Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for San Felipe Pueblo, New Mexico (NM)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 230ft / 69.6mTotal length
  • $519,000Total costs
  • 214,244Total average daily traffic
  • 77,462Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for San Felipe Pueblo
  • No street view available for this location

New bridges in San Felipe Pueblo, NM - historical statistics
  • New bridges - historical statistics
  • 11960-1969
  • 11970-1979
  • 101980-1989
Average Bridge Daily Traffic in San Felipe Pueblo, NM
Average Bridge Truck Traffic in San Felipe Pueblo, NM
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 37.5%Satisfactory
  • 12.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 62.5%Good
  • 37.5%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Satisfactory
  • 50.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Good
  • 83.3%Satisfactory
Find on map >>   Show street view

Structure Number: 8362,  Location: 10.5 Mi N of Jct US-550 (Lat: 35.419247,  Lng: -106.404072),  Route carried "on" structure: Ramp Interstate 2252,  Year Built: 1983,  Status: Open,  Structure Length: 12.22m (40.09ft),  Average Daily Traffic: 968 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 1,657 (year 2040),  Design Load: HS 20,  Features Intersected: Tonque Arroyo
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.3m (27.2ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8373,  Location: San Felipe Interchange (Lat: 35.417797,  Lng: -106.405306),  Route carried "on" structure: Interstate 25,  Year Built: 1984,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 30,964 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 53,008 (year 2040),  Design Load: HS 20,  Features Intersected: San Felipe Pueblo X-Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 406.118,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.6m (41.3ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 46.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8374,  Location: 10.5 M N Jct i-25/US-550 (Lat: 35.417647,  Lng: -106.405033),  Route carried "on" structure: Interstate 25,  Year Built: 1984,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 30,964 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 53,008 (year 2040),  Design Load: HS 20,  Features Intersected: San Felipe Pueblo X-Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 406.118,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.6m (41.3ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 46.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8375,  Location: 10.5 M N JCT US-550 (Lat: 35.418853,  Lng: -106.403375),  Route carried "on" structure: Interstate 25,  Year Built: 1984,  Status: Open,  Structure Length: 10.39m (34.09ft),  Average Daily Traffic: 30,964 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 53,008 (year 2040),  Design Load: HS 20,  Features Intersected: Tonque Arroyo
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 406.359,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 51.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8376,  Location: 10.5 Mi N of Jct US-550 (Lat: 35.418728,  Lng: -106.403061),  Route carried "on" structure: Interstate 25,  Year Built: 1984,  Status: Open,  Structure Length: 10.33m (33.89ft),  Average Daily Traffic: 30,964 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 53,008 (year 2040),  Design Load: HS 20,  Features Intersected: Tonque Arroyo
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 406.359,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.6m (41.3ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 51.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8422,  Location: 12.3 Mi N Jct I-25/US-550 (Lat: 35.434678,  Lng: -106.378261),  Route carried "on" structure: Interstate 25,  Year Built: 1983,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 28,194 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 48,265 (year 2040),  Design Load: HS 20,  Features Intersected: Arroyo De Los Tanos
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 409.578,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8438,  Location: SanFelipe gradeseparation (Lat: 35.401208,  Lng: -106.435639),  Route carried "on" structure: State highway 2084,  Year Built: 1984,  Status: Open,  Structure Length: 9.33m (30.61ft),  Average Daily Traffic: 152 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 284 (year 2040),  Design Load: HS 20,  Features Intersected: I-25 NBL and SBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 61.0m (200.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: M101,  Location: IN SAN FELIPE PUEBL0 (Lat: 35.440053,  Lng: -106.442750),  Route carried "on" structure: Federal lands road 85,  Year Built: 1972,  Status: Open,  Structure Length: 12.25m (40.19ft),  Average Daily Traffic: 1,500 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,000 (year 2041),  Features Intersected: RIO GRANDE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.400,  Lanes on structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 24.5m (80.4ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 44.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 15.00m (49.21ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Underwater Inspection Date: June 2019,  Total Project Cost: $519,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10084,  Location: 7.94 MI N Jct I-25/US-550 (Lat: 35.399767,  Lng: -106.438550),  Route carried "on" structure: Interstate 25,  Year Built: 1960,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 26,720 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 45,742 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 402.658,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 42.1m (138.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 8373,  Location: San Felipe Interchange (Lat: 35.417797,  Lng: -106.405306),  Route carried "under" structure: State highway 2085,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 3,067 (year 2020),  Truck Traffic: 16%,  Features Intersected: San Felipe Pueblo X-Rd,  Facility Carried by Structure: I-25 SBL
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 8374,  Location: 10.5 M N Jct i-25/US-550 (Lat: 35.417647,  Lng: -106.405033),  Route carried "under" structure: State highway 2085,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 3,067 (year 2020),  Truck Traffic: 16%,  Features Intersected: San Felipe Pueblo X-Rd,  Facility Carried by Structure: I-25 NBL
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 8438,  Location: SanFelipe gradeseparation (Lat: 35.401208,  Lng: -106.435639),  Route carried "under" structure: Interstate 25,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 26,720 (year 2020),  Truck Traffic: 37%,  Features Intersected: I-25 NBL and SBL,  Facility Carried by Structure: FR-2084
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 402.449,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 61.0m (200.1ft)

Discuss San Felipe Pueblo, New Mexico (NM) on our hugely popular New Mexico forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.