U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Rupert, Vermont (VT) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Rupert, VT, Vermont, Vermont forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 13
Total length: 13 meters (43ft)
Total costs: $6,502,000
Total average daily traffic: 8,117
Total average daily truck traffic: 666
Total future (year 2015) average daily traffic: 12,175
National Bridge Inventory (NBI) Registered Bridges for Rupert

New bridges - Historical Statistics

  • 1900-1909: 1
  • 1910-1919: 2
  • 1920-1929: 2
  • 1930-1939: 3
  • 1940-1949: 1
  • 1950-1959: 0
  • 1960-1969: 0
  • 1970-1979: 1
  • 1980-1989: 1
  • 1990-1999: 1
  • 2000-2009: 1

Reconstructed bridges - Historical Statistics

  • 1930-1939: 1
  • 1940-1949: 2
  • 1950-1959: 0
  • 1960-1969: 0
  • 1970-1979: 2
  • 1980-1989: 3

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 100210001302101,  Location: 0.2 MI TO JCT W CL3 TH4 (Lat: 43.236667,  Lng: -73.244444),  Route carried "on" structure: Other road C2001,  Year Built: 1941,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 750 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,125 (year 2018),  Design Load: H 15,  Features Intersected: WHITE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 31.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.53m (8.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $738,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $888,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 100210003302101,  Location: 0.75 MI TO JCT W C3 TH24 (Lat: 43.232222,  Lng: -73.187778),  Route carried "on" structure: Other road C3004,  Year Built: 1988,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 120 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 180 (year 2018),  Design Load: HS 20,  Features Intersected: WHITE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 67.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $473,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $623,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 100210003502101,  Location: 0.01 MI TO JCT W C3 TH28 (Lat: 43.227222,  Lng: -73.177778),  Route carried "on" structure: Other road C3004,  Year Built: 1939,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 75 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 112 (year 2018),  Design Load: H 20,  Features Intersected: WHITE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 63.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $236,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $386,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 100210003602101,  Location: @ JCT W C3 TH24 (Lat: 43.235278,  Lng: -73.203889),  Route carried "on" structure: Other road C3004,  Year Built: 1900,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 120 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 180 (year 2018),  Design Load: H 20,  Features Intersected: MILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $287,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $437,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 100210003702101,  Location: 0.25 MI TO JCT W C3 TH28 (Lat: 43.229444,  Lng: -73.181667),  Route carried "on" structure: Other road C3004,  Year Built: 1995,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 102 (year 2004),  Truck Traffic: 2%,  Average Future Daily Traffic: 153 (year 2024),  Design Load: HS 25,  Features Intersected: WHITE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 57.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $391,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $541,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 100210003802101,  Location: 0.3 MI TO JCT W CL2 TH1 (Lat: 43.235278,  Lng: -73.252778),  Route carried "on" structure: Other road C3021,  Year Built: 1919,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 10 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 15 (year 2018),  Features Intersected: WHITE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 70.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $289,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $439,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Internally Sealed
Find on map >>

Structure Number: 100210003902101,  Location: 0.04 MI TO JCT W CL3 TH4 (Lat: 43.230000,  Lng: -73.221667),  Route carried "on" structure: Other road C3027,  Year Built: 1919,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 100 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 150 (year 2018),  Design Load: H 10,  Features Intersected: WHITE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 25.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $249,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $399,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Internally Sealed
Find on map >>

Structure Number: 100210004002101,  Location: 0.04 MI TO JCT W CL3 TH4 (Lat: 43.230833,  Lng: -73.219722),  Route carried "on" structure: Other road C3026,  Year Built: 1931,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 10 (year 2004),  Truck Traffic: 2%,  Average Future Daily Traffic: 15 (year 2024),  Features Intersected: WHITE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 24.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 15.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $245,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $395,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Internally Sealed
Find on map >>

Structure Number: 100210004102101,  Location: 0.03 MI TO JCT W VT315 (Lat: 43.261944,  Lng: -73.219444),  Route carried "on" structure: Other road C3023,  Year Built: 1975,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 50 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 75 (year 2018),  Design Load: HS 20,  Features Intersected: MILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 81.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $216,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $366,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 200015006202102,  Location: 0.1 MI N JCT. VT.315 (Lat: 43.273889,  Lng: -73.124722),  Route carried "on" structure: State highway 30,  Year Built: 1929,  Year Reconstructed: 1947,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 2,800 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,200 (year 2018),  Design Load: H 15,  Features Intersected: METTAWEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 77.192,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 300000,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $464,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $614,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200015006602102,  Location: 3.1 MI N JCT. VT.315 (Lat: 43.306944,  Lng: -73.159722),  Route carried "on" structure: State highway 30,  Year Built: 1939,  Year Reconstructed: 1949,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 2,800 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,200 (year 2018),  Design Load: H 15,  Features Intersected: METTAWEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 82.091,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 300000,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $603,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $753,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200122000602102,  Location: 1.0 MI E JCT VT 153 (Lat: 43.264722,  Lng: -73.211667),  Route carried "on" structure: County highway 2,  Year Built: 2004,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 750 (year 2005),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,125 (year 2025),  Design Load: HS 25,  Features Intersected: MILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $166,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $191,000 ( Estimate for 2007)
Find on map >>

Structure Number: 200131001202102,  Location: 6.5 MI W JCT. VT.30 (Lat: 43.310556,  Lng: -73.243056),  Route carried "on" structure: County highway 1,  Year Built: 1924,  Year Reconstructed: 1938,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 430 (year 1995),  Truck Traffic: 6%,  Average Future Daily Traffic: 645 (year 2015),  Design Load: H 15,  Features Intersected: INDIAN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 66.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $320,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $470,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular Vermont forum

Back to: Rupert, VT, Vermont, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.