U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Richfield, Minnesota (MN) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Richfield, MN, Minnesota, Minnesota forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 53
Total length: 418 meters (1,371ft)
Total costs: $19,443,000
Total average daily traffic: 2,039,603
Total average daily truck traffic: 82,980
National Bridge Inventory (NBI) Registered Bridges for Richfield

New bridges - Historical Statistics

  • 1950-1959: 6
  • 1960-1969: 16
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 4
  • 2000-2009: 27

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Find on map >>

Structure Number: 27291,  Location: 1.5 MI N OF JCT TH 494 (Lat: 44.883497,  Lng: -93.246714),  Route carried "on" structure: County highway 53,  Year Built: 2005,  Status: Open,  Structure Length: 5.11m (16.77ft),  Average Daily Traffic: 10,600 (year 2005),  Average Future Daily Traffic: 10,055 (year 2025),  Design Load: HS 25,  Features Intersected: TH 77
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.8m (81.4ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 0.0m,  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 76.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.60m (18.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,066,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 2793,  Location: 0.1 MI S OF W JCT TH 62 (Lat: 44.888983,  Lng: -93.295703),  Route carried "on" structure: State highway 121,  Year Built: 1964,  Status: Open,  Structure Length: 9.36m (30.71ft),  Average Daily Traffic: 6,000 (year 2004),  Truck Traffic: 9%,  Design Load: H 20,  Features Intersected: I 35W SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.9m (94.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 51.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.30m (33.79ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,277,000,  Total Project Cost: $5,675,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 27931,  Location: 0.1 MI W OF W JCT TH 35W (Lat: 44.890267,  Lng: -93.295653),  Route carried "on" structure: State highway 62,  Year Built: 1964,  Status: Open,  Structure Length: 5.96m (19.55ft),  Average Daily Traffic: 100,000 (year 2004),  Truck Traffic: 2%,  Design Load: HS 20,  Features Intersected: TH 121
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Skew: 31 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 69.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 6.60m (21.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,277,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 27932,  Location: AT THE W JCT TH 62 & 35W (Lat: 44.890411,  Lng: -93.288319),  Route carried "on" structure: State highway 62,  Year Built: 1964,  Status: Open,  Structure Length: 11.46m (37.60ft),  Average Daily Traffic: 50,000 (year 2004),  Truck Traffic: 2%,  Design Load: HS 20,  Features Intersected: I 35W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 11.50m (37.73ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,421,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 27933,  Location: 0.3 MI E OF W JCT TH 62 (Lat: 44.890186,  Lng: -93.288319),  Route carried "on" structure: Interstate 35W,  Year Built: 1964,  Status: Open,  Structure Length: 3.76m (12.34ft),  Average Daily Traffic: 147,000 (year 2004),  Truck Traffic: 4%,  Design Load: HS 20+Mod,  Features Intersected: Lyndale Ave
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.7m (113.8ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 33.2m (108.9ft),  Out-to-Out Width: 35.8m (117.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.50m (14.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,911,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 27934,  Location: 0.6 MI E OF W JCT TH 62 (Lat: 44.890103,  Lng: -93.283111),  Route carried "on" structure: Interstate 35W,  Year Built: 1965,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 156,000 (year 2004),  Truck Traffic: 4%,  Design Load: HS 20+Mod,  Features Intersected: CP Rail
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.1m (111.9ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.3m (53.5ft),  Curb-To-Curb Width: 34.4m (112.9ft),  Out-to-Out Width: 36.6m (120.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 66.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,913,000,  Total Project Cost: $4,478,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 27935,  Location: 0.1 MI W OF E JCT TH 62 (Lat: 44.890397,  Lng: -93.278089),  Route carried "on" structure: Interstate 35W,  Year Built: 1964,  Status: Open,  Structure Length: 4.59m (15.06ft),  Average Daily Traffic: 78,000 (year 2004),  Truck Traffic: 4%,  Design Load: HS 20,  Features Intersected: Nicollet Ave
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.4m (63.6ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 75.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $877,000,  Total Project Cost: $1,185,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 27936,  Location: 0.1 MI W OF E JCT TH 62 (Lat: 44.890100,  Lng: -93.278092),  Route carried "on" structure: Interstate 35W,  Year Built: 1964,  Status: Open,  Structure Length: 4.40m (14.44ft),  Average Daily Traffic: 78,000 (year 2004),  Truck Traffic: 4%,  Design Load: HS 20,  Features Intersected: Nicollet Ave
