![]() |
Bridge Statistics for Price, Utah (UT) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Price, UT, Utah, Utah forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 15 Total length: 91 meters (299ft) Total costs: $11,043,000 Total average daily traffic: 143,149 Total average daily truck traffic: 28,152 National Bridge Inventory (NBI) Registered Bridges for Price
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 7012V, Location: 650 NO.CEDAR HILLS DRIVE (Lat: 39.610556, Lng: -110.792778), Route carried "on" structure: City street , Year Built: 1982, Status: Open, Structure Length: 0.78m (2.56ft), Average Daily Traffic: 250 (year 2003), Truck Traffic: 1%, Average Future Daily Traffic: 304 (year 2023), Design Load: HS 20, Features Intersected: MEAD'S WASH, Facility Carried by Structure: 650 NORTH STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 13.7m (44.9ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.3m (10.8ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 0.0m Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006 Find on map >>
Structure Number: 7015C, Location: SO. PRICE ON 300 W. ST. (Lat: 39.587778, Lng: -110.816667), Route carried "on" structure: City street , Year Built: 1910, Status: Closed, Structure Length: 2.04m (6.69ft), Average Daily Traffic: 1 (year 2002), Average Future Daily Traffic: 1 (year 2022), Features Intersected: PRICE RIVER, Facility Carried by Structure: PRICE CITY STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 5.8m (19.0ft), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Length of Maximum Span: 19.2m (63.0ft), Curb-To-Curb Width: 5.5m (18.0ft), Out-to-Out Width: 6.2m (20.3ft) Condition: Deck: Failed, Superstructure: Serious, Substructure: Failed, Channel: Satisfactory, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Somewhat better than minimum adequacy, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 2.80m (9.19ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2006, Critical Feature Inspection Date: August 2006, Bridge Improvement Cost: $167,000, Roadway Improvement Cost: $17,000, Total Project Cost: $276,000 ( Estimate for 2000), Deck Structure Type: Steel plate, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: C 682, Location: WEST SIDE OF PRICE (Lat: 39.599722, Lng: -110.818333), Route carried "on" structure: State highway 55, Year Built: 1979, Status: Open, Structure Length: 20.73m (68.01ft), Average Daily Traffic: 14,590 (year 2002), Truck Traffic: 5%, Average Future Daily Traffic: 17,727 (year 2022), Design Load: HS 20, Features Intersected: CITY STREET & UPRR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.917, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 16.5m (54.1ft), Skew: 5 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 48.8m (160.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.2m (3.9ft), Curb-To-Curb Width: 13.0m (42.7ft), Out-to-Out Width: 15.5m (50.9ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 21.20m (69.55ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $2,114,000, Roadway Improvement Cost: $211,000, Total Project Cost: $3,488,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: C 722, Location: AT THE EAST PRICE INTCHG. (Lat: 39.570556, Lng: -110.792722), Route carried "on" structure: US 6, Year Built: 1982, Status: Open, Structure Length: 7.28m (23.88ft), Average Daily Traffic: 18,005 (year 2002), Truck Traffic: 28%, Average Future Daily Traffic: 21,876 (year 2022), Design Load: HS 20, Features Intersected: CITY STREET & UPRR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 390.145, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 22 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 23.2m (76.1ft), Curb-To-Curb Width: 18.3m (60.0ft), Out-to-Out Width: 19.1m (62.7ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 8.30m (27.23ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $1,024,000, Roadway Improvement Cost: $102,000, Total Project Cost: $1,689,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: D 401, Location: SOUTH SIDE OF PRICE (Lat: 39.586750, Lng: -110.812583), Route carried "on" structure: State highway 10, Year Built: 1936, Year Reconstructed: 1982, Status: Open, Structure Length: 2.29m (7.51ft), Average Daily Traffic: 13,565 (year 2002), Truck Traffic: 25%, Average Future Daily Traffic: 16,481 (year 2022), Design Load: H 15, Features Intersected: PRICE RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 109.380, Lanes on structure: 5, Owner: State Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 19.8m (65.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 2.4m (7.9ft), Curb-To-Curb Width: 22.2m (72.8ft), Out-to-Out Width: 25.8m (84.6ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Serious, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 22.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.10m (10.17ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $519,000, Roadway Improvement Cost: $52,000, Total Project Cost: $857,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: F 386, Location: 1 MILE WEST OF PRICE (Lat: 39.600944, Lng: -110.825722), Route carried "on" structure: State highway 55, Year Built: 1977, Status: Open, Structure Length: 4.72m (15.49ft), Average Daily Traffic: 12,035 (year 2002), Truck Traffic: 5%, Average Future Daily Traffic: 14,623 (year 2022), Design Load: HS 20, Features Intersected: PRICE RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.306, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 16.5m (54.1ft), Skew: 23 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 23.2m (76.1ft), Curb-To-Curb Width: 17.2m (56.4ft), Out-to-Out Width: 18.4m (60.4ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.70m (18.70ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $679,000, Roadway Improvement Cost: $68,000, Total Project Cost: $1,121,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: F 388, Location: SOUTH SIDE OF PRICE CITY (Lat: 39.595611, Lng: -110.823222), Route carried "on" structure: US 6, Year Built: 1982, Status: Open, Structure Length: 3.32m (10.89ft), Average Daily Traffic: 12,095 (year 2002), Truck Traffic: 28%, Average Future Daily Traffic: 14,695 (year 2022), Design Load: HS 20, Features Intersected: PRICE RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 386.824, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 21 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.7m (104.0ft), Curb-To-Curb Width: 13.7m (44.9ft), Out-to-Out Width: 14.7m (48.