U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for San Jose, California (CA) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: San Jose, CA, California, California forum, All US cities.





Parts: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12


National Bridge Inventory (NBI) Statistics
Number of bridges: 676
Total length: 13,473 meters (44,203ft)
Total costs: $221,565,000
Total average daily traffic: 33,356,384
Total average daily truck traffic: 1,672,743
National Bridge Inventory (NBI) Registered Bridges for San Jose
No street view available for this location

New bridges - Historical Statistics

  • 1900-1909: 2
  • 1910-1919: 3
  • 1920-1929: 8
  • 1930-1939: 15
  • 1940-1949: 9
  • 1950-1959: 24
  • 1960-1969: 92
  • 1970-1979: 219
  • 1980-1989: 66
  • 1990-1999: 191
  • 2000-2009: 47

Reconstructed bridges - Historical Statistics

  • 1940-1949: 1
  • 1950-1959: 6
  • 1960-1969: 7
  • 1970-1979: 11
  • 1980-1989: 14
  • 1990-1999: 24
  • 2000-2009: 16

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>   Show street view

Structure Number: 37 0259S,  Location: 04-SCL-280-R3.87-SJS (Lat: 37.315000,  Lng: -121.910278),  Route carried "under" structure: City street ,  Year Built: 1972,  Structure Length: 25.39m (83.30ft),  Average Daily Traffic: 8,500 (year 1998),  Truck Traffic: 2%,  Features Intersected: I-280 & RACE STREET,  Facility Carried by Structure: NB I-280 OFF-RAMP
Minimum Vertical Clearance: 0.46m (1.51ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.6m (159.4ft)

Find on map >>   Show street view

Structure Number: 37 026,  Location: 04-SCL-280-R3.76-SJS (Lat: 37.315000,  Lng: -121.910000),  Route carried "under" structure: Interstate 280,  Year Built: 1970,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 196,000 (year 2009),  Truck Traffic: 1%,  Features Intersected: INTERSTATE 280,  Facility Carried by Structure: RACE STREET
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.376,  Lanes on structure: 3,  Lanes under structure: 11,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 37 0262L,  Location: 04-SCL-280-R3.51-SJS (Lat: 37.315992,  Lng: -121.906833),  Route carried "under" structure: City street C261,  Year Built: 1969,  Structure Length: 4.32m (14.17ft),  Average Daily Traffic: 39,700 (year 2002),  Truck Traffic: 4%,  Features Intersected: LINCOLN AVENUE,  Facility Carried by Structure: INTERSTATE 280 SB
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 37 0262R,  Location: 04-SCL-280-R3.51-SJS (Lat: 37.316194,  Lng: -121.906978),  Route carried "under" structure: City street C261,  Year Built: 1969,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 39,700 (year 2002),  Truck Traffic: 4%,  Features Intersected: LINCOLN AVENUE,  Facility Carried by Structure: INTERSTATE 280 NB
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 37 0262S,  Location: 04-SCL-280-R3.5-SJS (Lat: 37.316350,  Lng: -121.907097),  Route carried "under" structure: City street C261,  Year Built: 1969,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 39,700 (year 2002),  Truck Traffic: 4%,  Features Intersected: LINCOLN AVENUE,  Facility Carried by Structure: SB I-280 OFF RAMP
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>   Show street view