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.30m (17.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $917,000,  Total Project Cost: $1,452,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 27V11,  Location: 0.5 MI S OF JCT TH 62 (Lat: 44.883333,  Lng: -93.295000),  Route carried "on" structure: Interstate 35W,  Year Built: 1999,  Status: Open,  Structure Length: 3.91m (12.83ft),  Average Daily Traffic: 103,000 (year 2004),  Truck Traffic: 6%,  Design Load: HS 25,  Features Intersected: W 66th St
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 35.4m (116.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 37.2m (122.0ft),  Out-to-Out Width: 39.1m (128.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 50.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 27V65,  Location: 0.1 MI S OF W JCT MN 62 (Lat: 44.888889,  Lng: -93.295556),  Route carried "on" structure: State highway 121,  Year Built: 2007,  Status: Not yet open,  Structure Length: 20.72m (67.98ft),  Average Daily Traffic: 6,000 (year 2004),  Truck Traffic: 9%,  Features Intersected: FAI 35W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 61.0m (200.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 40.8 metric tons,  Inventory Rating: 40.8 metric tons,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 20.70m (67.91ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $3,543,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: 27V66,  Location: 0.4 MI N JCT 66 ST W,  Route carried "on" structure: Ramp Interstate 35W,  Year Built: 2007,  Status: Not yet open,  Structure Length: 15.52m (50.92ft),  Features Intersected: FAI 35W ON RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 61.0m (200.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 40.8 metric tons,  Inventory Rating: 40.8 metric tons,  Structural Evaluation: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 27V67,  Location: 0.1 MI W OF W JCT FAI 35W (Lat: 44.890000,  Lng: -93.295556),  Route carried "on" structure: State highway 62,  Year Built: 2007,  Status: Not yet open,  Structure Length: 4.54m (14.90ft),  Features Intersected: MN 121
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.6m (77.4ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 61.7 metric tons,  Inventory Rating: 40.8 metric tons,  Structural Evaluation: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $1,343,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 27V68,  Location: AT THE W JCT 35W & 62 (Lat: 44.890278,  Lng: -93.288056),  Route carried "on" structure: State highway 62,  Year Built: 2007,  Status: Not yet open,  Structure Length: 26.59m (87.24ft),  Features Intersected: FAI 35W, MN 121, RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 72.5m (237.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 57.2 metric tons,  Inventory Rating: 40.8 metric tons,  Structural Evaluation: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 26.60m (87.27ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $7,054,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 27V69,  Location: 0.1 MI W OF W JCT FAI 35W (Lat: 44.888889,  Lng: -93.295556),  Route carried "on" structure: Ramp State highway 121,  Year Built: 2007,  Status: Not yet open,  Structure Length: 4.55m (14.93ft),  Features Intersected: MN121
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 63.5 metric tons,  Inventory Rating: 40.8 metric tons,  Structural Evaluation: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $981,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: 27V7,  Location: 0.3 MI E OF W JCT 35W-62,  Route carried "on" structure: State highway 62,  Year Built: 2007,  Status: Not yet open,  Structure Length: 3.75m (12.30ft),  Features Intersected: LYNDALE AVE SO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.2m (115.5ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 79.8 metric tons,  Inventory Rating: 40.8 metric tons,  Structural Evaluation: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 27V71,  Location: 0.3 MI E OF W JCT MN 62 (Lat: 44.890000,  Lng: -93.288056),  Route carried "on" structure: Interstate 35W,  Year Built: 2007,  Status: Not yet open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 147,000 (year 2004),  Truck Traffic: 4%,  Features Intersected: LYNDALE AVE SO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.1m (111.9ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.2m (115.5ft),  Curb-To-Curb Width: 34.1m (111.9ft),  Out-to-Out Width: 46.3m (151.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 79.8 metric tons,  Inventory Rating: 40.8 metric tons,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: 27V72,  Location: 0.3 MI E OF W JCT MN 62,  Route carried "on" structure: State highway 62,  Year Built: 2007,  Status: Not yet open,  Structure Length: 3.75m (12.30ft),  Features Intersected: LYNDALE AVE SO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.2m (115.5ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 78.0 metric tons,  Inventory Rating: 40.8 metric tons,  Structural Evaluation: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: 27V73,  Location: 0.3 MI E OF JCT 35W & 62,  Route carried "on" structure: Ramp Interstate 35W,  Year Built: 2007,  Status: Not yet open,  Structure Length: 12.79m (41.96ft),  Average Daily Traffic: 1 (year ),  Features Intersected: RAMP (62 EB TO LYNDALE)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 51.8m (169.