National Bridge Inventory (NBI) Statistics
Number of bridges: 63
Total length: 372 meters (1,220ft)
Total costs: $100,053,000
Total average daily traffic: 1,959,242
Total average daily truck traffic: 284,752
National Bridge Inventory (NBI) Registered Bridges for Ramapo

New bridges - Historical Statistics

  • 1910-1919: 1
  • 1920-1929: 1
  • 1930-1939: 2
  • 1940-1949: 0
  • 1950-1959: 39
  • 1960-1969: 10
  • 1970-1979: 2
  • 1980-1989: 1
  • 1990-1999: 4
  • 2000-2009: 3

Reconstructed bridges - Historical Statistics

  • 1950-1959: 1
  • 1960-1969: 2
  • 1970-1979: 6
  • 1980-1989: 5
  • 1990-1999: 2
  • 2000-2009: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 102563,  Location: JCT RTE 45+PIP (Lat: 41.171775,  Lng: -74.032828),  Route carried "on" structure: State highway 45,  Year Built: 1955,  Status: Open,  Structure Length: 3.74m (12.27ft),  Average Daily Traffic: 13,478 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 18,869 (year 2026),  Design Load: H 20,  Features Intersected: RTE 987C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.066,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Park, Forest, or Reservation Agency,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.6m (57.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 55.3 metric tons,  Inventory Rating: 20.2 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.74m (12.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $1,185,000,  Roadway Improvement Cost: $705,000,  Total Project Cost: $1,890,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 102763,  Location: 4.7 MI E JCT SH17 & SH 59 (Lat: 41.110803,  Lng: -74.097478),  Route carried "on" structure: State highway 59,  Year Built: 2004,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 19,452 (year 2000),  Truck Traffic: 6%,  Average Future Daily Traffic: 25,309 (year 2020),  Design Load: HS 25,  Features Intersected: MNRR PV LINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 168.398,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 76.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $769,000,  Roadway Improvement Cost: $458,000,  Total Project Cost: $1,227,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 102764,  Location: 0.8 MI W JCT RTS 59+306 (Lat: 41.108800,  Lng: -74.084428),  Route carried "on" structure: State highway 59,  Year Built: 1954,  Status: Open,  Structure Length: 9.29m (30.48ft),  Average Daily Traffic: 18,040 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 25,256 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: RTE I87
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.915,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 20.4m (66.9ft),  Out-to-Out Width: 22.5m (73.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $4,627,000,  Roadway Improvement Cost: $2,686,000,  Total Project Cost: $7,313,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 102765,  Location: .2 MI W JCT SH59 & SH306 (Lat: 41.107514,  Lng: -74.073347),  Route carried "on" structure: State highway 59,  Year Built: 2006,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 18,040 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 25,256 (year 2026),  Design Load: HS 25,  Features Intersected: MNRR PV LINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.985,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $4,627,000,  Roadway Improvement Cost: $2,686,000,  Total Project Cost: $7,313,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>

