Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Rowlesburg, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 217ft / 65.6mTotal length
  • $6,887,000Total costs
  • 6,050Total average daily traffic
  • 773Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Rowlesburg
  • No street view available for this location

New bridges in Rowlesburg, WV - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11920-1929
  • 11930-1939
  • 21940-1949
  • 11950-1959
  • 31980-1989
  • 41990-1999
  • 12000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Very good
  • 33.3%Good
  • 25.0%Satisfactory
  • 25.0%Fair
  • 8.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 58.3%Good
  • 16.7%Satisfactory
  • 25.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.4%Very good
  • 23.1%Good
  • 15.4%Satisfactory
  • 23.1%Fair
  • 23.1%Poor
Find on map >>   Show street view

Structure Number: 39A109,  Location: 0.02 MI EAST CO RT 50/13 (Lat: 39.319869,  Lng: -79.656731),  Route carried "on" structure: US 5000,  Year Built: 1932,  Year Reconstructed: 1987,  Status: Posted for load,  Structure Length: 14.02m (46.00ft),  Average Daily Traffic: 900 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,080 (year 2041),  Design Load: HS 20,  Features Intersected: CHEAT RIVER,  Facility Carried by Structure: US ROUTE 50
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 25.943,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 45.8m (150.3ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 14.87m (48.79ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Underwater Inspection Date: July 2018,  Bridge Improvement Cost: $1,933,000,  Roadway Improvement Cost: $1,197,000,  Total Project Cost: $3,884,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 39A116,  Location: 0.13 MI NORTH WV RT 72 (Lat: 39.349500,  Lng: -79.668100),  Route carried "on" structure: County highway 5100,  Year Built: 1987,  Status: Open,  Structure Length: 15.30m (50.20ft),  Average Daily Traffic: 250 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 350 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: CHEAT RIVER,  Facility Carried by Structure: PRESTON CO RT 51
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: July 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 39A118,  Location: 0.03 MI EAST WV RT 72 (Lat: 39.319361,  Lng: -79.687981),  Route carried "on" structure: US 5000,  Year Built: 1947,  Status: Open,  Structure Length: 4.50m (14.76ft),  Average Daily Traffic: 1,200 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,750 (year 2038),  Design Load: HS 15,  Features Intersected: BUFFALO CREEK,  Facility Carried by Structure: US ROUTE 50
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.772,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 1,  Length of Maximum Span: 14.4m (47.2ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.58m (18.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $517,000,  Roadway Improvement Cost: $484,000,  Total Project Cost: $1,174,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 39A121,  Location: 1.21 MI WEST WV RT 72 (Lat: 39.320869,  Lng: -79.714131),  Route carried "on" structure: US 5000,  Year Built: 1988,  Status: Open,  Structure Length: 1.97m (6.46ft),  Average Daily Traffic: 1,200 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,750 (year 2038),  Design Load: HS 20,  Features Intersected: FLAG RUN,  Facility Carried by Structure: US ROUTE 50
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.471,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 39A125,  Location: 0.01 MI NORTH CO RT 51 (Lat: 39.385681,  Lng: -79.620231),  Route carried "on" structure: County highway 5103,  Year Built: 1981,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 10 (year 2019),  Average Future Daily Traffic: 14 (year 2041),  Design Load: HS 20,  Features Intersected: SALTLICK CREEK,  Facility Carried by Structure: PRESTON CO RT 51/3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Good,  Channel: Poor,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $193,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $428,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 39A142,  Location: 0.03 MI NORTH CO RT 72/6 (Lat: 39.316931,  Lng: -79.693669),  Route carried "on" structure: State highway 7200,  Year Built: 1940,  Status: Open,  Structure Length: 1.32m (4.33ft),  Average Daily Traffic: 700 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 925 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: FLAG RUN,  Facility Carried by Structure: WV ROUTE 72
