Bridge Statistics for Roswell, New Mexico (NM)
Condition, Traffic, Stress, Structural Evaluation, Project Costs



New bridges - Historical Statistics

  • 61930-1939
  • 21940-1949
  • 81950-1959
  • 131960-1969
  • 41970-1979
  • 71990-1999
  • 62000-2009

Reconstructed bridges - Historical Statistics

  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 21990-1999

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>   Show street view

Structure Number: 2367,  Location: 500' E OF WASHINGTION AVE (Lat: 33.401042,  Lng: -104.531169),  Route carried "on" structure: City street 5714,  Year Built: 1955,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 2,289 (year 2014),  Truck Traffic: 12%,  Average Future Daily Traffic: 2,707 (year 2034),  Features Intersected: SPRING RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 13,  Bridge Improvement Cost: $46,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $69,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2371,  Location: 0.6 M N OF US-380 ON LEA (Lat: 33.402389,  Lng: -104.528967),  Route carried "on" structure: City street 5724,  Year Built: 1955,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 2,152 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,545 (year 2034),  Design Load: HS 20,  Features Intersected: NORTH SPRING RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 14,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2391,  Location: 50' N OF 7TH STREET (Lat: 33.400131,  Lng: -104.531806),  Route carried "on" structure: City street 5818,  Year Built: 1955,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,462 (year 2014),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,912 (year 2034),  Features Intersected: SPRING RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 13,  Bridge Improvement Cost: $65,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $97,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2396,  Location: JCT 7TH & WASHINGTION AVE (Lat: 33.399906,  Lng: -104.532047),  Route carried "on" structure: City street 5704,  Year Built: 1930,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 443 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 524 (year 2034),  Features Intersected: SPRING RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 13,  Bridge Improvement Cost: $80,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $120,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2819,  Location: 100' N OF 10TH STREET (Lat: 33.403731,  Lng: -104.526083),  Route carried "on" structure: City street 5703,  Year Built: 1930,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 2,928 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,463 (year 2034),  Features Intersected: SPRING RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 13,  Bridge Improvement Cost: $85,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $128,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2861,  Location: 0.7 M S JCT US-380/ROSWEL (Lat: 33.385500,  Lng: -104.528908),  Route carried "on" structure: City street 5724,  Year Built: 1938,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 4,013 (year 2014),  Truck Traffic: 19%,  Average Future Daily Traffic: 4,747 (year 2034),  Design Load: HS 20,  Features Intersected: HONDO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 14,  Bridge Improvement Cost: $33,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $50,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 529,  Location: JCT MCGAFFEY-UNION/ROSWEL (Lat: 33.379672,  Lng: -104.535853),  Route carried "on" structure: City street 4708,  Year Built: 1953,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 4,398 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,202 (year 2034),  Design Load: HS 20+Mod,  Features Intersected: HONDO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.150,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 42.7m (140.1ft),  Out-to-Out Width: 43.3m (142.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 81.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 14,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5291,  Location: 0.7 M N OF US-380/ROSWELL (Lat: 33.403922,  Lng: -104.522711),  Route carried "on" structure: US 4685,  Year Built: 1953,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 17,191 (year 2014),  Truck Traffic: 19%,  Average Future Daily Traffic: 20,334 (year 2034),  Design Load: HS 20,  Features Intersected: NORTH SPRING RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 535.221,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 30.2m (99.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 14,  Bridge Improvement Cost: $194,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $291,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5292,  Location: 0.3 M S US-285/380-ROSWEL (Lat: 33.388892,  Lng: -104.522669),  Route carried "on" structure: City street 4685,  Year Built: 1953,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 13,192 (year 2014),  Truck Traffic: 21%,  Average Future Daily Traffic: 15,604 (year 2034),  Design Load: HS 20,  Features Intersected: HONDO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 175.096,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 29.6m (97.1ft),  Out-to-Out Width: 30.3m (99.