National Bridge Inventory (NBI) Statistics
Number of bridges: 18
Total length: 71 meters (233ft)
Total costs: $1,137,614,000
Total average daily traffic: 115,983
Total average daily truck traffic: 19,023
Total future (year 2025) average daily traffic: 140,420
National Bridge Inventory (NBI) Registered Bridges for Redstone Arsenal

New bridges - Historical Statistics

  • 1940-1949: 7
  • 1950-1959: 0
  • 1960-1969: 8
  • 1970-1979: 1
  • 1980-1989: 0
  • 1990-1999: 2

Reconstructed bridges - Historical Statistics

  • 1960-1969: 2
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 1
  • 2000-2009: 6

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: DAPAMCRED000001,  Location: 0.2 MI E GATE 1 (Lat: 34.660000,  Lng: -86.605000),  Route carried "on" structure: Other road ,  Year Built: 1962,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 14,800 (year 2004),  Truck Traffic: 30%,  Average Future Daily Traffic: 15,000 (year 2028),  Design Load: HS 20,  Features Intersected: HUNTSVILLE SPRING BRANCH,  Facility Carried by Structure: MARTIN ROAD WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.9m (78.4ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 32.4 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: DAPAMCRED000002,  Location: 0.5 MILES WEST OF GATE 1 (Lat: 34.653333,  Lng: -86.613333),  Route carried "on" structure: Other road ,  Year Built: 1962,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 14,800 (year 2003),  Truck Traffic: 15%,  Average Future Daily Traffic: 15,000 (year 2025),  Design Load: HS 20,  Features Intersected: MCDONALD CREEK,  Facility Carried by Structure: MARTIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 26.5m (86.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: DAPAMCRED000003,  Location: 0.8 MILES WEST OF GATE 1 (Lat: 34.650000,  Lng: -86.616667),  Route carried "on" structure: Other road ,  Year Built: 1962,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 14,800 (year 2003),  Truck Traffic: 15%,  Average Future Daily Traffic: 15,000 (year 2025),  Design Load: HS 20,  Features Intersected: STREAM W OF MCDONALD CRK,  Facility Carried by Structure: MARTIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.0m (124.7ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 26.5m (86.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 4.84m (15.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: DAPAMCRED000005,  Location: JUST EAST OF GATE 2 (Lat: 34.595000,  Lng: -86.600000),  Route carried "on" structure: Other road ,  Year Built: 1948,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 3,950 (year 2004),  Average Future Daily Traffic: 5,000 (year 2025),  Features Intersected: STREAM,  Facility Carried by Structure: BUXTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 32.7 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $391,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $587,000 ( Estimate for 2006),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: DAPAMCRED000006,  Location: REDSTONE ARSENAL (Lat: 34.626667,  Lng: -86.630000),  Route carried "on" structure: Other road ,  Year Built: 1997,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 5,000 (year 2003),  Truck Traffic: 15%,  Average Future Daily Traffic: 5,500 (year 2025),  Design Load: HS 20+Mod,  Features Intersected: H'VILLE SPRING BRANCH,  Facility Carried by Structure: PATTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 62.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 4.91m (16.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: DAPAMCRED00001,  Location: REDSTONE ARSENAL (Lat: 34.647450,  Lng: -86.653300),  Route carried "on" structure: Other road ,  Year Built: 1968,  Year Reconstructed: 2008,  Status: Closed,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 6,600 (year 2006),  Truck Traffic: 15%,  Average Future Daily Traffic: 10,000 (year 2028),  Design Load: HS 20,  Features Intersected: MARTIN ROAD,  Facility Carried by Structure: TOFTOY THRUWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.8m (58.4ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Failed,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.16m (20.21ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $1,750,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $1,818,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: DAPAMCRED000012,  Location: 0.6 MI W OF RIDEOUT RD (Lat: 34.645000,  Lng: -86.685000),  Route carried "on" structure: Other road ,  Year Built: 1940,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 7,800 (year 2004),  Truck Traffic: 15%,  Average Future Daily Traffic: 10,000 (year 2025),  Design Load: H 15,  Features Intersected: INDIAN CREEK,  Facility Carried by Structure: MARTIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.5m (123.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: DAPAMCRED000014,  Location: 0.4 MI W OF INDIAN CREEK (Lat: 34.645000,  Lng: -86.698333),  Route carried "on" structure: Other road ,  Year Built: 1940,  Year Reconstructed: 2006,  Status: Not yet open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 7,800 (year 2004),  Truck Traffic: 15%,  Average Future Daily Traffic: 10,000 (year 2025),  Features Intersected: CREEK,  Facility Carried by Structure: MARTIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Excellent,  Culverts: Excellent,  Operating Rating: 32.4 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2006,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $360,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: DAPAMCRED000015,  Location: 1.5 MI S MARTIN ROAD (Lat: 34.618333,  Lng: -86.665000),  Route carried "on" structure: Other road ,  Year Built: 1964,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 10 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 10 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: HUNTSVILLE SPRING BRANCH,  Facility Carried by Structure: DODD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2007,  Underwater Inspection Date: December 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: DAPAMCRED000016,  Location: 3.5 MI WEST PATTON ROAD (Lat: 34.615833,  Lng: -86.698611),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 100 (year 2004),  Truck Traffic: 15%,  Average Future Daily Traffic: 100 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: INDIAN CREEK,  Facility Carried by Structure: TA-1 CENTERLINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Army,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.45m (14.60ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: December 2006,  Underwater Inspection Date: December 2006,  Bridge Improvement Cost: $9,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $33,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: DAPAMCRED000017,  Location: REDSTONE ARSENAL (Lat: 34.655000,  Lng: -86.653333),  Route carried "on" structure: Other road ,  Year Built: 1968,  Status: Open,  Structure Length: 6.55m (21.49ft),  Average Daily Traffic: 1,992 (year 2003),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,000 (year 2025),  Design Load: HS 20,  Features Intersected: TOFTOY THROUGHWAY,  Facility Carried by Structure: NEAL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 7 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.59m (24.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $922,000,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $922,001,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: DAPAMCRED000018,  Location: REDSTONE ARSENAL (Lat: 34.668333,  Lng: -86.663333),  Route carried "on" structure: Other road ,  Year Built: 1968,  Status: Open,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 967 (year 2003),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,000 (year 2025),  Design Load: HS 20,  Features Intersected: TOFTOY THROUGHWAY,  Facility Carried by Structure: MORRIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: Army,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.11m (23.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: DAPAMCRED000019,  Location: REDSTONE ARSENAL (Lat: 34.671667,  Lng: -86.671667),  Route carried "on" structure: Other road ,  Year Built: 1968,  Year Reconstructed: 2003,  Status: Posted for load,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 6,464 (year 2003),  Truck Traffic: 15%,  Average Future Daily Traffic: 8,000 (year 2025),  Design Load: H 20,  Features Intersected: RIDEOUT ROAD,  Facility Carried by Structure: TOFTOY THROUGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: Army,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 32.4 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.79m (19.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: DAPAMCRED000021,  Location: TA-3 1.5 MI W RIDEOUT RD (Lat: 34.669444,  Lng: -86.698056),  Route carried "on" structure: Other road ,  Year Built: 1941,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 100 (year 2004),  Truck Traffic: 15%,  Average Future Daily Traffic: 110 (year 2025),  Design Load: HS 20,  Features Intersected: INDIAN CREEK,  Facility Carried by Structure: HALE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Army,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Inventory Rating: 49.9 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: September 2006,  Underwater Inspection Date: December 2006,  Bridge Improvement Cost: $3,000,  Total Project Cost: $3,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: DAPAMCRED000022,  Location: 0.1 MILE WEST OF GATE 8 (Lat: 34.698333,  Lng: -86.625000),  Route carried "on" structure: Other road ,  Year Built: 1945,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 15,100 (year 2003),  Truck Traffic: 15%,  Average Future Daily Traffic: 20,000 (year 2025),  Design Load: HS 20,  Features Intersected: MCDONALD CREEK,  Facility Carried by Structure: GOSS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: Army,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $1,063,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,594,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: DAPAMCRED000023,  Location: 0.5 MI EAST OF PATTON RD (Lat: 34.673333,  Lng: -86.621667),  Route carried "on" structure: Other road ,  Year Built: 1945,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 300 (year 2003),  Truck Traffic: 15%,  Average Future Daily Traffic: 350 (year 2025),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: HANSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: DAPAMCRED000024,  Location: 0.7 MI EAST PATTON ROAD (Lat: 34.678333,  Lng: -86.620000),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 300 (year 2003),  Truck Traffic: 15%,  Average Future Daily Traffic: 350 (year 2025),  Design Load: HS 20,  Features Intersected: MCDONALD CREEK,  Facility Carried by Structure: HANSEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.89m (19.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: DAPAMCRED000028,  Location: JUST WEST OF GATE 8 (Lat: 34.698333,  Lng: -86.625000),  Route carried "on" structure: Other road ,  Year Built: 1945,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 15,100 (year 2004),  Truck Traffic: 15%,  Average Future Daily Traffic: 20,000 (year 2025),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: GOSS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: Army,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $192,000,000,  Roadway Improvement Cost: $19,200,000,  Total Project Cost: $211,200,000 ( Estimate for 2006),  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular Alabama forum

Back to: Redstone Arsenal, AL, Alabama, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.