Bridge Statistics for Putnam Valley, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Putnam Valley, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics
Number of bridges: 17
Total length: 41 meters (135ft) Total costs: $9,551,000 Total average daily traffic: 168,294 Total average daily truck traffic: 11,339 National Bridge Inventory (NBI) Registered Bridges for Putnam Valley
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 10453, Location: JCT RTE 301+TSP (Lat: 41.468142, Lng: -73.820883), Route carried "on" structure: State highway 301, Year Built: 1935, Status: Open, Structure Length: 2.25m (7.38ft), Average Daily Traffic: 1,490 (year 2009), Truck Traffic: 9%, Average Future Daily Traffic: 1,932 (year 2029), Design Load: H 20, Features Intersected: RTE 987G Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 18.010, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 20.4m (66.9ft), Curb-To-Curb Width: 10.6m (34.8ft), Out-to-Out Width: 12.1m (39.7ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 59.0 metric tons, Inventory Rating: 23.1 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 2.25m (7.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2009, Bridge Improvement Cost: $784,000, Roadway Improvement Cost: $469,000, Total Project Cost: $1,253,000 ( Estimate for 2009), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 222393, Location: 1.0MI SW OF TOMPKNSONR (Lat: 41.388714, Lng: -73.812728), Route carried "on" structure: City street , Year Built: 1988, Status: Open, Structure Length: 0.82m (2.69ft), Average Daily Traffic: 1,350 (year 1997), Truck Traffic: 6%, Average Future Daily Traffic: 1,890 (year 2017), Design Load: HS 20, Features Intersected: PEEKSKLL HOLLW CK, Facility Carried by Structure: BRYANT POND ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 5.4m (17.7ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft), Curb-To-Curb Width: 6.2m (20.3ft), Out-to-Out Width: 7.0m (23.0ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 78.2 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 0.82m (2.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2009, Bridge Improvement Cost: $165,000, Roadway Improvement Cost: $98,000, Total Project Cost: $263,000 ( Estimate for 2009), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 222394, Location: 1.5 MI SW OF OSCAWANA LK (Lat: 41.384064, Lng: -73.873686), Route carried "on" structure: City street , Year Built: 1999, Status: Open, Structure Length: 1.33m (4.36ft), Average Daily Traffic: 1,345 (year 1994), Truck Traffic: 5%, Average Future Daily Traffic: 1,883 (year 2014), Design Load: HS 25, Features Intersected: CANOPUS CREEK, Facility Carried by Structure: CANOPUS HOLLOW RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.2m (40.0ft), Curb-To-Curb Width: 7.8m (25.6ft), Out-to-Out Width: 8.6m (28.2ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Channel: Fair, Operating Rating: 69.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.33m (4.36ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2009, Bridge Improvement Cost: $165,000, Roadway Improvement Cost: $98,000, Total Project Cost: $263,000 ( Estimate for 2009), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 222398, Location: 6.1 MI NE OF PEEKSKILL (Lat: 41.368078, Lng: -73.879164), Route carried "on" structure: City street , Year Built: 1955, Status: Open, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 200 (year 2009), Truck Traffic: 6%, Average Future Daily Traffic: 280 , Features Intersected: CANOPUS CREEK, Facility Carried by Structure: CIMARRON ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Town or Township Highway Agency, Approaching Roadway Width: 5.4m (17.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.3m (24.0ft), Curb-To-Curb Width: 5.4m (17.7ft), Out-to-Out Width: 5.7m (18.7ft) Condition: Deck: Good, Superstructure: Good, Substructure: Poor, Channel: Good, Operating Rating: 51.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.76m (2.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2009, Bridge Improvement Cost: $126,000, Roadway Improvement Cost: $75,000, Total Project Cost: $201,000 ( Estimate for 2009), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 222399, Location: 1.5 MI SW OF OSCAWANA L (Lat: 41.378911, Lng: -73.872675), Route carried "on" structure: City street , Year Built: 1930, Status: Open, Structure Length: 0.97m (3.18ft), Average Daily Traffic: 171 (year 1997), Truck Traffic: 5%, Average Future Daily Traffic: 239 (year 2017), Features Intersected: CANOPUS CREEK, Facility Carried by Structure: HORTON HOLLOW RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Town or Township Highway Agency, Approaching Roadway Width: 3.6m (11.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.8m (28.9ft), Curb-To-Curb Width: 4.6m (15.1ft), Out-to-Out Width: 5.2m (17.1ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 44.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 0.97m (3.