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 40.8 metric tons,  Inventory Rating: 40.8 metric tons,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 27V74A,  Location: 0.6 MI E OF W JCT MN 62 (Lat: 44.890000,  Lng: -93.283056),  Route carried "on" structure: Interstate 35W,  Year Built: 2007,  Status: Not yet open,  Structure Length: 1.91m (6.27ft),  Average Daily Traffic: 156,000 (year 2004),  Truck Traffic: 4%,  Features Intersected: CP RAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 44.3m (145.3ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 44.3m (145.3ft),  Out-to-Out Width: 46.2m (151.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 53.5 metric tons,  Inventory Rating: 40.8 metric tons,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: 27V74B,  Location: 0.6 MI E OF W JCT FAI 35W,  Route carried "on" structure: State highway 62,  Year Built: 2007,  Status: Not yet open,  Structure Length: 1.91m (6.27ft),  Features Intersected: CP RAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 53.5 metric tons,  Inventory Rating: 40.8 metric tons,  Structural Evaluation: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: 27V74C,  Location: 0.6 MI E OF W JCT FAI 35W,  Route carried "on" structure: State highway 62,  Year Built: 2007,  Status: Not yet open,  Structure Length: 1.91m (6.27ft),  Average Daily Traffic: 1 (year ),  Features Intersected: CP RAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 23.5m (77.1ft),  Out-to-Out Width: 24.3m (79.7ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 53.5 metric tons,  Inventory Rating: 40.8 metric tons,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Structure Number: 27V78,  Location: AT THE JCT W NICOLLET AVE,  Route carried "on" structure: State highway 62,  Year Built: 2007,  Status: Not yet open,  Structure Length: 2.76m (9.06ft),  Features Intersected: NICOLLET AVE SO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.1m (82.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 61.7 metric tons,  Inventory Rating: 40.8 metric tons,  Structural Evaluation: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $780,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 7268,  Location: 0.7 MI W OF JCT TH 35W (Lat: 44.890575,  Lng: -93.308667),  Route carried "on" structure: County highway 32,  Year Built: 1962,  Status: Open,  Structure Length: 4.64m (15.22ft),  Average Daily Traffic: 14,700 (year 2005),  Design Load: H 20,  Features Intersected: TH 62
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.6m (64.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.10m (16.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $971,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $1,107,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 908,  Location: 0.5 MI W OF JCT TH 77 (Lat: 44.862136,  Lng: -93.257889),  Route carried "on" structure: City street 115,  Year Built: 1959,  Status: Open,  Structure Length: 5.66m (18.57ft),  Average Daily Traffic: 12,100 (year 2005),  Design Load: HS 20,  Features Intersected: I 494,  Facility Carried by Structure: 12th Ave S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 17.8m (58.4ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $774,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $901,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 9195,  Location: 1.5 MI N OF JCT TH 494 (Lat: 44.883497,  Lng: -93.246714),  Route carried "on" structure: County highway 53,  Year Built: 1958,  Status: Open,  Structure Length: 5.66m (18.57ft),  Average Daily Traffic: 10,600 (year 2005),  Design Load: HS 20,  Features Intersected: TH 77
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.0m (55.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,162,000,  Total Project Cost: $1,080,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 9796,  Location: 0.3 MI N OF JCT TH 494 (Lat: 44.865481,  Lng: -93.298744),  Route carried "on" structure: City street 361,  Year Built: 1959,  Status: Open,  Structure Length: 5.71m (18.73ft),  Average Daily Traffic: 23,800 (year 2005),  Design Load: HS 20,  Features Intersected: I 35W,  Facility Carried by Structure: W 76th St
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.8m (61.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.6m (64.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Good,  Operating Rating: 80.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.80m (81.36ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $3,470,000,  Total Project Cost: $3,565,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 99147,  Location: 0.1 MI W OF W JCT TH 35W (Lat: 44.888983,  Lng: -93.295703),  Route carried "on" structure: State highway 62,  Year Built: 1994,  Status: Open,  Structure Length: 6.29m (20.64ft),  Average Daily Traffic: 50,000 (year 2004),  Truck Traffic: 2%,  Design Load: HS 20,  Features Intersected: TH 121
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.5m (83.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 27291,  Location: 1.5 MI N OF JCT TH 494 (Lat: 44.883497,  Lng: -93.246714),  Route carried "under" structure: State highway 77,  Year Built: 2005,  Structure Length: 5.11m (16.77ft),  Average Daily Traffic: 72,000 (year 2004),  Truck Traffic: 4%,  Features Intersected: TH 77,  Facility Carried by Structure: WB 66th ST(CSAH 53
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.8m (81.4ft)

