: STH 23,  Facility Carried by Structure: CTH C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 22.2m (72.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.78m (28.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $1,403,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $2,105,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: B59018,  Location: 0.8M W JCT STH 67 (Lat: 43.761944,  Lng: -87.991617),  Route carried "on" structure: State highway 23,  Year Built: 2004,  Status: Open,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 1,500 (year 2005),  Average Future Daily Traffic: 19,400 (year 2024),  Design Load: HS 20,  Features Intersected: WIS CENTRAL RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $1,126,000,  Roadway Improvement Cost: $112,000,  Total Project Cost: $1,689,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: B590309,  Location: 0.5M W JCT CTH OJ (Lat: 43.761250,  Lng: -87.980131),  Route carried "on" structure: State highway 23,  Year Built: 2004,  Status: Open,  Structure Length: 12.16m (39.90ft),  Average Daily Traffic: 15,000 (year 2004),  Average Future Daily Traffic: 20,800 (year 2024),  Design Load: HS 20,  Features Intersected: STH 67
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 40.2m (131.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 76.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: P590105,  Location: 0.1M S JCT CTH O,  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 120 (year 2005),  Average Future Daily Traffic: 132 (year 2025),  Features Intersected: MULLET RIVER,  Facility Carried by Structure: LRD SHORT CUT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Serious,  Substructure: Good,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2006,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $175,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: P590707,  Location: 0.1M S JCT CTH C,  Route carried "on" structure: City street ,  Year Built: 1920,  Status: Open,  Structure Length: 1.05m (3.44ft),  Average Daily Traffic: 2,500 (year 2005),  Average Future Daily Traffic: 2,750 (year 2026),  Design Load: H 20,  Features Intersected: MULLET RIVER,  Facility Carried by Structure: LRD S STAFFORD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.6m (31.5ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $213,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $320,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: B590179,  Route carried "under" structure: State highway ,  Year Built: 2005,  Structure Length: 8.35m (27.40ft),  Average Daily Traffic: 8,000 (year 2005),  Features Intersected: STH 23,  Facility Carried by Structure: CTH C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>

Structure Number: B59018,  Route carried "under" structure: Other road ,  Year Built: 2004,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 99 (year 2005),  Features Intersected: WIS CENTRAL RR,  Facility Carried by Structure: STH 23 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>

Structure Number: B590268,  Location: 1.1M N JCT CTH PP (Lat: 43.746667,  Lng: -87.980000),  Route carried "under" structure: State highway 67,  Year Built: 1907,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 4,900 (year 2005),  Truck Traffic: 10%,  Features Intersected: STH 67-MILL ST,  Facility Carried by Structure: CMSTPP RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>

Structure Number: B590269,  Location: 1.2M N JCT CTH PP (Lat: 43.746667,  Lng: -87.980000),  Route carried "under" structure: State highway 67,  Year Built: 1907,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 4,900 (year 2005),  Truck Traffic: 10%,  Features Intersected: STH 67-MILL ST,  Facility Carried by Structure: CNW RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>

Structure Number: B590309,  Route carried "under" structure: State highway 67,  Year Built: 2004,  Structure Length: 12.16m (39.90ft),  Average Daily Traffic: 99 (year 2005),  Features Intersected: STH 67,  Facility Carried by Structure: STH 23
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.2m (131.9ft)

Discuss this city on our hugely popular Wisconsin forum

Back to: Plymouth, WI, Wisconsin, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.