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2008, Bridge Improvement Cost: $126,000, Roadway Improvement Cost: $75,000, Total Project Cost: $201,000 ( Estimate for 2009), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 3224, Location: 3.8 MI NE OF PEEKSKILL (Lat: 41.337017, Lng: -73.879853), Route carried "on" structure: City street , Year Built: 1969, Status: Open, Structure Length: 3.23m (10.60ft), Average Daily Traffic: 2,679 (year 1993), Truck Traffic: 6%, Average Future Daily Traffic: 3,751 (year 2013), Design Load: HS 20, Features Intersected: LAKE PEEKS OUTLET, Facility Carried by Structure: LAKE DRIVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 30.4m (99.7ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.6m (31.5ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 25.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.23m (10.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2008, Bridge Improvement Cost: $785,000, Roadway Improvement Cost: $468,000, Total Project Cost: $1,253,000 ( Estimate for 2009), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 334564, Location: 3.5 MI N OF SHRUB OAK (Lat: 41.376892, Lng: -73.828153), Route carried "on" structure: County highway , Year Built: 1940, Status: Open, Structure Length: 1.58m (5.18ft), Average Daily Traffic: 2,394 (year 2009), Truck Traffic: 5%, Average Future Daily Traffic: 3,352 (year 2029), Features Intersected: PEEKSKLL HOLLW CK, Facility Carried by Structure: PEEKSKILL HOLLOW Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.9m (48.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.4m (24.3ft) Condition: Deck: Poor, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 1.58m (5.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2008, Bridge Improvement Cost: $299,000, Roadway Improvement Cost: $179,000, Total Project Cost: $478,000 ( Estimate for 2009), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 334565, Location: 2.4 MI NW OF SHRUB OAK (Lat: 41.336481, Lng: -73.864636), Route carried "on" structure: County highway , Year Built: 1959, Status: Open, Structure Length: 2.46m (8.07ft), Average Daily Traffic: 4,565 (year 2009), Truck Traffic: 5%, Average Future Daily Traffic: 6,391 (year 2029), Design Load: H 20, Features Intersected: PEEKSKILL HOLL CK, Facility Carried by Structure: PEEKSKILL HOLL RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 23.1m (75.8ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 10.3m (33.8ft), Out-to-Out Width: 12.6m (41.3ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 35.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 20.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.46m (8.07ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2009, Bridge Improvement Cost: $893,000, Roadway Improvement Cost: $534,000, Total Project Cost: $1,427,000 ( Estimate for 2009), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 334567, Location: 2.1 MI NW OF SHRUB OAK (Lat: 41.353458, Lng: -73.841939), Route carried "on" structure: County highway , Year Built: 1959, Status: Open, Structure Length: 2.01m (6.59ft), Average Daily Traffic: 3,760 (year 2009), Truck Traffic: 5%, Average Future Daily Traffic: 5,264 (year 2029), Design Load: H 20, Features Intersected: PEEKSKILL HOL CK, Facility Carried by Structure: CHURCH ROAD CR 22 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 18.5m (60.7ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 10.2m (33.5ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.01m (6.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2008, Bridge Improvement Cost: $588,000, Roadway Improvement Cost: $352,000, Total Project Cost: $940,000 ( Estimate for 2009), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 334568, Location: 2.9 MI W OF SHRUB OAK (Lat: 41.333286, Lng: -73.874967), Route carried "on" structure: County highway , Year Built: 1964, Status: Open, Structure Length: 1.85m (6.07ft), Average Daily Traffic: 9,663 (year 1993), Truck Traffic: 5%, Average Future Daily Traffic: 13,528 (year 2013), Design Load: H 20, Features Intersected: PEEKSKLL HOLLW CK, Facility Carried by Structure: OSCAWANNA LAKE RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.6m (24.9ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 17.9m (58.7ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 8.6m (28.2ft), Out-to-Out Width: 11.1m (36.4ft) Condition: Deck: Poor, Superstructure: Fair, Substructure: Fair, Channel: Poor, Operating Rating: 43.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 16.