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Very good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.20m (13.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $398,000, Roadway Improvement Cost: $40,000, Total Project Cost: $657,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: F 389, Location: SOUTH SIDE OF PRICE CITY (Lat: 39.588028, Lng: -110.812306), Route carried "on" structure: US 6, Year Built: 1982, Status: Open, Structure Length: 4.05m (13.29ft), Average Daily Traffic: 12,095 (year 2002), Truck Traffic: 28%, Average Future Daily Traffic: 14,695 (year 2022), Design Load: HS 20, Features Intersected: SR-10 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 388.121, Lanes on structure: 2, Lanes under structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 20 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 38.4m (126.0ft), Curb-To-Curb Width: 13.0m (42.7ft), Out-to-Out Width: 14.1m (46.3ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.00m (16.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $594,000, Roadway Improvement Cost: $59,000, Total Project Cost: $980,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: F 465, Location: WEST PRICE INTERCHANGE (Lat: 39.601139, Lng: -110.827556), Route carried "on" structure: US 6, Year Built: 1982, Status: Open, Structure Length: 3.93m (12.89ft), Average Daily Traffic: 12,095 (year 2002), Truck Traffic: 28%, Average Future Daily Traffic: 14,695 (year 2022), Design Load: HS 20, Features Intersected: SR-55,WEST PRICE CONN. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 386.114, Lanes on structure: 2, Lanes under structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 23 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 37.8m (124.0ft), Curb-To-Curb Width: 13.7m (44.9ft), Out-to-Out Width: 14.7m (48.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.90m (16.08ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $579,000, Roadway Improvement Cost: $58,000, Total Project Cost: $956,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: F 501, Location: AT THE EAST PRICE INTCHG (Lat: 39.587083, Lng: -110.789389), Route carried "on" structure: US 6, Year Built: 1985, Status: Open, Structure Length: 3.40m (11.15ft), Average Daily Traffic: 13,575 (year 2002), Truck Traffic: 28%, Average Future Daily Traffic: 16,494 (year 2022), Design Load: HS 20, Features Intersected: SR-55 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 390.217, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 17.1m (56.1ft), Skew: 22 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 33.0m (108.3ft), Curb-To-Curb Width: 17.9m (58.7ft), Out-to-Out Width: 19.0m (62.3ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.30m (14.11ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $617,000, Roadway Improvement Cost: $62,000, Total Project Cost: $1,019,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: C 682, Location: WEST SIDE OF PRICE (Lat: 39.599722, Lng: -110.818333), Route carried "under" structure: City street , Year Built: 1979, Structure Length: 20.73m (68.01ft), Average Daily Traffic: 2,000 (year 2002), Truck Traffic: 4%, Features Intersected: CITY STREET & UPRR, Facility Carried by Structure: SR-55 Minimum Vertical Clearance: 4.47m (14.67ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 48.8m (160.1ft) Find on map >>
Structure Number: C 722, Location: AT THE EAST PRICE INTCHG. (Lat: 39.570556, Lng: -110.792722), Route carried "under" structure: City street , Year Built: 1982, Structure Length: 7.28m (23.88ft), Average Daily Traffic: 110 (year 2002), Truck Traffic: 1%, Features Intersected: CITY STREET & UPRR, Facility Carried by Structure: US-6 (SR-6) Minimum Vertical Clearance: 7.16m (23.49ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.2m (76.1ft) Find on map >>
Structure Number: F 389, Location: SOUTH SIDE OF PRICE CITY (Lat: 39.588028, Lng: -110.812306), Route carried "under" structure: State highway 10, Year Built: 1982, Structure Length: 4.05m (13.29ft), Average Daily Traffic: 13,565 (year 2002), Truck Traffic: 25%, Features Intersected: SR-10, Facility Carried by Structure: US-6 (SR-6) Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 109.509, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.4m (126.0ft) Find on map >>
Structure Number: F 465, Location: WEST PRICE INTERCHANGE (Lat: 39.601139, Lng: -110.827556), Route carried "under" structure: State highway 55, Year Built: 1982, Structure Length: 3.93m (12.89ft), Average Daily Traffic: 12,035 (year 2002), Truck Traffic: 5%, Features Intersected: SR-55,WEST PRICE CONN., Facility Carried by Structure: US-6 (SR-6) Minimum Vertical Clearance: 4.78m (15.68ft), Kilometerpoint: 0.087, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.8m (124.0ft) Find on map >>
Structure Number: F 501, Location: AT THE EAST PRICE INTCHG (Lat: 39.587083, Lng: -110.789389), Route carried "under" structure: State highway 55, Year Built: 1985, Structure Length: 3.40m (11.15ft), Average Daily Traffic: 7,133 (year 2002), Truck Traffic: 5%, Features Intersected: SR-55, Facility Carried by Structure: US-6 (SR-6) Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 4.586, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 33.0m (108.3ft) Discuss this city on our hugely popular Utah forum Back to: Price, UT, Utah, All US cities.
|
![]() |