![]() |
Bridge Statistics for Richland, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Richland, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 24 Total length: 96 meters (315ft) Total costs: $17,881,000 Total average daily traffic: 142,376 Total average daily truck traffic: 28,871 National Bridge Inventory (NBI) Registered Bridges for Richland
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 100035, Location: 2.9 MI SW JCT RTS 3 + 13 (Lat: 43.529692, Lng: -76.205719), Route carried "on" structure: State highway 3, Year Built: 1934, Status: Open, Structure Length: 0.73m (2.40ft), Average Daily Traffic: 4,724 (year 1998), Truck Traffic: 10%, Average Future Daily Traffic: 5,228 (year 2018), Features Intersected: SNAKE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 34.912, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.7m (31.8ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.7m (22.0ft), Curb-To-Curb Width: 9.7m (31.8ft), Out-to-Out Width: 16.9m (55.4ft) Condition: Superstructure: Good, Substructure: Satisfactory, Channel: Good, Operating Rating: 74.5 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.73m (2.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $266,000, Roadway Improvement Cost: $158,000, Total Project Cost: $424,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100036, Location: 1.7 MI S JCT RTS 3 & 13 (Lat: 43.542783, Lng: -76.192369), Route carried "on" structure: State highway 3, Year Built: 1994, Status: Open, Structure Length: 3.10m (10.17ft), Average Daily Traffic: 4,724 (year 1998), Truck Traffic: 10%, Average Future Daily Traffic: 5,228 (year 2018), Design Load: HS 25, Features Intersected: GRINDSTONE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 34.901, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 30.4m (99.7ft), Curb-To-Curb Width: 10.9m (35.8ft), Out-to-Out Width: 11.5m (37.7ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Inventory Rating: 66.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.10m (10.17ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $266,000, Roadway Improvement Cost: $158,000, Total Project Cost: $424,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 100037, Location: .1 MI N JCT SH 3 & SH 13 (Lat: 43.567617, Lng: -76.187586), Route carried "on" structure: State highway 3, Year Built: 2000, Status: Open, Structure Length: 10.64m (34.91ft), Average Daily Traffic: 3,596 (year 1998), Truck Traffic: 10%, Average Future Daily Traffic: 3,979 (year 2018), Design Load: HS 25, Features Intersected: SALMON RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 45.321, Lanes on structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.4m (40.7ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 45.1m (148.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 12.4m (40.7ft), Out-to-Out Width: 16.5m (54.1ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Excellent, Inventory Rating: 61.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 10.64m (34.91ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: October 2006, Underwater Inspection Date: June 2005, Bridge Improvement Cost: $266,000, Roadway Improvement Cost: $158,000, Total Project Cost: $424,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 100038, Location: .2 MI N JCT SH 3 & SH 13 (Lat: 43.569917, Lng: -76.187147), Route carried "on" structure: State highway 3, Year Built: 2000, Status: Open, Structure Length: 10.64m (34.91ft), Average Daily Traffic: 3,596 (year 1998), Truck Traffic: 10%, Average Future Daily Traffic: 3,979 (year 2018), Design Load: HS 25, Features Intersected: SALMON RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 45.321, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 45.1m (148.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 13.1m (43.0ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Excellent, Operating Rating: 77.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 10.64m (34.91ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $266,000, Roadway Improvement Cost: $158,000, Total Project Cost: $424,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 100039, Location: 1.9 MI NE JCT SH 3 & SH13 (Lat: 43.590228, Lng: -76.171303), Route carried "on" structure: State highway 3, Year Built: 2002, Status: Open, Structure Length: 2.41m (7.91ft), Average Daily Traffic: 1,800 (year 1997), Truck Traffic: 10%, Average Future Daily Traffic: 1,992 (year 2017), Design Load: HS 25, Features Intersected: DEER CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 45.363, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.5m (37.7ft), Curb-To-Curb Width: 10.3m (33.8ft), Out-to-Out Width: 11.3m (37.1ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Excellent, Operating Rating: 83.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 58.