Structure Number: 104011,  Location: 2.9 MI E JCT US202 & SH59 (Lat: 41.141183,  Lng: -74.115628),  Route carried "on" structure: US 202,  Year Built: 2000,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 7,721 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 10,809 (year 2027),  Design Load: HS 25,  Features Intersected: MAHWAH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.574,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Bridge Improvement Cost: $722,000,  Roadway Improvement Cost: $430,000,  Total Project Cost: $1,152,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 1068749,  Location: 3.3 MI N JCT PIP+RTE 304 (Lat: 41.148819,  Lng: -74.024919),  Route carried "on" structure: Other road 987C,  Year Built: 1953,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 1.73m (5.68ft),  Average Daily Traffic: 54,648 (year 2002),  Truck Traffic: 6%,  Average Future Daily Traffic: 71,103 (year 2022),  Design Load: H 20,  Features Intersected: CR80-NEW HMSTD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 179.532,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Park, Forest, or Reservation Agency,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 22 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.0m (3.3ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 28.4m (93.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.2 metric tons,  Inventory Rating: 23.4 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $1,093,000,  Roadway Improvement Cost: $650,000,  Total Project Cost: $1,743,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 10746,  Location: 2 MI N THRUWAY EXIT 15 (Lat: 41.148419,  Lng: -74.182933),  Route carried "on" structure: Other road ,  Year Built: 1992,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 5,400 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,182 ,  Design Load: HS 20,  Features Intersected: RTE I87,  Facility Carried by Structure: TANDEM TRK ACCESS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $728,000,  Roadway Improvement Cost: $433,000,  Total Project Cost: $1,161,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 109116,  Location: 1.4MI NW JCT RT17&RR&THWY (Lat: 41.148678,  Lng: -74.192725),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 6.03m (19.78ft),  Average Daily Traffic: 4,524 (year 1993),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,334 (year 2013),  Design Load: HS 20,  Features Intersected: RTE 17,  Facility Carried by Structure: STERLING MINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.5m (96.8ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.03m (19.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $335,000,  Roadway Improvement Cost: $199,000,  Total Project Cost: $534,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 10916,  Location: 0.6 MI N JCT SH 59 & SH 4 (Lat: 41.118064,  Lng: -74.043956),  Route carried "on" structure: State highway 45,  Year Built: 1978,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 20,279 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 28,391 (year 2026),  Design Load: HS 20,  Features Intersected: PASCACK BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.705,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 78.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $322,000,  Roadway Improvement Cost: $192,000,  Total Project Cost: $514,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 222415,  Location: 3.8 MI SE OF SUFFERN (Lat: 41.080764,  Lng: -74.083044),  Route carried "on" structure: Other road ,  Year Built: 1989,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,300 (year 1989),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,729 (year 2009),  Design Load: HS 20,  Features Intersected: SADDLE RIVER,  Facility Carried by Structure: HILLSIDE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $177,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $282,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 322414,  Location: 3.1 MILES SE OF SUFFERN (Lat: 41.099867,  Lng: -74.087136),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 2,000 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,800 ,  Features Intersected: MNRR PV LINE,  Facility Carried by Structure: CHRISTMAS HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.1m (75.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.97m (19.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $988,000,  Roadway Improvement Cost: $577,000,  Total Project Cost: $1,565,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 322416,  Location: 6.2 MI SW OF NYACK (Lat: 41.083431,  Lng: -74.041850),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,000 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,800 ,  Features Intersected: PASCACK BROOK,  Facility Carried by Structure: LILLIAN DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.4 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $988,000,  Roadway Improvement Cost: $577,000,  Total Project Cost: $1,565,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 334611,  Location: 4.0 MI NW SPRING VALLEY (Lat: 41.138172,  Lng: -74.118647),  Route carried "on" structure: County highway ,  Year Built: 1965,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 2.25m (7.38ft),  Average Daily Traffic: 3,725 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,215 (year 2025),  Design Load: HS 25,  Features Intersected: MAHWAH RIVER,  Facility Carried by Structure: VIOLA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $610,000,  Roadway Improvement Cost: $363,000,  Total Project Cost: $973,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 334612,  Location: 0.5 MI N OF SUFFERN (Lat: 41.124036,  Lng: -74.136300),  Route carried "on" structure: City street ,  Year Built: 1936,  Status: Open,  Structure Length: 1.18m (3.87ft),  Average Daily Traffic: 3,000 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,200 ,  Features Intersected: MAHWAH RIVER,  Facility Carried by Structure: MONTEBELLO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb or Sidewalk Widths: Left: 1.0m (3.3ft),  Right: 1.0m (3.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $610,000,  Roadway Improvement Cost: $363,000,  Total Project Cost: $973,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 334613,  Location: .6 MILE EAST OF SUFFERN (Lat: 41.114747,  Lng: -74.130167),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 6,597 (year 1995),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,568 (year 2015),  Design Load: HS 20,  Features Intersected: SUFFERN IND TRACK,  Facility Carried by Structure: COUNTY ROAD 93