Find on map >>

Structure Number: 2793,  Location: 0.1 MI S OF W JCT TH 62 (Lat: 44.888983,  Lng: -93.295703),  Route carried "under" structure: Interstate 35W,  Year Built: 1964,  Structure Length: 9.36m (30.71ft),  Average Daily Traffic: 51,500 (year 2004),  Truck Traffic: 6%,  Features Intersected: I 35W SB,  Facility Carried by Structure: TH 121 NB
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.9m (94.8ft)

Find on map >>

Structure Number: 27931,  Location: 0.1 MI W OF W JCT TH 35W (Lat: 44.890267,  Lng: -93.295653),  Route carried "under" structure: State highway 121,  Year Built: 1964,  Structure Length: 5.96m (19.55ft),  Average Daily Traffic: 12,000 (year 2004),  Truck Traffic: 9%,  Features Intersected: TH 121,  Facility Carried by Structure: TH 62
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>

Structure Number: 27932,  Location: AT THE W JCT TH 62 & 35W (Lat: 44.890411,  Lng: -93.288319),  Route carried "under" structure: Interstate 35W,  Year Built: 1964,  Structure Length: 11.46m (37.60ft),  Average Daily Traffic: 103,000 (year 2004),  Truck Traffic: 6%,  Features Intersected: I 35W,  Facility Carried by Structure: TH 62 EB
Minimum Vertical Clearance: 4.69m (15.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>

Structure Number: 27933,  Location: 0.3 MI E OF W JCT TH 62 (Lat: 44.890186,  Lng: -93.288319),  Route carried "under" structure: City street 363,  Year Built: 1964,  Structure Length: 3.76m (12.34ft),  Average Daily Traffic: 14,400 (year 2005),  Features Intersected: Lyndale Ave,  Facility Carried by Structure: I 35W
Minimum Vertical Clearance: 4.69m (15.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>

Structure Number: 27935,  Location: 0.1 MI W OF E JCT TH 62 (Lat: 44.890397,  Lng: -93.278089),  Route carried "under" structure: County highway 52,  Year Built: 1964,  Structure Length: 4.59m (15.06ft),  Average Daily Traffic: 12,600 (year 2005),  Features Intersected: Nicollet Ave,  Facility Carried by Structure: I 35W SB
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.4m (63.6ft)

Find on map >>

Structure Number: 27936,  Location: 0.1 MI W OF E JCT TH 62 (Lat: 44.890100,  Lng: -93.278092),  Route carried "under" structure: County highway 52,  Year Built: 1964,  Structure Length: 4.40m (14.44ft),  Average Daily Traffic: 12,600 (year 2005),  Features Intersected: Nicollet Ave,  Facility Carried by Structure: I 35W NB
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>

