![]() |
Bridge Statistics for Rutland, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Rutland, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 13 Total length: 32 meters (105ft) Total costs: $23,936,000 Total average daily traffic: 19,789 Total average daily truck traffic: 1,523 Total future (year 2017) average daily traffic: 23,192 National Bridge Inventory (NBI) Registered Bridges for Rutland
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 100054, Location: 0.5 MI E JCT RTS 3 + 342 (Lat: 44.003703, Lng: -75.806058), Route carried "on" structure: State highway 3, Year Built: 1948, Year Reconstructed: 1983, Status: Open, Structure Length: 6.82m (22.38ft), Average Daily Traffic: 6,891 (year 2005), Truck Traffic: 7%, Average Future Daily Traffic: 7,937 (year 2025), Design Load: H 20, Features Intersected: BLACK RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.499, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.6m (34.8ft), Skew: 2 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 22.2m (72.8ft), Curb-To-Curb Width: 10.7m (35.1ft), Out-to-Out Width: 11.3m (37.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Channel: Very good, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 6.82m (22.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $1,667,000, Roadway Improvement Cost: $991,000, Total Project Cost: $2,658,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 100056, Location: 3.4 MI E JCT SH 3 + SH 34 (Lat: 44.019778, Lng: -75.761369), Route carried "on" structure: State highway 3, Year Built: 1947, Status: Open, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 5,900 (year 2005), Truck Traffic: 7%, Average Future Daily Traffic: 6,796 (year 2025), Design Load: H 20, Features Intersected: DEERLICK CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 10.922, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft) Condition: Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 70.0 metric tons, Inventory Rating: 27.5 metric tons, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 0.79m (2.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $239,000, Roadway Improvement Cost: $142,000, Total Project Cost: $381,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 100964, Location: 4.0 MI.E.JCT.RTES 3+12 (Lat: 43.915156, Lng: -75.760825), Route carried "on" structure: State highway 12, Year Built: 1984, Status: Open, Structure Length: 1.15m (3.77ft), Average Daily Traffic: 2,910 (year 2005), Truck Traffic: 14%, Average Future Daily Traffic: 3,552 (year 2025), Design Load: HS 20, Features Intersected: SANDY CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.916, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.4m (40.7ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.3m (33.8ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 13.1m (43.0ft) Condition: Deck: Excellent, Superstructure: Very good, Substructure: Good, Channel: Very good, Operating Rating: 87.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.15m (3.77ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $1,693,000, Roadway Improvement Cost: $1,007,000, Total Project Cost: $2,700,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 322019, Location: LOCATED IN FELTS MILLS (Lat: 44.022053, Lng: -75.762464), Route carried "on" structure: City street , Year Built: 1910, Status: Open, Structure Length: 0.91m (2.99ft), Average Daily Traffic: 103 (year 2003), Truck Traffic: 3%, Average Future Daily Traffic: 124 (year 2023), Features Intersected: FELTS MILLS CREEK, Facility Carried by Structure: OLD STATE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 13.1m (43.0ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.7m (22.0ft), Curb or Sidewalk Widths: Left: 1.6m (5.2ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 13.1m (43.0ft), Out-to-Out Width: 16.4m (53.8ft) Condition: Superstructure: Fair, Substructure: Fair, Channel: Very good, Structural Evaluation: High priority of corrective action, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.91m (2.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $324,000, Roadway Improvement Cost: $193,000, Total Project Cost: $517,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 333834, Location: 2 MILES E OF TYLERVILLE (Lat: 43.906039, Lng: -75.777925), Route carried "on" structure: County highway , Year Built: 1998, Status: Open, Structure Length: 1.00m (3.28ft), Average Daily Traffic: 108 (year 2001), Truck Traffic: 4%, Average Future Daily Traffic: 130 (year 2021), Design Load: HS 20, Features Intersected: SANDY CREEK, Facility Carried by Structure: SANDY CREEK ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.8m (28.9ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.5m (27.9ft), Curb-To-Curb Width: 8.8m (28.9ft), Out-to-Out Width: 9.7m (31.8ft) Condition: Deck: Excellent, Superstructure: Very good, Substructure: Good, Channel: Very good, Operating Rating: 66.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.00m (3.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $211,000, Roadway Improvement Cost: $126,000, Total Project Cost: $337,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 333873, Location: 1.5 MI NE OF TYLERVILLE (Lat: 43.905261, Lng: -75.767475), Route carried "on" structure: County highway , Year Built: 1999, Status: Open, Structure Length: 1.37m (4.49ft), Average Daily Traffic: 61 (year 1997), Truck Traffic: 4%, Average Future Daily Traffic: 73 (year 2017), Features Intersected: STEBBINS CREEK, Facility Carried by Structure: SANDY CREEK ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 13.1m (43.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 9.7m (31.8ft) Condition: Deck: Excellent, Superstructure: Very good, Substructure: Very good, Channel: Excellent, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.37m (4.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $482,000, Roadway Improvement Cost: $287,000, Total Project Cost: $769,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 333874, Location: 2 MI NE OF TYLERVILLE (Lat: 43.903808, Lng: -75.759369), Route carried "on" structure: County highway , Year Built: 1964, Status: Open, Structure Length: 1.21m (3.97ft), Average Daily Traffic: 71 (year 2003), Truck Traffic: 4%, Average Future Daily Traffic: 85 (year 2023), Features Intersected: STEBBINS CREEK, Facility Carried by Structure: SANDY CREEK ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 5.7m (18.7ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.8m (38.7ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.0m (26.2ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Channel: Very good, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 68.9 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.21m (3.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $482,000, Roadway Improvement Cost: $287,000, Total Project Cost: $769,000 ( Estimate for 2007), Deck Structure Type: Open Grating Find on map >>