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 14,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5553,  Location: 3.5 MI S US-380/ROSWELL (Lat: 33.346406,  Lng: -104.508331),  Route carried "on" structure: US 4685,  Year Built: 1947,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 10,727 (year 2014),  Truck Traffic: 21%,  Average Future Daily Traffic: 12,688 (year 2034),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 171.056,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 12,  Bridge Improvement Cost: $127,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $191,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 5554,  Location: 4.2 M S JCT US70/380-285 (Lat: 33.335614,  Lng: -104.505750),  Route carried "on" structure: US 4685,  Year Built: 1947,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 10,727 (year 2014),  Truck Traffic: 21%,  Average Future Daily Traffic: 12,688 (year 2034),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 169.383,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 14,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $30,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 5677,  Location: 2.8 MI W OF US-285/ROSWEL (Lat: 33.394117,  Lng: -104.570697),  Route carried "on" structure: US 380,  Year Built: 1955,  Year Reconstructed: 1967,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 3,340 (year 2014),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,951 (year 2034),  Design Load: HS 20+Mod,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 253.633,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 12,  Bridge Improvement Cost: $638,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $958,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 609,  Location: 0.2 MI S OF US-380/ROSWEL (Lat: 33.390831,  Lng: -104.514303),  Route carried "on" structure: City street 5722,  Year Built: 1960,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 4,139 (year 2014),  Truck Traffic: 14%,  Average Future Daily Traffic: 4,896 (year 2034),  Design Load: H 15,  Features Intersected: HONDO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 14,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6091,  Location: 0.6 MI N OF US-380/ROSWEL (Lat: 33.406258,  Lng: -104.514347),  Route carried "on" structure: City street 5722,  Year Built: 1960,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 5,628 (year 2014),  Truck Traffic: 13%,  Average Future Daily Traffic: 6,657 (year 2034),  Design Load: H 15,  Features Intersected: NORTH SPRING RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.0m (3.3ft),  Right: 1.0m (3.3ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 15,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $500,000 ( Estimate for 2080),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6373,  Location: 3.5 M N Jct US380/Roswell (Lat: 33.444775,  Lng: -104.523300),  Route carried "on" structure: City street 4685,  Year Built: 1963,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 3,865 (year 2014),  Truck Traffic: 26%,  Average Future Daily Traffic: 4,572 (year 2034),  Design Load: HS 20,  Features Intersected: South Berrendo Creek,  Facility Carried by Structure: US-70/285
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 541.432,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.19m (20.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 14,  Bridge Improvement Cost: $398,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $598,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6374,  Location: 3.5 M N Jct US380/Roswell (Lat: 33.444850,  Lng: -104.523139),  Route carried "on" structure: City street 4685,  Year Built: 1963,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 3,958 (year 2014),  Truck Traffic: 26%,  Average Future Daily Traffic: 4,681 (year 2034),  Design Load: HS 20,  Features Intersected: Berrendo Creek,  Facility Carried by Structure: US-70/285
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 541.432,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.2m (36.7ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.19m (20.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 14,  Bridge Improvement Cost: $398,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $598,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6637,  Location: 12.4 MI S OF NM2/S ROSWEL (Lat: 33.124411,  Lng: -104.442717),  Route carried "on" structure: US 285,  Year Built: 1963,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 6,762 (year 2014),  Truck Traffic: 35%,  Average Future Daily Traffic: 8,891 (year 2034),  Design Load: HS 20,  Features Intersected: ZUBER DIVERSION
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 144.057,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 13
Find on map >>   Show street view