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.41m (7.91ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: December 2006, Underwater Inspection Date: June 1997, Bridge Improvement Cost: $586,000, Roadway Improvement Cost: $349,000, Total Project Cost: $935,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 103186, Location: 2.3 MI N EXIT 34 OF I81 (Lat: 43.492431, Lng: -76.119408), Route carried "on" structure: City street , Year Built: 1961, Year Reconstructed: 1974, Status: Open, Structure Length: 3.90m (12.80ft), Average Daily Traffic: 179 (year 2000), Truck Traffic: 6%, Average Future Daily Traffic: 225 (year 2020), Design Load: HS 20, Features Intersected: RTE I81, Facility Carried by Structure: FRANK LACY ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 5.4m (17.7ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 13.4m (44.0ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 60.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.90m (12.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $460,000, Roadway Improvement Cost: $267,000, Total Project Cost: $727,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 1031871, Location: EXIT 35 OF I81 (Lat: 43.506800, Lng: -76.121842), Route carried "on" structure: Interstate 81, Year Built: 1961, Year Reconstructed: 1974, Status: Open, Structure Length: 3.90m (12.80ft), Average Daily Traffic: 7,582 (year 1999), Truck Traffic: 23%, Average Future Daily Traffic: 11,574 (year 2019), Design Load: HS 20, Features Intersected: COUNTY ROAD 28 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 30.439, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 14.0m (45.9ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 25.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.90m (12.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $901,000, Roadway Improvement Cost: $536,000, Total Project Cost: $1,437,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1031872, Location: EXIT 35 OF I81 (Lat: 43.506831, Lng: -76.121061), Route carried "on" structure: Interstate 81, Year Built: 1961, Year Reconstructed: 1974, Status: Open, Structure Length: 3.90m (12.80ft), Average Daily Traffic: 7,582 (year 1999), Truck Traffic: 23%, Average Future Daily Traffic: 11,574 (year 2019), Design Load: HS 20, Features Intersected: COUNTY ROAD 28 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 30.439, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.7m (44.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 14.0m (45.9ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Poor, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 25.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.90m (12.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $901,000, Roadway Improvement Cost: $536,000, Total Project Cost: $1,437,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1031881, Location: 1 MI S I81 SB & SH 13 (Lat: 43.538339, Lng: -76.117456), Route carried "on" structure: Interstate 81, Year Built: 1961, Year Reconstructed: 1991, Status: Open, Structure Length: 3.90m (12.80ft), Average Daily Traffic: 7,582 (year 1999), Truck Traffic: 23%, Average Future Daily Traffic: 11,574 (year 2019), Design Load: HS 20, Features Intersected: HALSEY ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 35.910, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 14.3m (46.9ft), Curb-To-Curb Width: 12.0m (39.4ft), Out-to-Out Width: 12.9m (42.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.90m (12.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $1,091,000, Roadway Improvement Cost: $649,000, Total Project Cost: $1,740,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1031882, Location: 1 MI S I81 NB & SH 13 (Lat: 43.538056, Lng: -76.116247), Route carried "on" structure: Interstate 81, Year Built: 1961, Year Reconstructed: 1991, Status: Open, Structure Length: 3.90m (12.80ft), Average Daily Traffic: 7,582 (year 1999), Truck Traffic: 23%, Average Future Daily Traffic: 11,574 (year 2019), Design Load: HS 20, Features Intersected: HALSEY ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 35.910, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 14.0m (45.9ft), Curb-To-Curb Width: 12.0m (39.4ft), Out-to-Out Width: 13.0m (42.7ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 63.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.90m (12.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $1,096,000, Roadway Improvement Cost: $652,000, Total Project Cost: $1,748,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 103192, Location: 2 MI N JCT EXIT 36 OF I81 (Lat: 43.586286, Lng: -76.107792), Route carried "on" structure: City street , Year Built: 1961, Year Reconstructed: 1974, Status: Open, Structure Length: 4.26m (13.98ft), Average Daily Traffic: 419 (year 1999), Truck Traffic: 6%, Average Future Daily Traffic: 526 (year 2019), Design Load: HS 20, Features Intersected: RTE I81, Facility Carried by Structure: CANNING FACTRY RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 5.4m (17.7ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 14.3m (46.9ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 39.