U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Riverside, Alabama (AL) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Riverside, AL, Alabama, Alabama forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 10
Total length: 158 meters (518ft)
Total costs: $28,649,000
Total average daily traffic: 162,780
Total average daily truck traffic: 47,051
National Bridge Inventory (NBI) Registered Bridges for Riverside

New bridges - Historical Statistics

  • 1930-1939: 2
  • 1940-1949: 0
  • 1950-1959: 0
  • 1960-1969: 8

Reconstructed bridges - Historical Statistics

  • 1960-1969: 1
  • 1970-1979: 0
  • 1980-1989: 2

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 1194,  Location: DEPOTE ST & CO (Lat: 33.616667,  Lng: -86.166667),  Route carried "on" structure: City street ,  Year Built: 1935,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 350 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 500 (year 2027),  Design Load: H 15,  Features Intersected: CREEK,  Facility Carried by Structure: DEPOTE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.399,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 22.7 metric tons,  Inventory Rating: 17.1 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $166,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $249,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 7221,  Location: .1 MI W. RIVERSIDE EXIT (Lat: 33.600000,  Lng: -86.216667),  Route carried "on" structure: Interstate 20,  Year Built: 1961,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 5.87m (19.26ft),  Average Daily Traffic: 21,525 (year 2007),  Truck Traffic: 35%,  Average Future Daily Traffic: 22,429 (year 2027),  Design Load: HS 20,  Features Intersected: SOUTHERN RAIL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 261.720,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.90m (22.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $1,607,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $2,411,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>

Structure Number: 7222,  Location: I20 & SOU RR (Lat: 33.600000,  Lng: -86.216667),  Route carried "on" structure: Interstate 20,  Year Built: 1961,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 21,525 (year 2007),  Truck Traffic: 35%,  Average Future Daily Traffic: 22,429 (year 2027),  Design Load: HS 20,  Features Intersected: SOUTHERN RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 261.720,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.91m (22.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $1,609,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $2,414,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>

Structure Number: 785,  Location: RIVERSIDE (Lat: 33.583333,  Lng: -86.183333),  Route carried "on" structure: Interstate 20,  Year Built: 1963,  Status: Open,  Structure Length: 42.28m (138.71ft),  Average Daily Traffic: 21,550 (year 2007),  Truck Traffic: 35%,  Average Future Daily Traffic: 22,433 (year 2027),  Design Load: HS 20,  Features Intersected: COOSA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 264.676,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Navigation Control: Yes ( Vertical Clearance: 10.7m (35.1ft), Horizontal Clearance: 76.2m (250.0ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 8,  Length of Maximum Span: 79.2m (259.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 42.27m (138.68ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Critical Feature Inspection Date: January 2007,  Underwater Inspection Date: October 2006,  Bridge Improvement Cost: $5,168,000,  Roadway Improvement Cost: $517,000,  Total Project Cost: $7,752,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 7851,  Location: RIVERSIDE (Lat: 33.583333,  Lng: -86.183333),  Route carried "on" structure: Interstate 20,  Year Built: 1963,  Status: Open,  Structure Length: 42.28m (138.71ft),  Average Daily Traffic: 21,550 (year 2007),  Truck Traffic: 35%,  Average Future Daily Traffic: 22,433 (year 2027),  Design Load: HS 20,  Features Intersected: COOSA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 264.676,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Navigation Control: Yes ( Vertical Clearance: 10.7m (35.1ft), Horizontal Clearance: 76.2m (250.0ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 8,  Length of Maximum Span: 79.2m (259.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 42.27m (138.68ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Critical Feature Inspection Date: January 2007,  Underwater Inspection Date: October 2006,  Bridge Improvement Cost: $5,168,000,  Roadway Improvement Cost: $517,000,  Total Project Cost: $7,752,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 8242,  Location: @SOUTH RIVERSIDE CL (Lat: 33.583333,  Lng: -86.233333),  Route carried "on" structure: US 78,  Year Built: 1964,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 9,290 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,717 (year 2027),  Design Load: HS 20,  Features Intersected: FISHING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 218.472,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.56m (18.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $680,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $1,020,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 8243,  Location: US 78 & I 20 RIVERSIDE (Lat: 33.583333,  Lng: -86.200000),  Route carried "on" structure: US 78,  Year Built: 1964,  Status: Open,  Structure Length: 10.67m (35.01ft),  Average Daily Traffic: 9,290 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,717 (year 2027),  Design Load: HS 20,  Features Intersected: I 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 221.171,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.56m (37.93ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $1,280,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,920,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 8668,  Location: .7 MI.W. I-20 (Lat: 33.583333,  Lng: -86.216667),  Route carried "on" structure: US 78,  Year Built: 1965,  Status: Open,  Structure Length: 7.59m (24.90ft),  Average Daily Traffic: 9,290 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,717 (year 2027),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 220.083,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.60m (28.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $1,058,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,587,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 10641,  Location: @ ST CLAIR/TALLADEGA CL (Lat: 33.600000,  Lng: -86.183333),  Route carried "on" structure: US 78,  Year Built: 1930,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 27.95m (91.70ft),  Average Daily Traffic: 5,360 (year 2007),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,638 (year 2027),  Design Load: HS 15,  Features Intersected: COOSA RIVER
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 222.894,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Navigation Control: Yes ( Vertical Clearance: 7.3m (24.0ft), Horizontal Clearance: 30.5m (100.1ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 12,  Length of Maximum Span: 70.7m (232.0ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.0 metric tons,  Inventory Rating: 24.5 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 27.95m (91.70ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Critical Feature Inspection Date: November 2007,  Underwater Inspection Date: September 2007,  Bridge Improvement Cost: $2,363,000,  Roadway Improvement Cost: $236,000,  Total Project Cost: $3,544,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 8243,  Location: U.S. 78 & I20 (Lat: 33.583333,  Lng: -86.200000),  Route carried "under" structure: Interstate 20,  Year Built: 1964,  Structure Length: 10.67m (35.01ft),  Average Daily Traffic: 43,050 (year 2007),  Truck Traffic: 35%,  Features Intersected: I-20,  Facility Carried by Structure: US 78
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 262.156,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.3m (96.1ft)

Discuss this city on our hugely popular Alabama forum

Back to: Riverside, AL, Alabama, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.