National Bridge Inventory (NBI) Statistics
Number of bridges: 13
Total length: 32 meters (105ft)
Total costs: $23,936,000
Total average daily traffic: 19,789
Total average daily truck traffic: 1,523
Total future (year 2017) average daily traffic: 23,192
National Bridge Inventory (NBI) Registered Bridges for Rutland

New bridges - Historical Statistics

  • 1910-1919: 1
  • 1920-1929: 0
  • 1930-1939: 1
  • 1940-1949: 3
  • 1950-1959: 1
  • 1960-1969: 1
  • 1970-1979: 1
  • 1980-1989: 2
  • 1990-1999: 2
  • 2000-2009: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 100054,  Location: 0.5 MI E JCT RTS 3 + 342 (Lat: 44.003703,  Lng: -75.806058),  Route carried "on" structure: State highway 3,  Year Built: 1948,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 6.82m (22.38ft),  Average Daily Traffic: 6,891 (year 2005),  Truck Traffic: 7%,  Average Future Daily Traffic: 7,937 (year 2025),  Design Load: H 20,  Features Intersected: BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.499,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.6m (34.8ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.2m (72.8ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 6.82m (22.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,667,000,  Roadway Improvement Cost: $991,000,  Total Project Cost: $2,658,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 100056,  Location: 3.4 MI E JCT SH 3 + SH 34 (Lat: 44.019778,  Lng: -75.761369),  Route carried "on" structure: State highway 3,  Year Built: 1947,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 5,900 (year 2005),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,796 (year 2025),  Design Load: H 20,  Features Intersected: DEERLICK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.922,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 70.0 metric tons,  Inventory Rating: 27.5 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $239,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $381,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 100964,  Location: 4.0 MI.E.JCT.RTES 3+12 (Lat: 43.915156,  Lng: -75.760825),  Route carried "on" structure: State highway 12,  Year Built: 1984,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 2,910 (year 2005),  Truck Traffic: 14%,  Average Future Daily Traffic: 3,552 (year 2025),  Design Load: HS 20,  Features Intersected: SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.916,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.4m (40.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,693,000,  Roadway Improvement Cost: $1,007,000,  Total Project Cost: $2,700,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 322019,  Location: LOCATED IN FELTS MILLS (Lat: 44.022053,  Lng: -75.762464),  Route carried "on" structure: City street ,  Year Built: 1910,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 103 (year 2003),  Truck Traffic: 3%,  Average Future Daily Traffic: 124 (year 2023),  Features Intersected: FELTS MILLS CREEK,  Facility Carried by Structure: OLD STATE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $324,000,  Roadway Improvement Cost: $193,000,  Total Project Cost: $517,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 333834,  Location: 2 MILES E OF TYLERVILLE (Lat: 43.906039,  Lng: -75.777925),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 108 (year 2001),  Truck Traffic: 4%,  Average Future Daily Traffic: 130 (year 2021),  Design Load: HS 20,  Features Intersected: SANDY CREEK,  Facility Carried by Structure: SANDY CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $211,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $337,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 333873,  Location: 1.5 MI NE OF TYLERVILLE (Lat: 43.905261,  Lng: -75.767475),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 61 (year 1997),  Truck Traffic: 4%,  Average Future Daily Traffic: 73 (year 2017),  Features Intersected: STEBBINS CREEK,  Facility Carried by Structure: SANDY CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $482,000,  Roadway Improvement Cost: $287,000,  Total Project Cost: $769,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 333874,  Location: 2 MI NE OF TYLERVILLE (Lat: 43.903808,  Lng: -75.759369),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 71 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 85 (year 2023),  Features Intersected: STEBBINS CREEK,  Facility Carried by Structure: SANDY CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.7m (18.7ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $482,000,  Roadway Improvement Cost: $287,000,  Total Project Cost: $769,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 333892,  Location: 4.0 MI SW OF RUTLAND CENT (Lat: 43.890842,  Lng: -75.813150),  Route carried "on" structure: Other road ,  Year Built: 1939,  Status: Posted for load,  Structure Length: 1.73m (5.68ft),  Average Daily Traffic: 39 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 47 (year 2023),  Features Intersected: SANDY CREEK,  Facility Carried by Structure: MALTBY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.2m (13.8ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: August 2007,  Critical Feature Inspection Date: August 2007,  Bridge Improvement Cost: $228,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $364,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 333893,  Location: 1 MI SW OF TYLERVILLE (Lat: 43.890542,  Lng: -75.811264),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 3 (year 1998),  Truck Traffic: 4%,  Average Future Daily Traffic: 4 (year 2018),  Features Intersected: DYKE BROOK,  Facility Carried by Structure: CURTIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $162,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $259,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 333894,  Location: IN TYLERVILLE (Lat: 43.900131,  Lng: -75.798953),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 35 (year 2000),  Truck Traffic: 4%,  Average Future Daily Traffic: 42 (year 2020),  Design Load: HS 25,  Features Intersected: SANDY CREEK,  Facility Carried by Structure: O DELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $475,000,  Roadway Improvement Cost: $283,000,  Total Project Cost: $758,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 333896,  Location: 1 MI NE OF BLACK RIVER (Lat: 44.022878,  Lng: -75.765772),  Route carried "on" structure: Other road 971V,  Year Built: 1953,  Status: Open,  Structure Length: 12.74m (41.80ft),  Average Daily Traffic: 2,828 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,394 (year 2026),  Design Load: HS 20,  Features Intersected: BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.160,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 38.4m (126.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 12.74m (41.80ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2007,  Critical Feature Inspection Date: October 2007,  Underwater Inspection Date: August 2003,  Bridge Improvement Cost: $3,049,000,  Roadway Improvement Cost: $1,759,000,  Total Project Cost: $4,808,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 333899,  Location: 1.0 MI S OF FELTS MILLS (Lat: 44.012153,  Lng: -75.750575),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 347 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 416 (year 2025),  Features Intersected: FELTS MILLS CREEK,  Facility Carried by Structure: PERRIGO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.7m (18.7ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Fair,  Superstructure: Excellent,  Substructure: Good,  Channel: Satisfactory,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $3,049,000,  Roadway Improvement Cost: $1,759,000,  Total Project Cost: $4,808,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 3339,  Location: 1 MI SE OF FELTS MILLS (Lat: 44.009781,  Lng: -75.743492),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 493 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 592 (year 2026),  Features Intersected: FELTS MILLS CREEK,  Facility Carried by Structure: COUNTY ROAD 144
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.7m (18.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 82.5 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $3,049,000,  Roadway Improvement Cost: $1,759,000,  Total Project Cost: $4,808,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular New York forum

Back to: Rutland, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.