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.26m (13.98ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $1,852,000, Roadway Improvement Cost: $1,101,000, Total Project Cost: $2,953,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 106477, Location: 2.3 MI N EXIT 34 OF I81 (Lat: 43.492842, Lng: -76.121225), Route carried "on" structure: City street , Year Built: 1961, Year Reconstructed: 1974, Status: Open, Structure Length: 3.87m (12.70ft), Average Daily Traffic: 179 (year 2000), Truck Traffic: 6%, Average Future Daily Traffic: 225 (year 2020), Design Load: HS 20, Features Intersected: RTE I81, Facility Carried by Structure: FRANK LACY ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 5.4m (17.7ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 13.4m (44.0ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.87m (12.70ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $456,000, Roadway Improvement Cost: $264,000, Total Project Cost: $720,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 106478, Location: 2 MI N EXIT 36 OF I81 (Lat: 43.586228, Lng: -76.109300), Route carried "on" structure: City street , Year Built: 1961, Year Reconstructed: 1974, Status: Open, Structure Length: 4.20m (13.78ft), Average Daily Traffic: 452 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 568 (year 2022), Design Load: HS 20, Features Intersected: RTE I81, Facility Carried by Structure: CANNING FACTRY RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 5.4m (17.7ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 14.3m (46.9ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 42.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 25.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.20m (13.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $456,000, Roadway Improvement Cost: $264,000, Total Project Cost: $720,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331375, Location: 3.7 MI. SW. OF PULASKI (Lat: 43.526906, Lng: -76.176689), Route carried "on" structure: County highway , Year Built: 1985, Status: Open, Structure Length: 1.21m (3.97ft), Average Daily Traffic: 764 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 960 (year 2026), Features Intersected: GRINDSTONE CREEK, Facility Carried by Structure: SALISBURY ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.8m (38.7ft), Curb-To-Curb Width: 8.8m (28.9ft), Out-to-Out Width: 9.1m (29.9ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Inventory Rating: 71.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.21m (3.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $122,000, Roadway Improvement Cost: $71,000, Total Project Cost: $193,000 ( Estimate for 2007), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331376, Location: 4.5 MI NW OF ALTMAR (Lat: 43.570986, Lng: -76.034117), Route carried "on" structure: County highway , Year Built: 1930, Year Reconstructed: 1968, Status: Open, Structure Length: 1.15m (3.77ft), Average Daily Traffic: 1,667 (year 2000), Truck Traffic: 8%, Average Future Daily Traffic: 1,923 (year 2020), Design Load: HS 20, Features Intersected: TROUT BROOK, Facility Carried by Structure: RICHLND-ORWELL RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.9m (35.8ft), Curb-To-Curb Width: 8.9m (29.2ft), Out-to-Out Width: 9.1m (29.9ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Good, Operating Rating: 40.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 26.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.15m (3.77ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $228,000, Roadway Improvement Cost: $136,000, Total Project Cost: $364,000 ( Estimate for 2007), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331387, Location: 4 MI SW OF PULASKI (Lat: 43.513156, Lng: -76.162978), Route carried "on" structure: County highway , Year Built: 1934, Year Reconstructed: 1960, Status: Open, Structure Length: 1.40m (4.59ft), Average Daily Traffic: 1,024 (year 2000), Truck Traffic: 6%, Average Future Daily Traffic: 1,286 (year 2020), Features Intersected: GRINDSTONE CREEK, Facility Carried by Structure: CR 41 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 5.7m (18.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.8m (42.0ft), Curb-To-Curb Width: 6.0m (19.7ft), Out-to-Out Width: 6.9m (22.6ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Fair, Operating Rating: 39.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.40m (4.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $209,000, Roadway Improvement Cost: $124,000, Total Project Cost: $333,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331388, Location: 4.8 MI SW OF PULASKI (Lat: 43.495286, Lng: -76.150744), Route carried "on" structure: County highway , Year Built: 1930, Year Reconstructed: 1961, Status: Posted for load, Structure Length: 1.70m (5.58ft), Average Daily Traffic: 404 (year 2000), Truck Traffic: 6%, Average Future Daily Traffic: 507 (year 2020), Features Intersected: GRINDSTONE CREEK, Facility Carried by Structure: COUNTY ROAD 41A Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.8m (42.0ft), Curb-To-Curb Width: 8.7m (28.5ft), Out-to-Out Width: 9.1m (29.9ft) Condition: Deck: Poor, Superstructure: Fair, Substructure: Serious, Channel: Satisfactory, Operating Rating: 63.