Bridge Statistics for Ragland, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 118ft / 35.6mTotal length
  • $10,873,000Total costs
  • 23,379Total average daily traffic
  • 1,848Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ragland
  • No street view available for this location

New bridges in Ragland, AL - historical statistics
  • New bridges - historical statistics
  • 31940-1949
  • 21950-1959
  • 61960-1969
  • 21970-1979
  • 12000-2009
Average Bridge Daily Traffic in Ragland, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Good
  • 42.9%Satisfactory
  • 42.9%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 42.9%Good
  • 57.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 42.9%Good
  • 57.1%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 38.5%Good
  • 53.8%Satisfactory
  • 7.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Good
  • 83.3%Satisfactory
Find on map >>   Show street view

Structure Number: 2458,  Location: 5.5 MI. NO. US 231 (Lat: 33.703200,  Lng: -86.203000),  Route carried "on" structure: State highway 144,  Year Built: 1940,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 2,578 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,942 (year 2041),  Design Load: H 15,  Features Intersected: SHELOR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.913,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 84.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $304,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $334,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2459,  Location: @ RAGLAND FIRE DEPT/CITY (Lat: 33.741111,  Lng: -86.155833),  Route carried "on" structure: State highway 144,  Year Built: 1940,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 3,170 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,755 (year 2041),  Features Intersected: TROUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.0m

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.32m (4.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $359,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $395,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3295,  Location: 0 6 E RAGLAND (Lat: 33.749069,  Lng: -86.122325),  Route carried "on" structure: ServiceCounty highway 61,  Year Built: 1948,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 520 (year 1999),  Truck Traffic: 10%,  Average Future Daily Traffic: 821 (year 2029),  Design Load: H 15,  Features Intersected: GREEN BRANCH,  Facility Carried by Structure: ST CLAIR CO 66
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: October 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $281,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5281,  Location: BOILING SPRINGS RD. (Lat: 33.705025,  Lng: -86.102861),  Route carried "on" structure: County highway 73,  Year Built: 1955,  Status: Posted for load,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 1,032 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,105 (year 2041),  Design Load: H 15,  Features Intersected: ACKER CREEK,  Facility Carried by Structure: 3 MI W AL 77
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $978,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,076,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5282,  Location: BOILING SPRINGS RD. (Lat: 33.722433,  Lng: -86.077597),  Route carried "on" structure: County highway 73,  Year Built: 1955,  Status: Posted for load,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 1,032 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,105 (year 2041),  Design Load: H 15,  Features Intersected: CANE CREEK,  Facility Carried by Structure: 2 MI W AL 77
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 11.28m (37.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $1,778,000,  Roadway Improvement Cost: $178,000,  Total Project Cost: $1,956,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8027,  Location: IN RAGLAND (Lat: 33.717136,  Lng: -86.143867),  Route carried "on" structure: ServiceCounty highway 69,  Year Built: 1963,  Status: Open,  Structure Length: 3.04m (9.97ft),  Average Daily Traffic: 550 (year 1999),  Truck Traffic: 10%,  Average Future Daily Traffic: 844 (year 2029),  Design Load: H 15,  Features Intersected: TROUT CREEK,  Facility Carried by Structure: ST CLAIR CO HWY 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 51.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.88m (12.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $639,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $703,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8311,  Location: 1 8 MI E FAIRVIEW CHURCH (Lat: 33.736372,  Lng: -86.177464),  Route carried "on" structure: ServiceCounty highway 29,  Year Built: 1964,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 600 (year 1999),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,407 (year 2029),  Design Load: H 15,  Features Intersected: TROUT CREEK,  Facility Carried by Structure: ST CLAIR CO 26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 42.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,021,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,123,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9091,  Location: 1.5 MI NW FAIRVIEW CHURCH (Lat: 33.758033,  Lng: -86.217506),  Route carried "on" structure: ServiceCounty highway 29,  Year Built: 1966,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 500 (year 1999),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,407 (year 2029),  Design Load: H 15,  Features Intersected: LITTLE TROUT CREEK,  Facility Carried by Structure: ST CLAIR CO 26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 22.2m (72.8ft),  Out-to-Out Width: 22.2m (72.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $698,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $768,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9126,  Location: 0 3 MI S MT ZION CHURCH (Lat: 33.802353,  Lng: -86.117119),  Route carried "on" structure: County highway 64,  Year Built: 1966,  Status: Posted for load,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 400 (year 1999),  Truck Traffic: 5%,  Average Future Daily Traffic: 703 (year 2029),  Features Intersected: SHOUL CREEK,  Facility Carried by Structure: ST CLAIR CO HW 21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $1,021,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,123,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9354,  Location: IN RAGLAND (Lat: 33.742119,  Lng: -86.161808),  Route carried "on" structure: ServiceCounty highway 29,  Year Built: 1967,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 3,157 (year 2012),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,880 (year 2034),  Design Load: H 15,  Features Intersected: GREEN BRANCH,  Facility Carried by Structure: ST CLAIR CO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.42m (4.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $860,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $946,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11002,  Location: RAGLAND @ PROVIDENCE RD (Lat: 33.743333,  Lng: -86.145000),  Route carried "on" structure: State highway 144,  Year Built: 1973,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 3,260 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,861 (year 2041),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.400,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 48.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $816,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $898,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11003,  Location: 200' NO. OLD HWY 26 (Lat: 33.750000,  Lng: -86.122222),  Route carried "on" structure: State highway 144,  Year Built: 1973,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 3,260 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,861 (year 2041),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.863,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,016,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,118,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17317,  Location: 0.71KM FROM CO. RD. 21 (Lat: 33.804103,  Lng: -86.108825),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 150 (year 1999),  Truck Traffic: 5%,  Average Future Daily Traffic: 264 (year 2029),  Features Intersected: SHOUL CREEK,  Facility Carried by Structure: WALDROP RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.710,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.4m (14.4ft),  Curb-To-Curb Width: 3.6m (11.8ft),  Out-to-Out Width: 4.2m (13.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $138,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $152,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20342,  Location: WEST OF RAGLAND (Lat: 33.716667,  Lng: -86.153578),  Route carried "under" structure: US 144,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 3,170 (year 2013),  Truck Traffic: 8%,  Features Intersected: AL 144,  Facility Carried by Structure: CONVEYOR BELT
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 14.645,  Lanes under structure: 2,  Material/Design: Steel,  Length of Maximum Span: 30.5m (100.1ft)

Discuss Ragland, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.