National Bridge Inventory (NBI) Statistics
Number of bridges: 25
Total length: 267 meters (876ft)
Total costs: $18,715,000
Total average daily traffic: 258,358
Total average daily truck traffic: 23,639
National Bridge Inventory (NBI) Registered Bridges for Pottstown

New bridges - Historical Statistics

  • 1900-1909: 1
  • 1910-1919: 0
  • 1920-1929: 3
  • 1930-1939: 1
  • 1940-1949: 0
  • 1950-1959: 14
  • 1960-1969: 4
  • 1970-1979: 2

Reconstructed bridges - Historical Statistics

  • 1950-1959: 1
  • 1960-1969: 1
  • 1970-1979: 2
  • 1980-1989: 2

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 460100001,  Location: .5 MILES N.OF 422 11D11 (Lat: 40.241306,  Lng: -75.659128),  Route carried "on" structure: State highway 100,  Year Built: 1954,  Year Reconstructed: 1973,  Status: Open,  Structure Length: 24.90m (81.69ft),  Average Daily Traffic: 31,799 (year 2008),  Truck Traffic: 11%,  Average Future Daily Traffic: 17,433 (year 2013),  Design Load: H 15,  Features Intersected: SCHUYLKILL RIVER;ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 34 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 56.4m (185.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 25.39m (83.30ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: April 2007,  Underwater Inspection Date: April 2007,  Bridge Improvement Cost: $425,000,  Roadway Improvement Cost: $1,252,000,  Total Project Cost: $5,739,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>

Structure Number: 46010000101346,  Location: POTTSTOWN 11D11 (Lat: 40.244917,  Lng: -75.660131),  Route carried "on" structure: State highway 100,  Year Built: 1954,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 5.30m (17.39ft),  Average Daily Traffic: 31,799 (year 2008),  Truck Traffic: 11%,  Average Future Daily Traffic: 17,433 (year 2013),  Design Load: H 15,  Features Intersected: PRIVATE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 32 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 46010000102114,  Location: POTTSTOWN 11C10 (Lat: 40.246944,  Lng: -75.660750),  Route carried "on" structure: State highway 100,  Year Built: 1954,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 13.87m (45.51ft),  Average Daily Traffic: 31,799 (year 2008),  Truck Traffic: 11%,  Average Future Daily Traffic: 17,433 (year 2013),  Design Load: H 15,  Features Intersected: CONRAIL & HIGH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 15,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 33 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 2,  Length of Maximum Span: 31.4m (103.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $44,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $593,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 46010000202456,  Location: POTTSTOWN 11D09 (Lat: 40.255056,  Lng: -75.658458),  Route carried "on" structure: State highway 100,  Year Built: 1958,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 11.86m (38.91ft),  Average Daily Traffic: 28,522 (year 2008),  Truck Traffic: 12%,  Average Future Daily Traffic: 30,096 (year 2013),  Design Load: H 15,  Features Intersected: MANATAWNY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.866,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 34 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Underwater Inspection Date: June 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 460100003,  Location: POTTSTOWN 11D08 (Lat: 40.257472,  Lng: -75.656333),  Route carried "on" structure: State highway 100,  Year Built: 1958,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 28,522 (year 2008),  Truck Traffic: 12%,  Average Future Daily Traffic: 22,120 (year 2000),  Design Load: H 15,  Features Intersected: MANATAWNY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.938,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 32 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $26,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $349,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 46042200301961,  Location: WEST OF POTTSTOWN 11A11 (Lat: 40.243056,  Lng: -75.676103),  Route carried "on" structure: US 422,  Year Built: 1965,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 26.49m (86.91ft),  Average Daily Traffic: 33,865 (year 2008),  Truck Traffic: 8%,  Average Future Daily Traffic: 29,117 (year 2013),  Design Load: H 15,  Features Intersected: SCHUYLKILL RIVER,  Facility Carried by Structure: POTTSTOWN BY-PASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.529,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 34 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 46.9m (153.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 22.1m (72.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 26.90m (88.25ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Underwater Inspection Date: September 2007,  Bridge Improvement Cost: $322,000,  Roadway Improvement Cost: $949,000,  Total Project Cost: $4,350,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 46066300101627,  Location: NEAR POTTSTOWN 11D10 (Lat: 40.247444,  Lng: -75.655906),  Route carried "on" structure: State highway 663,  Year Built: 1957,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 10,293 (year 2008),  Truck Traffic: 6%,  Average Future Daily Traffic: 19,104 (year 2013),  Design Load: H 15,  Features Intersected: MANATAWNY CREEK,  Facility Carried by Structure: WEST KING STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Poor,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.55m (18.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $531,000,  Total Project Cost: $2,432,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 464031038001,  Location: EAST OF PA 100 11D10 (Lat: 40.246417,  Lng: -75.655931),  Route carried "on" structure: State highway ,  Year Built: 1908,  Status: Posted for load,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 12,427 (year 2008),  Truck Traffic: 7%,  Average Future Daily Traffic: 22,967 (year 2013),  Design Load: H 15,  Features Intersected: MANATAWNY CREEK,  Facility Carried by Structure: RIDGE PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.258,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 14.4m (47.2ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Serious,  Channel: Poor,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 5.97m (19.59ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Underwater Inspection Date: June 2007,  Bridge Improvement Cost: $209,000,  Roadway Improvement Cost: $614,000,  Total Project Cost: $2,816,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 46403700100848,  Location: POTTSTOWN 11D10 (Lat: 40.248556,  Lng: -75.654725),  Route carried "on" structure: State highway ,  Year Built: 1964,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 7,770 (year 2008),  Truck Traffic: 3%,  Average Future Daily Traffic: 20,121 (year 2013),  Design Load: H 15,  Features Intersected: BR.MANATAWY CREEK,  Facility Carried by Structure: MANATAWNY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $4,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $48,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 464038001,  Location: POTTSTOWN 11E11 (Lat: 40.241556,  Lng: -75.651239),  Route carried "on" structure: Spur State highway ,  Year Built: 1975,  Status: Open,  Structure Length: 10.49m (34.42ft),  Average Daily Traffic: 10,868 (year 2008),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,382 (year 2013),  Design Load: H 15,  Features Intersected: SCHUYLKILL RIVER,  Facility Carried by Structure: HANOVER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Underwater Inspection Date: June 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 4670460150019,  Location: MADSION BRIDGE 11G12 (Lat: 40.234056,  Lng: -75.634694),  Route carried "on" structure: City street ,  Year Built: 1935,  Status: Posted for load,  Structure Length: 22.83m (74.90ft),  Average Daily Traffic: 8,408 (year 2004),  Average Future Daily Traffic: 7,280 (year 1997),  Design Load: H 15,  Features Intersected: SCHUYLKILL RIVER,  Facility Carried by Structure: KEIM STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.40m (80.05ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Underwater Inspection Date: April 2008,  Bridge Improvement Cost: $60,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $811,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 467416001,  Location: CHARLOTTE STREET 11E11 (Lat: 40.255000,  Lng: -75.648333),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 1,500 (year 1993),  Average Future Daily Traffic: 2,100 (year 2013),  Design Load: H 15,  Features Intersected: NORFOLK(HARRISBURG BR.),  Facility Carried by Structure: CHARLOTTE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Railroad,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2005,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 467416002,  Location: 11J12 (Lat: 40.238889,  Lng: -75.627778),  Route carried "on" structure: City street ,  Year Built: 1966,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 850 (year 1999),  Average Future Daily Traffic: 1,500 (year 2017),  Design Load: H 15,  Features Intersected: NORFOLK SOUTHERN,  Facility Carried by Structure: MOSER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2005,  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 467416003,  Location: 11C07 (Lat: 40.250000,  Lng: -75.650000),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 9.33m (30.61ft),  Average Daily Traffic: 750 (year 1991),  Design Load: H 15,  Features Intersected: MANATAWNY CK;CONRAIL,  Facility Carried by Structure: GLASGOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2008,  Bridge Improvement Cost: $-1,000,  Roadway Improvement Cost: $-1,000,  Total Project Cost: $-1,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 46741616600005,  Location: EVANS STREET 11F11 (Lat: 40.241667,  Lng: -75.646667),  Route carried "on" structure: City street ,  Year Built: 1928,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 1,500 (year 1989),  Average Future Daily Traffic: 2,100 (year 2009),  Design Load: H 15,  Features Intersected: NORFOLK;HARRISBURG BR.,  Facility Carried by Structure: EVANS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Railroad,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.14m (10.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2005,  Bridge Improvement Cost: $9,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $123,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 46741616700005,  Location: FRANKLIN STREET 11F11 (Lat: 40.241667,  Lng: -75.645000),  Route carried "on" structure: City street ,  Year Built: 1920,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 750 (year 1991),  Average Future Daily Traffic: 1,050 (year 2011),  Design Load: H 15,  Features Intersected: NORFOLK;HARRISBURG BR.,  Facility Carried by Structure: FRANKLIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Railroad,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.08m (10.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2005,  Bridge Improvement Cost: $39,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $523,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 46741616800005,  Location: SOUTH HIGH STREET 11F11 (Lat: 40.241667,  Lng: -75.643333),  Route carried "on" structure: City street ,  Year Built: 1920,  Year Reconstructed: 1950,  Status: Posted for load,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 100 (year 1990),  Average Future Daily Traffic: 140 (year 2010),  Design Load: H 15,  Features Intersected: NORFOLK;HARRISBURG LINE,  Facility Carried by Structure: WASHINGTON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Railroad,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2005,  Bridge Improvement Cost: $49,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $660,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 46802802500537,  Location: RAMP ONTO LR779 11C10 (Lat: 40.248333,  Lng: -75.661667),  Route carried "on" structure: Ramp State highway ,  Year Built: 1954,  Status: Open,  Structure Length: 18.07m (59.28ft),  Average Daily Traffic: 48 (year 2008),  Truck Traffic: 7%,  Average Future Daily Traffic: 50 (year 2013),  Design Load: H 15,  Features Intersected: PRIVATE ROAD,  Facility Carried by Structure: RAMP B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Number Of Approach Spans: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $271,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 460100001,  Location: .5 MILES N.OF 422 11D11 (Lat: 40.241306,  Lng: -75.659128),  Route carried "under" structure: State highway ,  Year Built: 1954,  Structure Length: 24.90m (81.69ft),  Average Daily Traffic: 1,000 (year 2005),  Truck Traffic: 7%,  Features Intersected: SCHUYLKILL RIVER;ROAD,  Facility Carried by Structure: TRAFFIC ROUTE 100
Minimum Vertical Clearance: 4.09m (13.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 56.4m (185.0ft)