Structure Number: 27V11,  Location: 0.5 MI S OF JCT TH 62 (Lat: 44.883333,  Lng: -93.295000),  Route carried "under" structure: County highway 53,  Year Built: 1999,  Structure Length: 3.91m (12.83ft),  Average Daily Traffic: 24,800 (year 2005),  Features Intersected: W 66th St,  Facility Carried by Structure: I 35W
Minimum Vertical Clearance: 0.50m (1.64ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.2m (59.7ft)

Find on map >>

Structure Number: 27V65,  Location: 0.1 MI S OF W JCT MN 62 (Lat: 44.888889,  Lng: -93.295556),  Route carried "under" structure: Interstate 35W,  Year Built: 2007,  Structure Length: 20.72m (67.98ft),  Average Daily Traffic: 51,500 (year 2004),  Truck Traffic: 6%,  Features Intersected: FAI 35W,  Facility Carried by Structure: MN 121 NB
Minimum Vertical Clearance: 0.71m (2.33ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 61.0m (200.1ft)

Structure Number: 27V66,  Location: 0.4 MI N JCT 66 ST W,  Route carried "under" structure: Ramp State highway 62,  Year Built: 2007,  Structure Length: 15.52m (50.92ft),  Features Intersected: FAI 35W ON RAMP,  Facility Carried by Structure: FAI 35W OFF RAMP
Minimum Vertical Clearance: 0.50m (1.64ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 61.0m (200.1ft)

Find on map >>

Structure Number: 27V67,  Location: 0.1 MI W OF W JCT FAI 35W (Lat: 44.890000,  Lng: -93.295556),  Route carried "under" structure: State highway 121,  Year Built: 2007,  Structure Length: 4.54m (14.90ft),  Features Intersected: MN 121,  Facility Carried by Structure: MN 62 WB
Minimum Vertical Clearance: 5.73m (18.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.6m (77.4ft)

Find on map >>

Structure Number: 27V68,  Location: AT THE W JCT 35W & 62 (Lat: 44.890278,  Lng: -93.288056),  Route carried "under" structure: Interstate 35W,  Year Built: 2007,  Structure Length: 26.59m (87.24ft),  Features Intersected: FAI 35W, MN 121, RAMP,  Facility Carried by Structure: MN 62 EB
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 72.5m (237.9ft)

Find on map >>

Structure Number: 27V68,  Location: AT THE W JCT 35W & 62 (Lat: 44.890278,  Lng: -93.288056),  Route carried "under" structure: Ramp State highway 62,  Year Built: 2007,  Structure Length: 26.59m (87.24ft),  Features Intersected: FAI 35W, MN 121, RAMP
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 72.5m (237.9ft)

Find on map >>

Structure Number: 27V68,  Location: AT THE W JCT 35W & 62 (Lat: 44.890278,  Lng: -93.288056),  Route carried "under" structure: State highway 121,  Year Built: 2007,  Structure Length: 26.59m (87.24ft),  Features Intersected: FAI 35W, MN 121, RAMP,  Facility Carried by Structure: MN 62 EB
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 72.5m (237.9ft)

Find on map >>

Structure Number: 27V69,  Location: 0.1 MI W OF W JCT FAI 35W (Lat: 44.888889,  Lng: -93.295556),  Route carried "under" structure: State highway 121,  Year Built: 2007,  Structure Length: 4.55m (14.93ft),  Features Intersected: MN121
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Structure Number: 27V7,  Location: 0.3 MI E OF W JCT 35W-62,  Route carried "under" structure: City street 363,  Year Built: 2007,  Structure Length: 3.75m (12.30ft),  Features Intersected: LYNDALE AVE SO,  Facility Carried by Structure: MN 62 WB
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.2m (115.5ft)

Find on map >>

Structure Number: 27V71,  Location: 0.3 MI E OF W JCT MN 62 (Lat: 44.890000,  Lng: -93.288056),  Route carried "under" structure: City street 363,  Year Built: 2007,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 14,400 (year 2005),  Features Intersected: LYNDALE AVE SO,  Facility Carried by Structure: FAI 35W
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.2m (115.5ft)

