National Bridge Inventory (NBI) Statistics
Number of bridges: 13
Total length: 18 meters (59ft)
Total costs: $26,000
Total average daily traffic: 49,475
Total average daily truck traffic: 1,909
Total future (year 2026) average daily traffic: 24,738
National Bridge Inventory (NBI) Registered Bridges for Pomfret

New bridges - Historical Statistics

  • 1900-1909: 3
  • 1910-1919: 0
  • 1920-1929: 2
  • 1930-1939: 3
  • 1940-1949: 2
  • 1950-1959: 2
  • 1960-1969: 0
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 1

Reconstructed bridges - Historical Statistics

  • 1950-1959: 1
  • 1960-1969: 1
  • 1970-1979: 0
  • 1980-1989: 4
  • 1990-1999: 0
  • 2000-2009: 2

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 987,  Location: 0.4 MILE EAST OF ROUTE 97 (Lat: 41.855000,  Lng: -71.998333),  Route carried "on" structure: US 44,  Year Built: 1942,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 6,600 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,300 (year 2026),  Design Load: H 20,  Features Intersected: ABINGTON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 147.787,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 988,  Location: 0.9 MI WEST OF ROUTE 101 (Lat: 41.865000,  Lng: -71.983333),  Route carried "on" structure: US 44,  Year Built: 1941,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 6,600 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,300 (year 2026),  Design Load: HS 20,  Features Intersected: MASHAMOQUET BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 149.154,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 99,  Location: 0.14 MILE NORTH OF SR 644 (Lat: 41.881667,  Lng: -71.961667),  Route carried "on" structure: US 44,  Year Built: 1933,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 5,200 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,600 (year 2026),  Features Intersected: WAPPOQUIA BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 152.083,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1295,  Location: .3 MI WEST OF RTE 169 (Lat: 41.865000,  Lng: -71.963333),  Route carried "on" structure: State highway 101,  Year Built: 1929,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 7,600 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,800 (year 2026),  Design Load: H 15,  Features Intersected: MASHAMOQUET BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 63.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 1296,  Location: 1.7 MILES EAST OF RTE 169 (Lat: 41.848333,  Lng: -71.930000),  Route carried "on" structure: State highway 101,  Year Built: 1932,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 8,000 (year 2006),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,000 (year 2026),  Design Load: H 20,  Features Intersected: WHITE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.411,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 63.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 1297,  Location: AT KILLINGLY TOWN LINE (Lat: 41.846667,  Lng: -71.921667),  Route carried "on" structure: State highway 101,  Year Built: 1957,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 8,000 (year 2006),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,000 (year 2026),  Design Load: HS 20,  Features Intersected: QUINEBAUG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.151,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Underwater Inspection Date: December 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 2594,  Location: 1 MILE NORTH OF ROUTE 44 (Lat: 41.873333,  Lng: -71.998333),  Route carried "on" structure: State highway 97,  Year Built: 1924,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,600 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 800 (year 2026),  Design Load: H 15,  Features Intersected: MASHAMOQUET BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.496,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 5344,  Location: .5 MI SOUTH OF ROUTE 101 (Lat: 41.860000,  Lng: -71.966667),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1955,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 100 (year 1992),  Average Future Daily Traffic: 50 (year 2026),  Features Intersected: MASHAMOQUET BROOK,  Facility Carried by Structure: WOLF DEN DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 33.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 535,  Location: 800' NORTH OF ROUTE 101 (Lat: 41.865000,  Lng: -71.955000),  Route carried "on" structure: City street ,  Year Built: 1950,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 15 (year 1992),  Truck Traffic: 7%,  Average Future Daily Traffic: 8 (year 2026),  Design Load: HS 20,  Features Intersected: MASHAMOQUET BROOK,  Facility Carried by Structure: BOSWORTH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 59.855,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 67.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 5351,  Location: .2 MI NORTH OF ROUTE 101 (Lat: 41.860000,  Lng: -72.936667),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 850 (year 2001),  Truck Traffic: 2%,  Average Future Daily Traffic: 425 (year 2026),  Design Load: HS 20,  Features Intersected: MASHAMOQUET BROOK,  Facility Carried by Structure: WRIGHTS CROSSING R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 56.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 5422,  Location: 0.2 MILE NORTH OF RTE 101 (Lat: 41.861667,  Lng: -71.958333),  Route carried "on" structure: State highway 169,  Year Built: 1936,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 4,500 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,250 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: MASHAMOQUET BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.367,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 63.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Other Special Inspection Date: March 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 5663,  Location: 0.4 MI SOUTH OF ROUTE 97 (Lat: 41.880000,  Lng: -71.993333),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1960,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 110 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 55 (year 2026),  Features Intersected: BROOK,  Facility Carried by Structure: COVELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 14.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 5664,  Location: .5 MI NORTH OF ROUTE 97 (Lat: 41.870000,  Lng: -72.008333),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1992,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 300 (year 1992),  Truck Traffic: 7%,  Average Future Daily Traffic: 150 (year 2026),  Features Intersected: MASHAMOQUET BROOK,  Facility Carried by Structure: TAFT POND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.965,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 46.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular Connecticut forum

Back to: Pomfret, CT, Connecticut, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.