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.640,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $228,000,  Total Project Cost: $593,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 39A149,  Location: 0.01 MI EAST WV RT 72 (Lat: 39.288711,  Lng: -79.704100),  Route carried "on" structure: County highway 7203,  Year Built: 1993,  Status: Open,  Structure Length: 1.69m (5.54ft),  Average Daily Traffic: 50 (year 2019),  Average Future Daily Traffic: 70 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: BUFFALO CREEK,  Facility Carried by Structure: PRESTON CO RT 72/3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 66.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 39A16,  Location: 0.03 MI NORTH CO RT 51 (Lat: 39.386839,  Lng: -79.629661),  Route carried "on" structure: County highway 8600,  Year Built: 1996,  Status: Posted for load,  Structure Length: 3.76m (12.34ft),  Average Daily Traffic: 10 (year 2018),  Average Future Daily Traffic: 13 (year 2041),  Design Load: H 10,  Features Intersected: SALTLICK CREEK,  Facility Carried by Structure: PRESTON CO RT 86
Minimum Vertical Clearance: 8.33m (27.33ft),  Kilometerpoint: 0.048,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Skew: 9 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.0m (13.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 20.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Critical Feature Inspection Date: December 2020,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 39A18,  Location: 0.70 MI EAST CO RT 51 (Lat: 39.384250,  Lng: -79.600650),  Route carried "on" structure: County highway 5109,  Year Built: 1950,  Year Reconstructed: 1992,  Status: Posted for load,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 10 (year 2018),  Average Future Daily Traffic: 13 (year 2038),  Features Intersected: WOLF RUN,  Facility Carried by Structure: PRESTON CO RT 51/9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 3.4m (11.2ft),  Out-to-Out Width: 3.8m (12.5ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Good,  Channel: Poor,  Operating Rating: 16.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $147,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $334,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 39A185,  Location: 1.37 MI EAST CO RT 50/9 (Lat: 39.324269,  Lng: -79.722131),  Route carried "on" structure: US 5000,  Year Built: 1920,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 1,200 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,440 (year 2041),  Features Intersected: FLAG RUN,  Facility Carried by Structure: US ROUTE 50
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.714,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $233,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $474,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 39A195,  Location: 0.25 MI NORTH CO RT 51 (Lat: 39.389289,  Lng: -79.630311),  Route carried "on" structure: County highway 8600,  Year Built: 1996,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 10 (year 2017),  Average Future Daily Traffic: 13 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: SPRUCE RUN,  Facility Carried by Structure: PRES CO RT 86
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2019,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 39A199,  Location: 0.03 MI SOUTH CO RT 53/2 (Lat: 39.382350,  Lng: -79.604681),  Route carried "on" structure: County highway 5100,  Year Built: 1997,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 250 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 350 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: KINSINGER RUN,  Facility Carried by Structure: PRESTON CO RT 51
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.771,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Poor,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 39A224,  Location: 0.01 MI NORTH CO RT 80/2 (Lat: 39.351650,  Lng: -79.663161),  Route carried "on" structure: County highway 5100,  Year Built: 2004,  Status: Open,  Structure Length: 17.62m (57.81ft),  Average Daily Traffic: 250 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 325 (year 2038),  Design Load: HL 93,  Features Intersected: SALTLICK CREEK & CSX RR,  Facility Carried by Structure: PRESTON CO RT 51
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.191,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 5,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 39A205,  Location: 0.04 MI NORTH CO RT 51 (Lat: 39.386750,  Lng: -79.629561),  Route carried "under" structure: County highway 8600,  Year Built: 1865,  Structure Length: 0. m,  Average Daily Traffic: 10 (year 2018),  Features Intersected: PRES CO 86 & SALTLICK CK,  Facility Carried by Structure: CSX RAILROAD
Minimum Vertical Clearance: 8.33m (27.33ft),  Kilometerpoint: 0.064,  Lanes under structure: 1,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Length of Maximum Span: 9.8m (32.2ft)

Discuss Rowlesburg, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.