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.85m (6.07ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2008, Bridge Improvement Cost: $590,000, Roadway Improvement Cost: $353,000, Total Project Cost: $943,000 ( Estimate for 2009), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 336813, Location: 3 MI N JCT US 6 & TSP (Lat: 41.375092, Lng: -73.801256), Route carried "on" structure: County highway , Year Built: 1993, Status: Open, Structure Length: 5.42m (17.78ft), Average Daily Traffic: 13,548 (year 2009), Truck Traffic: 5%, Average Future Daily Traffic: 18,967 (year 2029), Design Load: HS 20, Features Intersected: RTE 987G, FR.PONDRDTOTSP, Facility Carried by Structure: BRYANT POND ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 5, Owner: State Highway Agency, Approaching Roadway Width: 11.5m (37.7ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 53.3m (174.9ft), Curb-To-Curb Width: 11.5m (37.7ft), Out-to-Out Width: 12.4m (40.7ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 74.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 44.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.42m (17.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2008, Bridge Improvement Cost: $62,000, Roadway Improvement Cost: $36,000, Total Project Cost: $98,000 ( Estimate for 2009), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 5502319, Location: 1.1 MI NE OF TOMPKINS CRN (Lat: 41.408133, Lng: -73.786961), Route carried "on" structure: Other road 987G, Year Built: 1932, Status: Open, Structure Length: 0.97m (3.18ft), Average Daily Traffic: 31,903 (year 2009), Truck Traffic: 8%, Average Future Daily Traffic: 41,215 (year 2029), Features Intersected: PEEKSKLL HOLLW CK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 8.523, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.7m (44.9ft), Skew: 22 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.0m (23.0ft), Curb-To-Curb Width: 13.7m (44.9ft), Out-to-Out Width: 14.7m (48.2ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 74.7 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.97m (3.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2008, Bridge Improvement Cost: $410,000, Roadway Improvement Cost: $245,000, Total Project Cost: $655,000 ( Estimate for 2009), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 5502329, Location: 5.9 MI NE OF SHRUB OAK (Lat: 41.409378, Lng: -73.786997), Route carried "on" structure: Other road 987G, Year Built: 1934, Status: Open, Structure Length: 2.34m (7.68ft), Average Daily Traffic: 31,903 (year 2009), Truck Traffic: 8%, Average Future Daily Traffic: 41,215 (year 2029), Design Load: HS 20, Features Intersected: CR 21-PKLL HOL RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 8.516, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.4m (40.7ft), Skew: 23 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 21.3m (69.9ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 14.7m (48.2ft) Condition: Deck: Poor, Superstructure: Poor, Substructure: Fair, Operating Rating: 86.2 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.34m (7.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2008, Bridge Improvement Cost: $986,000, Roadway Improvement Cost: $590,000, Total Project Cost: $1,576,000 ( Estimate for 2009), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 10453, Location: JCT RTE 301+TSP (Lat: 41.468142, Lng: -73.820883), Route carried "under" structure: Other road 987G, Year Built: 1935, Structure Length: 2.25m (7.38ft), Average Daily Traffic: 29,020 (year 2007), Truck Traffic: 8%, Features Intersected: RTE 987G, Facility Carried by Structure: RTE 301 Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 17.248, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Arch - Deck, Length of Maximum Span: 20.4m (66.9ft) Find on map >>
Structure Number: 336813, Location: 3 MI N JCT US 6 & TSP (Lat: 41.375092, Lng: -73.801256), Route carried "under" structure: Other road 987G, Year Built: 1993, Structure Length: 5.42m (17.78ft), Average Daily Traffic: 31,903 (year 2009), Truck Traffic: 5%, Features Intersected: RTE 987G, FR.PONDRDTOTSP, Facility Carried by Structure: BRYANT POND ROAD Minimum Vertical Clearance: 4.47m (14.67ft), Kilometerpoint: 4.296, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 53.3m (174.9ft) Find on map >>
Structure Number: 336813, Location: 3 MI N JCT US 6 & TSP (Lat: 41.375092, Lng: -73.801256), Route carried "under" structure: Other road , Year Built: 1993, Structure Length: 5.42m (17.78ft), Average Daily Traffic: 1,400 (year 2009), Truck Traffic: 8%, Features Intersected: RTE 987G, FR.PONDRDTOTSP, Facility Carried by Structure: BRYANT POND ROAD Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 53.3m (174.9ft) Find on map >>
Structure Number: 5502329, Location: 5.9 MI NE OF SHRUB OAK (Lat: 41.409378, Lng: -73.786997), Route carried "under" structure: County highway , Year Built: 1934, Structure Length: 2.34m (7.68ft), Average Daily Traffic: 1,000 (year 2009), Truck Traffic: 5%, Features Intersected: CR 21-PKLL HOL RD, Facility Carried by Structure: RTE 987G Minimum Vertical Clearance: 5.07m (16.63ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 21.3m (69.9ft)
Discuss this city on our hugely popular New York forum Back to: Putnam Valley, NY, New York, All US cities.
|
![]() |