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Meets minimum limits, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 1.70m (5.58ft), Designated Inspection Frequency: Every 12 months, Inspection Date: May 2007, Bridge Improvement Cost: $337,000, Roadway Improvement Cost: $201,000, Total Project Cost: $538,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 335823, Location: 1.9 MI SE OF PULASKI (Lat: 43.549850, Lng: -76.094031), Route carried "on" structure: County highway , Year Built: 1966, Status: Open, Structure Length: 6.58m (21.59ft), Average Daily Traffic: 3,874 (year 2000), Truck Traffic: 8%, Average Future Daily Traffic: 4,469 (year 2020), Design Load: HS 20, Features Intersected: SALMON RIVER, Facility Carried by Structure: LEHIGH ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 3, Length of Maximum Span: 21.3m (69.9ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 9.3m (30.5ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Satisfactory, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.58m (21.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $1,331,000, Roadway Improvement Cost: $791,000, Total Project Cost: $2,122,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 336583, Location: 2.2 MI NW OF PULASKI (Lat: 43.584786, Lng: -76.158806), Route carried "on" structure: City street , Year Built: 1950, Status: Open, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 302 (year 1999), Truck Traffic: 6%, Average Future Daily Traffic: 379 (year 2019), Features Intersected: LITTLE DEER CREEK, Facility Carried by Structure: CLARK ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 5.4m (17.7ft), Material/Design: Steel, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.0m (23.0ft), Curb-To-Curb Width: 7.1m (23.3ft), Out-to-Out Width: 8.0m (26.2ft) Condition: Superstructure: Very good, Substructure: Satisfactory, Channel: Very good, Operating Rating: 74.7 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.79m (2.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $137,000, Roadway Improvement Cost: $81,000, Total Project Cost: $218,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 103186, Location: 2.3 MI N EXIT 34 OF I81 (Lat: 43.492431, Lng: -76.119408), Route carried "under" structure: Interstate 81, Year Built: 1961, Structure Length: 3.90m (12.80ft), Average Daily Traffic: 19,426 (year 2000), Truck Traffic: 23%, Features Intersected: RTE I81, Facility Carried by Structure: FRANK LACY ROAD Minimum Vertical Clearance: 5.25m (17.22ft), Kilometerpoint: 28.833, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 13.4m (44.0ft) Find on map >>
Structure Number: 103192, Location: 2 MI N JCT EXIT 36 OF I81 (Lat: 43.586286, Lng: -76.107792), Route carried "under" structure: Interstate 81, Year Built: 1961, Structure Length: 4.26m (13.98ft), Average Daily Traffic: 15,164 (year 1999), Truck Traffic: 23%, Features Intersected: RTE I81, Facility Carried by Structure: CANNING FACTRY RD Minimum Vertical Clearance: 5.02m (16.47ft), Kilometerpoint: 39.404, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 14.3m (46.9ft) Find on map >>
Structure Number: 106477, Location: 2.3 MI N EXIT 34 OF I81 (Lat: 43.492842, Lng: -76.121225), Route carried "under" structure: Interstate 81, Year Built: 1961, Structure Length: 3.87m (12.70ft), Average Daily Traffic: 19,426 (year 2000), Truck Traffic: 23%, Features Intersected: RTE I81, Facility Carried by Structure: FRANK LACY ROAD Minimum Vertical Clearance: 0.51m (1.67ft), Kilometerpoint: 28.882, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 13.4m (44.0ft) Find on map >>
Structure Number: 106478, Location: 2 MI N EXIT 36 OF I81 (Lat: 43.586228, Lng: -76.109300), Route carried "under" structure: Interstate 81, Year Built: 1961, Structure Length: 4.20m (13.78ft), Average Daily Traffic: 15,164 (year 1999), Truck Traffic: 23%, Features Intersected: RTE I81, Facility Carried by Structure: CANNING FACTRY RD Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 39.356, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 14.3m (46.9ft) Find on map >>
Structure Number: 703189, Location: SE CORNER OF PULASKI (Lat: 43.558947, Lng: -76.114000), Route carried "under" structure: Interstate 81, Year Built: 1961, Structure Length: 8.04m (26.38ft), Average Daily Traffic: 15,164 (year 1999), Truck Traffic: 23%, Features Intersected: RTE I81, Facility Carried by Structure: CSX TRANSPRTATION Minimum Vertical Clearance: 4.97m (16.31ft), Kilometerpoint: 36.299, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 14.0m (45.9ft) Discuss this city on our hugely popular New York forum Back to: Richland, NY, New York, All US cities.
|
![]() |