Find on map >>

Structure Number: 46010000101346,  Location: POTTSTOWN 11D11 (Lat: 40.244917,  Lng: -75.660131),  Route carried "under" structure: Other road ,  Year Built: 1954,  Structure Length: 5.30m (17.39ft),  Average Daily Traffic: 500 (year 2005),  Truck Traffic: 7%,  Features Intersected: PRIVATE ROAD,  Facility Carried by Structure: TRAFFIC ROUTE 100
Minimum Vertical Clearance: 7.16m (23.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>

Structure Number: 46010000102114,  Location: POTTSTOWN 11C10 (Lat: 40.246944,  Lng: -75.660750),  Route carried "under" structure: Ramp State highway ,  Year Built: 1954,  Structure Length: 13.87m (45.51ft),  Average Daily Traffic: 48 (year 2008),  Truck Traffic: 7%,  Features Intersected: CONRAIL & HIGH STREET,  Facility Carried by Structure: TRAFFIC ROUTE 100
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>

Structure Number: 46010000102114,  Location: POTTSTOWN 11C10 (Lat: 40.246944,  Lng: -75.660750),  Route carried "under" structure: State highway ,  Year Built: 1954,  Structure Length: 13.87m (45.51ft),  Average Daily Traffic: 7,335 (year 2008),  Truck Traffic: 7%,  Features Intersected: CONRAIL & HIGH STREET,  Facility Carried by Structure: TRAFFIC ROUTE 100
Minimum Vertical Clearance: 10.67m (35.01ft),  Kilometerpoint: 26.258,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>

Structure Number: 46010000102114,  Location: POTTSTOWN 11C10 (Lat: 40.246944,  Lng: -75.660750),  Route carried "under" structure: State highway ,  Year Built: 1954,  Structure Length: 13.87m (45.51ft),  Average Daily Traffic: 5,092 (year 2008),  Truck Traffic: 7%,  Features Intersected: CONRAIL & HIGH STREET,  Facility Carried by Structure: TRAFFIC ROUTE 100
Minimum Vertical Clearance: 10.67m (35.01ft),  Kilometerpoint: 26.258,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>

Structure Number: 460100003,  Location: POTTSTOWN 11D08 (Lat: 40.257472,  Lng: -75.656333),  Route carried "under" structure: State highway ,  Year Built: 1958,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 2,724 (year 2008),  Truck Traffic: 5%,  Features Intersected: MANATAWNY STREET,  Facility Carried by Structure: TRAFFIC ROUTE 100
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 0.735,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>

Structure Number: 46802802500537,  Location: RAMP ONTO LR779 11C10 (Lat: 40.248333,  Lng: -75.661667),  Route carried "under" structure: City street ,  Year Built: 1954,  Structure Length: 18.07m (59.28ft),  Average Daily Traffic: 89 (year 1980),  Features Intersected: PRIVATE ROAD,  Facility Carried by Structure: RAMP B
Minimum Vertical Clearance: 4.11m (13.48ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Discuss this city on our hugely popular Pennsylvania forum

Back to: Pottstown, PA, Pennsylvania, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.