Structure Number: 333892, Location: 4.0 MI SW OF RUTLAND CENT (Lat: 43.890842, Lng: -75.813150), Route carried "on" structure: Other road , Year Built: 1939, Status: Posted for load, Structure Length: 1.73m (5.68ft), Average Daily Traffic: 39 (year 2003), Truck Traffic: 4%, Average Future Daily Traffic: 47 (year 2023), Features Intersected: SANDY CREEK, Facility Carried by Structure: MALTBY ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: County Highway Agency, Approaching Roadway Width: 4.2m (13.8ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Length of Maximum Span: 15.5m (50.9ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 5.4m (17.7ft), Out-to-Out Width: 6.0m (19.7ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Channel: Very good, Operating Rating: 29.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 18.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 1.73m (5.68ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: August 2007, Critical Feature Inspection Date: August 2007, Bridge Improvement Cost: $228,000, Roadway Improvement Cost: $136,000, Total Project Cost: $364,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 333893, Location: 1 MI SW OF TYLERVILLE (Lat: 43.890542, Lng: -75.811264), Route carried "on" structure: City street , Year Built: 1940, Status: Open, Structure Length: 1.21m (3.97ft), Average Daily Traffic: 3 (year 1998), Truck Traffic: 4%, Average Future Daily Traffic: 4 (year 2018), Features Intersected: DYKE BROOK, Facility Carried by Structure: CURTIS ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: County Highway Agency, Approaching Roadway Width: 3.0m (9.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.5m (37.7ft), Curb-To-Curb Width: 4.9m (16.1ft), Out-to-Out Width: 6.1m (20.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 28.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.21m (3.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $162,000, Roadway Improvement Cost: $97,000, Total Project Cost: $259,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 333894, Location: IN TYLERVILLE (Lat: 43.900131, Lng: -75.798953), Route carried "on" structure: City street , Year Built: 2000, Status: Open, Structure Length: 1.01m (3.31ft), Average Daily Traffic: 35 (year 2000), Truck Traffic: 4%, Average Future Daily Traffic: 42 (year 2020), Design Load: HS 25, Features Intersected: SANDY CREEK, Facility Carried by Structure: O DELL ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.1m (29.9ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 21.9m (71.9ft) Condition: Superstructure: Very good, Substructure: Very good, Channel: Excellent, Operating Rating: 78.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.01m (3.31ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $475,000, Roadway Improvement Cost: $283,000, Total Project Cost: $758,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 333896, Location: 1 MI NE OF BLACK RIVER (Lat: 44.022878, Lng: -75.765772), Route carried "on" structure: Other road 971V, Year Built: 1953, Status: Open, Structure Length: 12.74m (41.80ft), Average Daily Traffic: 2,828 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 3,394 (year 2026), Design Load: HS 20, Features Intersected: BLACK RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.160, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 8.2m (26.9ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 5, Length of Maximum Span: 38.4m (126.0ft), Curb or Sidewalk Widths: Left: 1.6m (5.2ft), Right: 1.6m (5.2ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 13.4m (44.0ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Good, Channel: Very good, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 12.74m (41.80ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: October 2007, Critical Feature Inspection Date: October 2007, Underwater Inspection Date: August 2003, Bridge Improvement Cost: $3,049,000, Roadway Improvement Cost: $1,759,000, Total Project Cost: $4,808,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 333899, Location: 1.0 MI S OF FELTS MILLS (Lat: 44.012153, Lng: -75.750575), Route carried "on" structure: City street , Year Built: 1987, Status: Open, Structure Length: 1.34m (4.40ft), Average Daily Traffic: 347 (year 2005), Truck Traffic: 3%, Average Future Daily Traffic: 416 (year 2025), Features Intersected: FELTS MILLS CREEK, Facility Carried by Structure: PERRIGO ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 5.7m (18.7ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.8m (42.0ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.2m (30.2ft) Condition: Deck: Fair, Superstructure: Excellent, Substructure: Good, Channel: Satisfactory, Structural Evaluation: High priority of corrective action, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.34m (4.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $3,049,000, Roadway Improvement Cost: $1,759,000, Total Project Cost: $4,808,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 3339, Location: 1 MI SE OF FELTS MILLS (Lat: 44.009781, Lng: -75.743492), Route carried "on" structure: County highway , Year Built: 1975, Status: Open, Structure Length: 1.46m (4.79ft), Average Daily Traffic: 493 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 592 (year 2026), Features Intersected: FELTS MILLS CREEK, Facility Carried by Structure: COUNTY ROAD 144 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 5.7m (18.7ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.0m (45.9ft), Curb-To-Curb Width: 7.8m (25.6ft), Out-to-Out Width: 8.5m (27.9ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 82.5 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.46m (4.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $3,049,000, Roadway Improvement Cost: $1,759,000, Total Project Cost: $4,808,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Discuss this city on our hugely popular New York forum Back to: Rutland, NY, New York, All US cities.
|
![]() |