Structure Number: 27V72,  Location: 0.3 MI E OF W JCT MN 62,  Route carried "under" structure: City street 363,  Year Built: 2007,  Structure Length: 3.75m (12.30ft),  Features Intersected: LYNDALE AVE SO,  Facility Carried by Structure: MN 62 EB
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.2m (115.5ft)

Structure Number: 27V73,  Location: 0.3 MI E OF JCT 35W & 62,  Route carried "under" structure: Ramp State highway 62,  Year Built: 2007,  Structure Length: 12.79m (41.96ft),  Average Daily Traffic: 1 (year ),  Features Intersected: RAMP (62 EB TO LYNDALE)
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 51.8m (169.9ft)

Structure Number: 27V78,  Location: AT THE JCT W NICOLLET AVE,  Route carried "under" structure: County highway 52,  Year Built: 2007,  Structure Length: 2.76m (9.06ft),  Features Intersected: NICOLLET AVE SO,  Facility Carried by Structure: MN 62 EB
Minimum Vertical Clearance: 6.89m (22.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.1m (82.3ft)

Find on map >>

Structure Number: 7268,  Location: 0.7 MI W OF JCT TH 35W (Lat: 44.890575,  Lng: -93.308667),  Route carried "under" structure: State highway 62,  Year Built: 1962,  Structure Length: 4.64m (15.22ft),  Average Daily Traffic: 100,000 (year 2004),  Truck Traffic: 2%,  Features Intersected: TH 62,  Facility Carried by Structure: Penn Ave (CSAH 32)
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>

Structure Number: 908,  Location: 0.5 MI W OF JCT TH 77 (Lat: 44.862136,  Lng: -93.257889),  Route carried "under" structure: Interstate 494,  Year Built: 1959,  Structure Length: 5.66m (18.57ft),  Average Daily Traffic: 132,000 (year 2004),  Truck Traffic: 5%,  Features Intersected: I 494,  Facility Carried by Structure: 12th Ave S
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.8m (58.4ft)

Find on map >>

Structure Number: 9195,  Location: 1.5 MI N OF JCT TH 494 (Lat: 44.883497,  Lng: -93.246714),  Route carried "under" structure: State highway 77,  Year Built: 1958,  Structure Length: 5.66m (18.57ft),  Average Daily Traffic: 72,000 (year 2004),  Truck Traffic: 4%,  Features Intersected: TH 77,  Facility Carried by Structure: EB 66th St(CSAH 53
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.0m (55.8ft)

Find on map >>

Structure Number: 9796,  Location: 0.3 MI N OF JCT TH 494 (Lat: 44.865481,  Lng: -93.298744),  Route carried "under" structure: Interstate 35W,  Year Built: 1959,  Structure Length: 5.71m (18.73ft),  Average Daily Traffic: 99,000 (year 2004),  Truck Traffic: 6%,  Features Intersected: I 35W,  Facility Carried by Structure: W 76th St
Minimum Vertical Clearance: 4.63m (15.19ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.8m (61.7ft)

Find on map >>

Structure Number: 9888,  Location: 0.6 MI N OF JCT TH 494 (Lat: 44.871667,  Lng: -93.298333),  Route carried "under" structure: Interstate 35W,  Year Built: 1960,  Structure Length: 4.87m (15.98ft),  Average Daily Traffic: 107,000 (year 2004),  Truck Traffic: 6%,  Features Intersected: I 35W,  Facility Carried by Structure: PED at 73rd Ave
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.0m (75.5ft)

Find on map >>

Structure Number: 99147,  Location: 0.1 MI W OF W JCT TH 35W (Lat: 44.888983,  Lng: -93.295703),  Route carried "under" structure: State highway 121,  Year Built: 1994,  Structure Length: 6.29m (20.64ft),  Average Daily Traffic: 12,000 (year 2004),  Truck Traffic: 9%,  Features Intersected: TH 121,  Facility Carried by Structure: Temp TH 62 WB
Minimum Vertical Clearance: 5.67m (18.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.5m (83.7ft)

Discuss this city on our hugely popular Minnesota forum

Back to: Richfield, MN, Minnesota, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.