Structure Number: 8308,  Location: .28 N OF W 2ND ST ROSWELL (Lat: 33.398322,  Lng: -104.536150),  Route carried "on" structure: City street 4705,  Year Built: 1979,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 8,665 (year 2014),  Truck Traffic: 15%,  Average Future Daily Traffic: 10,249 (year 2034),  Design Load: HS 20,  Features Intersected: NORTH SPRING RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 14
Find on map >>   Show street view

Structure Number: 8901,  Location: 3.8 Mi West of US-70/380 (Lat: 33.444703,  Lng: -104.568494),  Route carried "on" structure: US 285,  Year Built: 1996,  Status: Open,  Structure Length: 8.44m (27.69ft),  Average Daily Traffic: 4,488 (year 2014),  Truck Traffic: 60%,  Average Future Daily Traffic: 5,901 (year 2034),  Design Load: HS 20,  Features Intersected: SOUTH BERRENDO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.910,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 14,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8902,  Location: 6.9 MI OF US-70/380 (Lat: 33.469225,  Lng: -104.528206),  Route carried "on" structure: US 285,  Year Built: 1997,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 2,013 (year 2014),  Truck Traffic: 58%,  Average Future Daily Traffic: 2,647 (year 2034),  Design Load: HS 20,  Features Intersected: MIDDLE BERRANDO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.738,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 14,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9021,  Location: 8 M N JCT US70/ROSWELL (Lat: 33.588233,  Lng: -104.520881),  Route carried "on" structure: US 285,  Year Built: 2000,  Status: Open,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 1,347 (year 2014),  Truck Traffic: 35%,  Average Future Daily Traffic: 1,771 (year 2034),  Design Load: HS 20,  Features Intersected: SALT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 197.788,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.5m (60.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 14,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9027,  Location: 13 MI N OF JCT US-70/285 (Lat: 33.651589,  Lng: -104.562100),  Route carried "on" structure: US 285,  Year Built: 1999,  Status: Open,  Structure Length: 6.90m (22.64ft),  Average Daily Traffic: 1,347 (year 2014),  Truck Traffic: 35%,  Average Future Daily Traffic: 1,771 (year 2034),  Design Load: HS 20,  Features Intersected: MACHO DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 205.835,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 14,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9032,  Location: 2.62 MI S US-70/380 (Lat: 33.358317,  Lng: -104.582733),  Route carried "on" structure: City street 285,  Year Built: 1994,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 9,439 (year 2014),  Truck Traffic: 33%,  Average Future Daily Traffic: 12,411 (year 2034),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.259,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.9m (52.2ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 13
Find on map >>   Show street view

Structure Number: 9033,  Location: 2.49 MI S US-70/380 (Lat: 33.363797,  Lng: -104.583511),  Route carried "on" structure: City street 285,  Year Built: 1994,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 9,439 (year 2014),  Truck Traffic: 33%,  Average Future Daily Traffic: 12,411 (year 2034),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.690,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 11
Find on map >>   Show street view

Structure Number: 9034,  Location: 1.34 MI S OF US-70/380 (Lat: 33.374800,  Lng: -104.583417),  Route carried "on" structure: City street 285,  Year Built: 1994,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 10,418 (year 2014),  Truck Traffic: 29%,  Average Future Daily Traffic: 13,698 (year 2034),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.461,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 11
Find on map >>   Show street view

Structure Number: 9076,  Location: JCT KENTUCKY & 9TH ST (Lat: 33.402283,  Lng: -104.527486),  Route carried "on" structure: City street 5702,  Year Built: 1930,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,805 (year 2014),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,135 (year 2034),  Features Intersected: SPRING RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 14,  Bridge Improvement Cost: $104,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $156,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9077,  Location: JCT MISSOURI & 9TH ST (Lat: 33.402633,  Lng: -104.530411),  Route carried "on" structure: City street 5701,  Year Built: 1930,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 830 (year 2014),  Truck Traffic: 72%,  Average Future Daily Traffic: 982 (year 2034),  Features Intersected: SPRING RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 14,  Bridge Improvement Cost: $88,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $132,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9088,  Location: 800' S OF COLLEGE BLVD (Lat: 33.406497,  Lng: -104.505669),  Route carried "on" structure: City street 4710,  Year Built: 1930,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 5,609 (year 2014),  Truck Traffic: 31%,  Average Future Daily Traffic: 6,634 (year 2034),  Features Intersected: SPRING RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 14,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9122,  Location: 100'N JCT RICHARDSON&10TH (Lat: 33.403744,  Lng: -104.524447),  Route carried "on" structure: City street 5815,  Year Built: 1998,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,160 (year 2014),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,372 (year 2034),  Design Load: HS 20,  Features Intersected: SPRING RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 14,  Bridge Improvement Cost: $88,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $132,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9123,  Location: 850'S OF COLLEGE/GARDEN (Lat: 33.403250,  Lng: -104.514250),  Route carried "on" structure: City street 5722,  Year Built: 1960,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,907 (year 2014),  Truck Traffic: 12%,  Average Future Daily Traffic: 2,256 (year 2034),  Features Intersected: SPRING RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Satisfactory,  Culverts: Serious,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 14,  Bridge Improvement Cost: $59,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $89,000 ( Estimate for 2008)
Find on map >>   Show street view