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $610,000,  Roadway Improvement Cost: $363,000,  Total Project Cost: $973,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 334618,  Location: 2.3 MILES EAST OF SUFFERN (Lat: 41.112125,  Lng: -74.099492),  Route carried "on" structure: County highway ,  Year Built: 1968,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 4,000 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,600 ,  Design Load: HS 20,  Features Intersected: SUFFERN IND TRACK,  Facility Carried by Structure: SPOOK ROCK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.9m (81.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $1,126,000,  Roadway Improvement Cost: $670,000,  Total Project Cost: $1,796,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 334619,  Location: 3.4 MI S OF SPRING VALLEY (Lat: 41.067594,  Lng: -74.039831),  Route carried "on" structure: County highway ,  Year Built: 1950,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 1,000 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,400 ,  Features Intersected: PASCACK BROOK,  Facility Carried by Structure: PASCACK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $253,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 33462,  Location: 6.5 MI NW OF SPARKILL (Lat: 41.071914,  Lng: -74.044553),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 2,000 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,800 ,  Features Intersected: PASCACK BROOK,  Facility Carried by Structure: GROTKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.9m (12.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 75.4 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $271,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $432,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 334621,  Location: 3.7 MI SE OF SLOATSBURG (Lat: 41.133356,  Lng: -74.129947),  Route carried "on" structure: City street ,  Year Built: 1910,  Year Reconstructed: 1957,  Status: Open,  Structure Length: 1.76m (5.77ft),  Average Daily Traffic: 500 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 700 ,  Features Intersected: MAHWAH RIVER,  Facility Carried by Structure: MAYER DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.4m (53.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.76m (5.77ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Critical Feature Inspection Date: May 2007,  Bridge Improvement Cost: $333,000,  Roadway Improvement Cost: $198,000,  Total Project Cost: $531,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 336909,  Location: 0.6 MI EAST OF US 202 (Lat: 41.150439,  Lng: -74.096589),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 4,000 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,600 ,  Design Load: HS 20,  Features Intersected: WILLOW TREE BROOK,  Facility Carried by Structure: GRANDVIEW AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 73.9 metric tons,  Inventory Rating: 29.3 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $472,000,  Roadway Improvement Cost: $281,000,  Total Project Cost: $753,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 33691,  Location: 0.8 MI WEST OF SR 45 (Lat: 41.168519,  Lng: -74.036186),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 3,000 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,200 ,  Design Load: HS 20,  Features Intersected: MINISCEONGO CREEK,  Facility Carried by Structure: POMONA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.5m (4.9ft),  Curb or Sidewalk Widths: Left: 3.6m (11.8ft),  Right: 3.8m (12.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 73.5 metric tons,  Inventory Rating: 29.3 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $298,000,  Roadway Improvement Cost: $178,000,  Total Project Cost: $476,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 336998,  Location: .5 MI E JCT US202 & CR80 (Lat: 41.150528,  Lng: -74.097908),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 200 (year 2000),  Truck Traffic: 6%,  Average Future Daily Traffic: 261 (year 2020),  Design Load: HS 20,  Features Intersected: SPOOK ROCK BROOK,  Facility Carried by Structure: GRANDVIEW AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.8m (38.7ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 73.0 metric tons,  Inventory Rating: 13.0 metric tons,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $376,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $601,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 5014081,  Location: JCT I87 AND SH 17 (Lat: 41.139792,  Lng: -74.170708),  Route carried "on" structure: Interstate 87,  Year Built: 1953,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 23.16m (75.98ft),  Average Daily Traffic: 118,920 (year 2005),  Truck Traffic: 18%,  Average Future Daily Traffic: 166,488 (year 2025),  Design Load: HS 20+Mod,  Features Intersected: RTE 17, RAMAPO RIVER, MN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.559,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 37.8m (124.0ft),  Curb-To-Curb Width: 16.1m (52.8ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.16m (75.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $376,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $601,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 5014082,  Location: JCT I87 AND SH 17 (Lat: 41.139792,  Lng: -74.170708),  Route carried "on" structure: Interstate 87,  Year Built: 1953,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 24.35m (79.89ft),  Average Daily Traffic: 118,920 (year 2005),  Truck Traffic: 18%,  Average Future Daily Traffic: 166,488 (year 2025),  Design Load: HS 20+Mod,  Features Intersected: RTE 17, RAMAPO RIVER, MN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.554,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 37.8m (124.0ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.35m (79.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $10,860,000,  Roadway Improvement Cost: $6,304,000,  Total Project Cost: $17,164,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 5513981,  Location: 2.8 MI S OF SPRING VALLEY (Lat: 41.076108,  Lng: -74.050778),  Route carried "on" structure: Other road ,  Year Built: 1956,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 54,896 (year 2003),  Truck Traffic: 6%,  Average Future Daily Traffic: 79,693 (year 2023),  Design Load: HS 20+Mod,  Features Intersected: WILLIAMS ROAD,  Facility Carried by Structure: GSP CONNECTOR NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.058,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,173,000,  Roadway Improvement Cost: $698,000,  Total Project Cost: $1,871,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 5513982,  Location: 2.8 MI S OF SPRING VALLEY (Lat: 41.076108,  Lng: -74.050778),  Route carried "on" structure: Other road ,  Year Built: 1956,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 54,896 (year 2003),  Truck Traffic: 6%,  Average Future Daily Traffic: 79,693 (year 2023),  Design Load: HS 20+Mod,  Features Intersected: WILLIAMS ROAD,  Facility Carried by Structure: GSP CONNECTOR SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.058,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.99m (13.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,182,000,  Roadway Improvement Cost: $703,000,  Total Project Cost: $1,885,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 5514021,  Location: 3.1 MI S OF SPRING VALLEY (Lat: 41.070431,  Lng: -74.053619),  Route carried "on" structure: County highway ,  Year Built: 1956,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 9.20m (30.18ft),  Average Daily Traffic: 4,000 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,600 ,  Design Load: HS 20+Mod,  Features Intersected: RED SCHOOLHOUSE R,  Facility Carried by Structure: GAR ST PK INT NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 88.0 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.20m (30.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,182,000,  Roadway Improvement Cost: $703,000,  Total Project Cost: $1,885,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 5514022,  Location: 3.1 MI S OF SPRING VALLEY (Lat: 41.070419,  Lng: -74.053597),  Route carried "on" structure: County highway ,  Year Built: 1956,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 4,000 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,600 ,  Design Load: HS 20+Mod,  Features Intersected: RED SCHOOLHOUSE R,  Facility Carried by Structure: GAR ST PK INT SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 84.7 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.14m (29.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,182,000,  Roadway Improvement Cost: $703,000,  Total Project Cost: $1,885,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 5514049,  Location: JCT RTS GARDEN ST PKW+I87 (Lat: 41.097578,  Lng: -74.040419),  Route carried "on" structure: Other road ,  Year Built: 1957,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 7.89m (25.89ft),  Average Daily Traffic: 4,500 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,533 ,  Design Load: HS 20,  Features Intersected: RTE I87,  Facility Carried by Structure: GARDEN STATE PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1126.300,  Lanes on structure: 3,  Lanes under structure: 7,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 21.0m (68.9ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.89m (25.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $3,876,000,  Roadway Improvement Cost: $2,250,000,  Total Project Cost: $6,126,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 551405,  Location: 0.3 MI E JCT RTS I87<45 (Lat: 41.097214,  Lng: -74.042067),  Route carried "on" structure: City street ,  Year Built: 1953,  Status: Open,  Structure Length: 9.39m (30.81ft),  Average Daily Traffic: 1,800 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,520 ,  Design Load: HS 20+Mod,  Features Intersected: RTE I87, EXIT 14A RAMP S,  Facility Carried by Structure: SCOTLAND HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: State Toll Authority,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 17.6m (57.7ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.39m (30.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $2,399,000,  Roadway Improvement Cost: $1,393,000,  Total Project Cost: $3,792,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 551406,  Location: 0.7 MI W JCT RTS I87<45 (Lat: 41.099861,  Lng: -74.060544),  Route carried "on" structure: County highway ,  Year Built: 1955,  Status: Open,  Structure Length: 6.00m (19.69ft),  Average Daily Traffic: 1,000 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,400 ,  Design Load: HS 20+Mod,  Features Intersected: RTE I87,  Facility Carried by Structure: HUNGRY HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: State Toll Authority,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.6m (57.7ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,333,000,  Roadway Improvement Cost: $793,000,  Total Project Cost: $2,126,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 5514071,  Location: 4 MI E JCT I87 & US 202 (Lat: 41.103353,  Lng: -74.077003),  Route carried "on" structure: Interstate 87,  Year Built: 1954,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 47,123 (year 2000),  Truck Traffic: 18%,  Average Future Daily Traffic: 74,200 (year 2020),  Design Load: HS 20+Mod,  Features Intersected: MNRR PV LINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 179.516,  Lanes on structure: 3,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.66m (15.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $1,763,000,  Roadway Improvement Cost: $1,048,000,  Total Project Cost: $2,811,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 5514072,  Location: 4 MI E JCT I87 & SH 202 (Lat: 41.104575,  Lng: -74.076686),  Route carried "on" structure: Interstate 87,  Year Built: 1954,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 47,123 (year 2000),  Truck Traffic: 18%,  Average Future Daily Traffic: 74,200 (year 2020),  Design Load: HS 20+Mod,  Features Intersected: MNRR PV LINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 179.516,  Lanes on structure: 3,  Toll: On toll road,  Owner: State Toll Authority,  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.66m (15.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $1,763,000,  Roadway Improvement Cost: $1,048,000,  Total Project Cost: $2,811,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 551408,  Location: 3.1 MI E JCT RTS I87<202 (Lat: 41.111228,  Lng: -74.089694),  Route carried "on" structure: County highway ,  Year Built: 1956,  Status: Open,  Structure Length: 6.33m (20.77ft),  Average Daily Traffic: 4,000 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,600 ,  Design Load: HS 20+Mod,  Features Intersected: RTE I87,  Facility Carried by Structure: COLLEGE ROADCR105
