Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Raymond, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 302ft / 92.5mTotal length
  • $56,383,000Total costs
  • 41,593Total average daily traffic
  • 3,752Total average daily truck traffic
  • 51,821Total future (year 2029) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Raymond
  • No street view available for this location

New bridges in Raymond, WA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11940-1949
  • 21960-1969
  • 21980-1989
  • 91990-1999
Average Bridge Daily Traffic in Raymond, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Very good
  • 81.3%Good
  • 6.3%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.3%Very good
  • 56.3%Good
  • 25.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Very good
  • 62.5%Good
  • 12.5%Satisfactory
  • 12.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 31.3%Good
  • 18.8%Satisfactory
Find on map >>   Show street view

Structure Number: 1331A,  Location: 4.3 N JCT SR 105 (Lat: 46.750000,  Lng: -123.750278),  Route carried "on" structure: US 101,  Year Built: 1929,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 4,883 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 5,937 (year 2039),  Design Load: H 20,  Features Intersected: SMITH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 102.966,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 31.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.51m (11.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $920,000,  Roadway Improvement Cost: $184,000,  Total Project Cost: $1,840,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1331B,  Location: 5.7 N JCT SR 105 (Lat: 46.768583,  Lng: -123.748833),  Route carried "on" structure: US 101,  Year Built: 1929,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 4,883 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 5,937 (year 2039),  Design Load: H 20,  Features Intersected: ELKHORN CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 105.203,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 34.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.99m (9.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $784,000,  Roadway Improvement Cost: $157,000,  Total Project Cost: $1,568,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 3251A,  Location: 2.5 E JCT US 101 (Lat: 46.663097,  Lng: -123.690111),  Route carried "on" structure: State highway 6,  Year Built: 1947,  Status: Open,  Structure Length: 7.04m (23.10ft),  Average Daily Traffic: 2,871 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,491 (year 2039),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.039,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Serious,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.04m (23.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,848,000,  Roadway Improvement Cost: $370,000,  Total Project Cost: $3,696,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7868A,  Location: 29.4 N JCT SR 4 (Lat: 46.681306,  Lng: -123.733639),  Route carried "on" structure: US 101,  Year Built: 1966,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 18.29m (60.01ft),  Average Daily Traffic: 10,691 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,000 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: S FK WILLAPA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.841,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 20 degrees,  Navigation Control: Yes ( Vertical Clearance: 4.6m (15.1ft), Horizontal Clearance: 29.0m (95.1ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 25.3m (83.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.29m (60.01ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $9,960,000,  Roadway Improvement Cost: $1,992,000,  Total Project Cost: $19,920,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11758A,  Location: 26.9 N JCT SR 4 (Lat: 46.671028,  Lng: -123.777444),  Route carried "on" structure: US 101,  Year Built: 1980,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 8,088 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 9,835 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SKIDMORE SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 89.769,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018,  Bridge Improvement Cost: $1,950,000,  Roadway Improvement Cost: $390,000,  Total Project Cost: $3,901,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 13872A,  Location: 0.7 N JCT SR 6 (Lat: 46.691000,  Lng: -123.732278),  Route carried "on" structure: US 101,  Year Built: 1992,  Status: Open,  Structure Length: 27.37m (89.80ft),  Average Daily Traffic: 8,274 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 10,061 (year 2039),  Design Load: HS 20,  Features Intersected: N FK WILLAPA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 95.177,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 39.3m (128.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 27.37m (89.80ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $7,543,000,  Roadway Improvement Cost: $1,509,000,  Total Project Cost: $15,086,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 80858,  Location: 2.48 S JCT SR 6 (Lat: 46.629194,  Lng: -123.697750),  Route carried "on" structure: County highway 46810,  Year Built: 1991,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 2 (year 2021),  Average Future Daily Traffic: 10 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SO FORK WILLAPA,  Facility Carried by Structure: PEHL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $385,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $770,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 80965,  Location: 4.70 S JCT SR 101 (Lat: 46.629444,  Lng: -123.696139),  Route carried "on" structure: County highway 46730,  Year Built: 1960,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 215 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 400 (year 2039),  Design Load: H 20,  Features Intersected: RUE CREEK,  Facility Carried by Structure: MENLO-SO.FORK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $669,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $1,338,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 80971,  Location: 5.01 S JCT SR 101 (Lat: 46.627778,  Lng: -123.690556),  Route carried "on" structure: County highway 46730,  Year Built: 1991,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 180 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 400 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: RUE CREEK,  Facility Carried by Structure: MENLO SO.FORK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $358,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $717,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82144,  Location: 1.5 E JCT 101 105 (Lat: 46.697000,  Lng: -123.707083),  Route carried "on" structure: County highway 62360,  Year Built: 1987,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 110 (year 2021),  Average Future Daily Traffic: 200 (year 2039),  Features Intersected: ELK CREEK,  Facility Carried by Structure: OVERMEYER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $197,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $394,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 86075,  Location: 4.9 N JCT 101 & 105 (Lat: 46.745806,  Lng: -123.716806),  Route carried "on" structure: County highway 60440,  Year Built: 1993,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 300 (year 2039),  Design Load: HS 20,  Features Intersected: SMITH CREEK,  Facility Carried by Structure: SMITH CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.11m (13.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $702,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $1,404,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86133,  Location: 5.1 N JCT 105-101 (Lat: 46.748972,  Lng: -123.767278),  Route carried "on" structure: County highway 59600,  Year Built: 1992,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 294 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 300 (year 2039),  Design Load: HS 20,  Features Intersected: CLEARWATER CREEK,  Facility Carried by Structure: DIXON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $202,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $405,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86134,  Location: 0.29 E JCT SR 101 (Lat: 46.739833,  Lng: -123.738389),  Route carried "on" structure: County highway 60440,  Year Built: 1994,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 148 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 200 (year 2039),  Design Load: HS 20,  Features Intersected: SMITH CREEK,  Facility Carried by Structure: SMITH CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $572,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $1,144,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86217,  Location: 1.0 S GRAY HAR. CO. (Lat: 46.778333,  Lng: -123.733556),  Route carried "on" structure: County highway 60620,  Year Built: 1996,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 84 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 150 (year 2029),  Design Load: HS 20,  Features Intersected: ELKHORN CREEK,  Facility Carried by Structure: ELKHORN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.48m (14.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $882,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $1,764,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 86299,  Location: 1.2 MILES E. SR 105 (Lat: 46.694361,  Lng: -123.712139),  Route carried "on" structure: County highway 96100,  Year Built: 1997,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 447 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,000 (year 2039),  Design Load: HS 20,  Features Intersected: ELK CREEK,  Facility Carried by Structure: MONOHAN LANDING RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.53m (8.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $498,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $996,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86439,  Location: 2.1 S JCT SR 6 AND SR 101 (Lat: 46.658722,  Lng: -123.730611),  Route carried "on" structure: County highway 94290,  Year Built: 1998,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 323 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 600 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: SO FORK WILLAPA RIVER,  Facility Carried by Structure: FOWLER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.0m (118.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $720,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $1,440,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Raymond, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.