Structure Number: 9129,  Location: 150' W JCT US-285 & ALB. (Lat: 33.387786,  Lng: -104.523450),  Route carried "on" structure: City street 5710,  Year Built: 1979,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 750 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 887 (year 2034),  Features Intersected: HONDO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 14,  Bridge Improvement Cost: $143,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $214,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 914,  Location: JCT. OF W.BLAND/PENNSLYV. (Lat: 33.386839,  Lng: -104.525806),  Route carried "on" structure: City street 5703,  Year Built: 1972,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 2,928 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,463 (year 2034),  Design Load: HS 20,  Features Intersected: RIO HONDO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 14,  Bridge Improvement Cost: $33,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $50,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9147,  Location: 1.2 MI. S JCT. US70/380 (Lat: 33.375786,  Lng: -104.541167),  Route carried "on" structure: City street 4704,  Year Built: 1972,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,069 (year 2014),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,572 (year 2034),  Design Load: HS 20,  Features Intersected: RIO HONDO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of replacement,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 14,  Bridge Improvement Cost: $76,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $114,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9199,  Location: 300' S JCT US 380 & ELM (Lat: 33.393053,  Lng: -104.511197),  Route carried "on" structure: City street 5000,  Year Built: 1960,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 217 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 257 (year 2034),  Design Load: HS 15,  Features Intersected: RIO HONDO,  Facility Carried by Structure: 05-Z000
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 12 months,  Inspection Date: Febuary 15,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 92,  Location: 100' S OF TILDEN ST. (Lat: 33.389547,  Lng: -104.521103),  Route carried "on" structure: City street 5817,  Year Built: 1960,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 3,762 (year 2014),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,450 (year 2034),  Design Load: HS 15,  Features Intersected: RIO HONDO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 14,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9201,  Location: 50' E OF KENTUCKY AVE. (Lat: 33.385694,  Lng: -104.527222),  Route carried "on" structure: City street 5719,  Year Built: 1960,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,051 (year 2014),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,243 (year 2034),  Design Load: HS 15,  Features Intersected: RIO HONDO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 14,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9202,  Location: 300' N S. RICHARSON/BLAND (Lat: 33.387269,  Lng: -104.524419),  Route carried "on" structure: City street 5815,  Year Built: 2001,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,160 (year 2014),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,372 (year 2034),  Design Load: HS 20,  Features Intersected: RIO HONDO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 27.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 14,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9203,  Location: 50' S OF W DEMING ST. (Lat: 33.385572,  Lng: -104.527211),  Route carried "on" structure: City street 5702,  Year Built: 1960,  Status: Open,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 1,107 (year 2014),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,309 (year 2034),  Design Load: HS 20,  Features Intersected: RIO HONDO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 27.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 14,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9204,  Location: 0.2 MI N. OF JCT US-380 (Lat: 33.397014,  Lng: -104.505511),  Route carried "on" structure: City street 4710,  Year Built: 1960,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 7,224 (year 2014),  Truck Traffic: 32%,  Average Future Daily Traffic: 8,545 (year 2034),  Design Load: HS 15,  Features Intersected: RIO HONDO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 14,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9205,  Location: 100' S OF JCT SUMMIT ST. (Lat: 33.383350,  Lng: -104.531725),  Route carried "on" structure: City street 5818,  Year Built: 1960,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,214 (year 2014),  Truck Traffic: 24%,  Average Future Daily Traffic: 1,436 (year 2034),  Design Load: HS 15,  Features Intersected: RIO HONDO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 12 months,  Inspection Date: Febuary 15,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9295,  Location: 10.1 M W JCT US-380 HONDO (Lat: 33.414928,  Lng: -105.438519),  Route carried "on" structure: US 70,  Year Built: 2004,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 3,617 (year 2014),  Truck Traffic: 26%,  Average Future Daily Traffic: 4,756 (year 2034),  Design Load: HS 20,  Features Intersected: DEVILS CANYON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 442.199,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 15,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9298,  Location: 9.0 M W JCT US-380 HONDO (Lat: 33.418989,  Lng: -105.416678),  Route carried "on" structure: US 70,  Year Built: 2004,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 3,617 (year 2014),  Truck Traffic: 26%,  Average Future Daily Traffic: 4,756 (year 2034),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 443.857,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 15,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9354,  Location: 10.2 M E JCT US 70/285 (Lat: 33.396706,  Lng: -104.361850),  Route carried "on" structure: US 380,  Year Built: 2004,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2,911 (year 2014),  Truck Traffic: 24%,  Average Future Daily Traffic: 3,619 (year 2034),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 264.254,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 15
Find on map >>   Show street view

Structure Number: 9402,  Location: 0.7 MI N OF US-380 (Lat: 33.404511,  Lng: -104.521150),  Route carried "on" structure: City street 5817,  Year Built: 1953,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 3,451 (year 2012),  Truck Traffic: 20%,  Average Future Daily Traffic: 4,341 (year 2032),  Design Load: HS 20,  Features Intersected: SPRING RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 24.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 13,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous