![]() |
Bridge Statistics for Rush, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Rush, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 19 Total length: 134 meters (440ft) Total costs: $50,662,000 Total average daily traffic: 219,825 Total average daily truck traffic: 37,941 National Bridge Inventory (NBI) Registered Bridges for Rush
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 101151, Location: 1.2MI S JCT RTS 15 & 251 (Lat: 42.986831, Lng: -77.672325), Route carried "on" structure: State highway 15, Year Built: 1983, Status: Open, Structure Length: 3.16m (10.37ft), Average Daily Traffic: 3,571 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 5,092 (year 2026), Design Load: HS 20, Features Intersected: HONEOYE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.857, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 30.4m (99.7ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 12.8m (42.0ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Very good, Channel: Good, Inventory Rating: 59.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.16m (10.37ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $880,000, Roadway Improvement Cost: $523,000, Total Project Cost: $1,403,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 101152, Location: 0.6MI S JCT RTS 15 & 251 (Lat: 42.993306, Lng: -77.669233), Route carried "on" structure: State highway 15, Year Built: 2007, Status: Open, Structure Length: 1.01m (3.31ft), Average Daily Traffic: 3,571 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 5,092 (year 2026), Design Load: HS 25, Features Intersected: LEHIGH VALLEY TR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.491, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.0m (39.4ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.1m (33.1ft), Curb-To-Curb Width: 12.0m (39.4ft), Out-to-Out Width: 13.0m (42.7ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 64.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.01m (3.31ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $282,000, Roadway Improvement Cost: $168,000, Total Project Cost: $450,000 ( Estimate for 2007) Find on map >>
Structure Number: 101161, Location: 0.2 MI S JCT RTS 15A &251 (Lat: 42.993153, Lng: -77.645531), Route carried "on" structure: State highway 15A, Year Built: 1992, Status: Open, Structure Length: 3.35m (10.99ft), Average Daily Traffic: 10,257 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 14,625 (year 2027), Design Load: HS 20, Features Intersected: HONEOYE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 7.321, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 32.0m (105.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 10.3m (33.8ft), Out-to-Out Width: 14.4m (47.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Very good, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.35m (10.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $1,043,000, Roadway Improvement Cost: $620,000, Total Project Cost: $1,663,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 106904, Location: 0.2MI.W.JCT.RTS. 251 & 15 (Lat: 43.003064, Lng: -77.668847), Route carried "on" structure: State highway 251, Year Built: 1976, Status: Open, Structure Length: 8.96m (29.40ft), Average Daily Traffic: 2,888 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 4,118 (year 2027), Design Load: HS 20, Features Intersected: RTE I390 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 8.064, Lanes on structure: 5, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 20.1m (65.9ft), Skew: 2 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 44.1m (144.7ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 20.1m (65.9ft), Out-to-Out Width: 23.1m (75.8ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.96m (29.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $2,279,000, Roadway Improvement Cost: $1,290,000, Total Project Cost: $3,569,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 106905, Location: JCT SH 15 & I390 (Lat: 43.005783, Lng: -77.666597), Route carried "on" structure: State highway 15, Year Built: 1977, Status: Open, Structure Length: 11.79m (38.68ft), Average Daily Traffic: 12,189 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 17,380 (year 2026), Design Load: HS 20, Features Intersected: RTE I390 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 7.874, Lanes on structure: 4, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 20.1m (65.9ft), Skew: 25 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 57.9m (190.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 20.1m (65.9ft), Out-to-Out Width: 23.1m (75.8ft) Condition: Deck: Fair, Superstructure: Very good, Substructure: Very good, Operating Rating: 80.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 48.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Better than present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Superior to present desirable criteria, Length Of Structure Improvement: 11.79m (38.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $2,279,000, Roadway Improvement Cost: $1,290,000, Total Project Cost: $3,569,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1069061, Location: 2 MILES NORTH OF THRUWAY (Lat: 43.017803, Lng: -77.659525), Route carried "on" structure: Interstate 390, Year Built: 1977, Status: Open, Structure Length: 3.59m (11.78ft), Average Daily Traffic: 19,703 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 29,661 (year 2026), Design Load: HS 20, Features Intersected: RUSH-HEN.TN LN RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 12.838, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 34.7m (113.8ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 12.4m (40.7ft), Out-to-Out Width: 13.4m (44.0ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Very good, Operating Rating: 85.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Better than present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.59m (11.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2006, Bridge Improvement Cost: $2,279,000, Roadway Improvement Cost: $1,290,000, Total Project Cost: $3,569,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1069062, Location: 2 MILES NORTH OF THRUWAY (Lat: 43.017783, Lng: -77.659208), Route carried "on" structure: Interstate 390, Year Built: 1977, Status: Open, Structure Length: 3.59m (11.78ft), Average Daily Traffic: 19,703 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 29,661 (year 2026), Design Load: HS 20, Features Intersected: RUSH-HEN.TN LN RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 12.838, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 34.7m (113.8ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 12.4m (40.7ft), Out-to-Out Width: 13.4m (44.0ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Very good, Operating Rating: 85.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Better than present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.59m (11.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2006, Bridge Improvement Cost: $2,279,000, Roadway Improvement Cost: $1,290,000, Total Project Cost: $3,569,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 107028, Location: 0.3 MI S JCT RT 15 & I390 (Lat: 42.947772, Lng: -77.696342), Route carried "on" structure: County highway , Year Built: 1980, Status: Open, Structure Length: 8.53m (27.99ft), Average Daily Traffic: 1,592 (year 1997), Truck Traffic: 6%, Average Future Daily Traffic: 2,615 (year 2017), Design Load: HS 20, Features Intersected: RTE I390, Facility Carried by Structure: HONEOYE FALLS RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 2 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 42.3m (138.8ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 14.3m (46.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.53m (27.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $1,795,000, Roadway Improvement Cost: $1,068,000, Total Project Cost: $2,863,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 107029, Location: JCT OF RTS 15 & I-390 (Lat: 42.949950, Lng: -77.697139), Route carried "on" structure: State highway 15, Year Built: 1980, Status: Open, Structure Length: 10.57m (34.68ft), Average Daily Traffic: 3,571 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 5,092 (year 2026), Design Load: HS 20, Features Intersected: RTE I390 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.105, Lanes on structure: 4, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 4 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 51.8m (169.9ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 15.5m (50.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 59.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 10.57m (34.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $3,539,000, Roadway Improvement Cost: $2,053,000, Total Project Cost: $5,592,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1070301, Location: 2 MI N JCT SH 15 & I390 (Lat: 42.978656, Lng: -77.683383), Route carried "on" structure: Interstate 390, Year Built: 1980, Status: Open, Structure Length: 4.17m (13.68ft), Average Daily Traffic: 10,075 (year 2005), Truck Traffic: 22%, Average Future Daily Traffic: 15,213 (year 2025), Design Load: HS 20, Features Intersected: CR65-RUSH W RH RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.981, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.1m (43.0ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 40.2m (131.9ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.8m (45.3ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 84.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.17m (13.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $3,539,000, Roadway Improvement Cost: $2,053,000, Total Project Cost: $5,592,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1070302, Location: 2 MI N JCT SH 15 & I390 (Lat: 42.978750, Lng: -77.682819), Route carried "on" structure: Interstate 390, Year Built: 1980, Status: Open, Structure Length: 4.17m (13.68ft), Average Daily Traffic: 10,075 (year 2005), Truck Traffic: 22%, Average Future Daily Traffic: 15,213 (year 2025), Design Load: HS 20, Features Intersected: CR65-RUSH W RH RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.981, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.1m (43.0ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 40.2m (131.9ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.8m (45.3ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Inventory Rating: 68.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.17m (13.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $3,539,000, Roadway Improvement Cost: $2,053,000, Total Project Cost: $5,592,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1070311, Location: 1 MI S JCT RTS 251 & I390 (Lat: 42.990614, Lng: -77.679792), Route carried "on" structure: Interstate 390, Year Built: 1980, Status: Open, Structure Length: 13.38m (43.90ft), Average Daily Traffic: 10,075 (year 2005), Truck Traffic: 22%, Average Future Daily Traffic: 15,213 (year 2025), Design Load: HS 20, Features Intersected: FISHELL ROAD, HONEOYE CR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.936, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 49.3m (161.7ft), Curb-To-Curb Width: 12.6m (41.3ft), Out-to-Out Width: 13.5m (44.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Channel: Very good, Operating Rating: 90.7 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 46.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Underclear: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 13.38m (43.90ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $3,539,000, Roadway Improvement Cost: $2,053,000, Total Project Cost: $5,592,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1070312, Location: 1 MI S JCT RTS 251 & I390 (Lat: 42.990439, Lng: -77.679311), Route carried "on" structure: Interstate 390, Year Built: 1980, Status: Open, Structure Length: 13.38m (43.90ft), Average Daily Traffic: 10,075 (year 2005), Truck Traffic: 22%, Average Future Daily Traffic: 15,213 (year 2025), Design Load: HS 20, Features Intersected: FISHELL ROAD, HONEOYE CR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.936, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 49.3m (161.7ft), Curb-To-Curb Width: 12.6m (41.3ft), Out-to-Out Width: 13.5m (44.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Channel: Very good, Operating Rating: 52.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Underclear: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 13.38m (43.90ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $3,907,000, Roadway Improvement Cost: $2,267,000, Total Project Cost: $6,174,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 331731, Location: 1 MI SW OF RUSH (Lat: 42.985817, Lng: -77.664797), Route carried "on" structure: County highway , Year Built: 1998, Status: Open, Structure Length: 1.18m (3.87ft), Average Daily Traffic: 835 (year 1995), Truck Traffic: 6%, Average Future Daily Traffic: 1,372 (year 2015), Design Load: HS 25, Features Intersected: TRIB HONOYE CREE, Facility Carried by Structure: RUSH WEST RUSH RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.2m (36.7ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 11.3m (37.1ft) Condition: Superstructure: Satisfactory, Substructure: Very good, Channel: Excellent, Operating Rating: 80.6 metric tons, Inventory Rating: 40.8 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.18m (3.87ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $292,000, Roadway Improvement Cost: $174,000, Total Project Cost: $466,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331789, Location: 3 MI SW OF RUSH (Lat: 42.977867, Lng: -77.698944), Route carried "on" structure: County highway , Year Built: 1997, Status: Open, Structure Length: 3.84m (12.60ft), Average Daily Traffic: 1,789 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 2,533 (year 2027), Design Load: HS 25, Features Intersected: HONEOYE CREEK, Facility Carried by Structure: EAST RIVER ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 36.8m (120.7ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 12.8m (42.0ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Excellent, Inventory Rating: 67.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.84m (12.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Bridge Improvement Cost: $626,000, Roadway Improvement Cost: $373,000, Total Project Cost: $999,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 106904, Location: 0.2MI.W.JCT.RTS. 251 & 15 (Lat: 43.003064, Lng: -77.668847), Route carried "under" structure: Interstate 390, Year Built: 1976, Structure Length: 8.96m (29.40ft), Average Daily Traffic: 20,150 (year 2005), Truck Traffic: 22%, Features Intersected: RTE I390, Facility Carried by Structure: RTE 251 Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 7.627, Lanes on structure: 5, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 44.1m (144.7ft) Find on map >>
Structure Number: 106905, Location: JCT SH 15 & I390 (Lat: 43.005783, Lng: -77.666597), Route carried "under" structure: Interstate 390, Year Built: 1977, Structure Length: 11.79m (38.68ft), Average Daily Traffic: 39,406 (year 2006), Truck Traffic: 22%, Features Intersected: RTE I390, Facility Carried by Structure: RTE 15 Minimum Vertical Clearance: 5.48m (17.98ft), Kilometerpoint: 7.965, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 57.9m (190.0ft) Find on map >>
Structure Number: 107028, Location: 0.3 MI S JCT RT 15 & I390 (Lat: 42.947772, Lng: -77.696342), Route carried "under" structure: Interstate 390, Year Built: 1980, Structure Length: 8.53m (27.99ft), Average Daily Traffic: 20,150 (year 2005), Truck Traffic: 22%, Features Intersected: RTE I390, Facility Carried by Structure: HONEOYE FALLS RD Minimum Vertical Clearance: 5.51m (18.08ft), Kilometerpoint: 0.933, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.3m (138.8ft) Find on map >>
Structure Number: 107029, Location: JCT OF RTS 15 & I-390 (Lat: 42.949950, Lng: -77.697139), Route carried "under" structure: Interstate 390, Year Built: 1980, Structure Length: 10.57m (34.68ft), Average Daily Traffic: 20,150 (year 2005), Truck Traffic: 22%, Features Intersected: RTE I390, Facility Carried by Structure: RTE 15 Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 1.191, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 51.8m (169.9ft) Discuss this city on our hugely popular New York forum Back to: Rush, NY, New York, All US cities.
|
![]() |