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.9m (58.7ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.33m (20.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $1,620,000,  Roadway Improvement Cost: $964,000,  Total Project Cost: $2,584,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 5514099,  Location: 2.6 MI E JCT RTS I-87<202 (Lat: 41.113239,  Lng: -74.099039),  Route carried "on" structure: Interstate 87,  Year Built: 1953,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 105,410 (year 2005),  Truck Traffic: 18%,  Average Future Daily Traffic: 147,574 (year 2025),  Design Load: HS 20+Mod,  Features Intersected: SPOOK ROCK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.784,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 33.5m (109.9ft),  Skew: 32 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 31.4m (103.0ft),  Out-to-Out Width: 34.4m (112.9ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $927,000,  Roadway Improvement Cost: $551,000,  Total Project Cost: $1,478,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 55141,  Location: 1.9 MI E JCT RTS I-87<202 (Lat: 41.116358,  Lng: -74.112994),  Route carried "on" structure: County highway ,  Year Built: 1956,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 7.04m (23.10ft),  Average Daily Traffic: 2,377 (year 1992),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,097 (year 2012),  Design Load: HS 20+Mod,  Features Intersected: RTE I87,  Facility Carried by Structure: AIRMONT ROAD EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.04m (23.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,799,000,  Roadway Improvement Cost: $1,071,000,  Total Project Cost: $2,870,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 551410A,  Location: AIRMONT RD & I87 NYS TWY (Lat: 41.116483,  Lng: -74.112867),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 1,000 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,303 ,  Design Load: HS 20+Mod,  Features Intersected: RTE I87,  Facility Carried by Structure: AIRMONT ROAD SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.441,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: County Highway Agency,  Approaching Roadway Width: 16.7m (54.8ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.36m (17.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $1,799,000,  Roadway Improvement Cost: $1,071,000,  Total Project Cost: $2,870,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 551442,  Location: 1.6 MI S OF SPRING VALLEY (Lat: 41.091906,  Lng: -74.039514),  Route carried "on" structure: City street ,  Year Built: 1956,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 8.81m (28.90ft),  Average Daily Traffic: 600 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 840 ,  Design Load: HS 20,  Features Intersected: GSP NB TO I87 SB, GSP SB,  Facility Carried by Structure: SCOTLAND HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 79.7 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.81m (28.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $3,364,000,  Roadway Improvement Cost: $1,953,000,  Total Project Cost: $5,317,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 5514439,  Location: 1.2 MI W JCT SH 45 & I87 (Lat: 41.102111,  Lng: -74.069350),  Route carried "on" structure: Interstate 87,  Year Built: 1954,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 4.84m (15.88ft),  Average Daily Traffic: 105,410 (year 2005),  Truck Traffic: 18%,  Average Future Daily Traffic: 147,574 (year 2025),  Design Load: HS 20+Mod,  Features Intersected: SADDLE RV RD-CR73
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.158,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 31.0m (101.7ft),  Skew: 32 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.9m (58.7ft),  Curb-To-Curb Width: 31.0m (101.7ft),  Out-to-Out Width: 34.1m (111.9ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.84m (15.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $3,651,000,  Roadway Improvement Cost: $2,119,000,  Total Project Cost: $5,770,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 552139,  Location: 1.8 MI NE OF SLOATSBURG (Lat: 41.175361,  Lng: -74.166492),  Route carried "on" structure: State lands road 987E,  Year Built: 1961,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 1,540 (year 2002),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,156 (year 2022),  Features Intersected: STONY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.837,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $519,000,  Roadway Improvement Cost: $309,000,  Total Project Cost: $828,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 55214,  Location: 3.5 MI NE OF SLOATSBURG (Lat: 41.190992,  Lng: -74.140072),  Route carried "on" structure: State highway ,  Year Built: 1924,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 664 (year 1992),  Truck Traffic: 8%,  Average Future Daily Traffic: 866 (year 2012),  Design Load: HS 20+Mod,  Features Intersected: LAKE SEBAGO DAM,  Facility Carried by Structure: SEVEN LAKES PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 167.111,  Lanes on structure: 2,  Owner: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 19,  Length of Maximum Span: 3.6m (11.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 74.5 metric tons,  Inventory Rating: 29.3 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.91m (19.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $519,000,  Roadway Improvement Cost: $309,000,  Total Project Cost: $828,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>

Structure Number: 552146,  Location: 3.5 MI NE OF SLOATSBURG (Lat: 41.179842,  Lng: -74.135436),  Route carried "on" structure: Other road ,  Year Built: 1930,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 1 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 1 ,  Features Intersected: PINE MEADOW DAM,  Facility Carried by Structure: PINE MEADOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 3.9m (12.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.0m (3.3ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $333,000,  Roadway Improvement Cost: $198,000,  Total Project Cost: $531,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete

Parts: 1, 2

Discuss this city on our hugely popular New York forum

Back to: Ramapo, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.