Structure Number: 37 0266,  Location: 04-SCL-280-R3.02-SJS (Lat: 37.320000,  Lng: -121.898333),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1969,  Structure Length: 10.73m (35.20ft),  Average Daily Traffic: 15,300 (year 2002),  Truck Traffic: 4%,  Features Intersected: UP RR & AMTRAK
Minimum Vertical Clearance: 6.65m (21.82ft),  Kilometerpoint: 0.302,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 37 0266,  Location: 04-SCL-280-R3.02-SJS (Lat: 37.320000,  Lng: -121.898333),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1969,  Structure Length: 10.73m (35.20ft),  Average Daily Traffic: 12,500 (year 2002),  Truck Traffic: 4%,  Features Intersected: UP RR & AMTRAK
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.302,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 37 0266,  Location: 04-SCL-280-R3.02-SJS (Lat: 37.320000,  Lng: -121.898333),  Route carried "under" structure: Interstate 280,  Year Built: 1969,  Structure Length: 10.73m (35.20ft),  Average Daily Traffic: 196,000 (year 2009),  Truck Traffic: 1%,  Features Intersected: UP RR & AMTRAK
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 0.302,  Lanes under structure: 10,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 37 0267,  Location: 04-SCL-280-R2.87-SJS (Lat: 37.321667,  Lng: -121.896667),  Route carried "under" structure: Interstate 280,  Year Built: 1969,  Structure Length: 8.81m (28.90ft),  Average Daily Traffic: 196,000 (year 2009),  Truck Traffic: 1%,  Features Intersected: S280-87, I280, 87-N280,  Facility Carried by Structure: BIRD AVENUE
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 0.287,  Lanes on structure: 8,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 37 0268K,  Location: 04-SCL-280-R2.76-SJS (Lat: 37.323333,  Lng: -121.895000),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1972,  Structure Length: 9.18m (30.12ft),  Average Daily Traffic: 27,000 (year 1998),  Truck Traffic: 2%,  Features Intersected: S280-ROUTE 87 CONNECTOR
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 0.276,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.8m (130.6ft)

Find on map >>   Show street view

Structure Number: 37 0270H,  Location: 04-SCL-280-R2.5-SJS (Lat: 37.323333,  Lng: -121.891667),  Route carried "under" structure: Ramp State highway 87,  Year Built: 1971,  Structure Length: 62.12m (203.81ft),  Average Daily Traffic: 27,500 (year 2002),  Truck Traffic: 4%,  Features Intersected: I 280 & SR 87, ST & RMPS
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.514,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 37 0270H,  Location: 04-SCL-280-R2.5-SJS (Lat: 37.323333,  Lng: -121.891667),  Route carried "under" structure: City street C274,  Year Built: 1971,  Structure Length: 62.12m (203.81ft),  Average Daily Traffic: 29,500 (year 1998),  Truck Traffic: 4%,  Features Intersected: I 280 & SR 87, ST & RMPS,  Facility Carried by Structure: N&S I280 - N&S 87
Minimum Vertical Clearance: 0.53m (1.74ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 37 0270H,  Location: 04-SCL-280-R2.5-SJS (Lat: 37.323333,  Lng: -121.891667),  Route carried "under" structure: City street C054,  Year Built: 1971,  Structure Length: 62.12m (203.81ft),  Average Daily Traffic: 7,080 (year 1998),  Truck Traffic: 4%,  Features Intersected: I 280 & SR 87, ST & RMPS,  Facility Carried by Structure: N&S I280 - N&S 87
Minimum Vertical Clearance: 0.50m (1.64ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 37 0270H,  Location: 04-SCL-280-R2.5-SJS (Lat: 37.323333,  Lng: -121.891667),  Route carried "under" structure: Interstate 280,  Year Built: 1971,  Structure Length: 62.12m (203.81ft),  Average Daily Traffic: 187,000 (year 1998),  Truck Traffic: 4%,  Features Intersected: I 280 & SR 87, ST & RMPS
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.025,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 37 0270H,  Location: 04-SCL-280-R2.5-SJS (Lat: 37.323333,  Lng: -121.891667),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1971,  Structure Length: 62.12m (203.81ft),  Average Daily Traffic: 15,600 (year 2002),  Truck Traffic: 4%,  Features Intersected: I 280 & SR 87, ST & RMPS
Minimum Vertical Clearance: 0.52m (1.71ft),  Kilometerpoint: 0.025,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 37 0270H,  Location: 04-SCL-280-R2.5-SJS (Lat: 37.323333,  Lng: -121.891667),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1971,  Structure Length: 62.12m (203.81ft),  Average Daily Traffic: 17,200 (year 2002),  Truck Traffic: 4%,  Features Intersected: I 280 & SR 87, ST & RMPS
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.025,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 37 0270H,  Location: 04-SCL-280-R2.5-SJS (Lat: 37.323333,  Lng: -121.891667),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1971,  Structure Length: 62.12m (203.81ft),  Average Daily Traffic: 9,500 (year 2002),  Truck Traffic: 4%,  Features Intersected: I 280 & SR 87, ST & RMPS
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 0.025,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 37 0270H,  Location: 04-SCL-280-R2.5-SJS (Lat: 37.323333,  Lng: -121.891667),  Route carried "under" structure: State highway 87,  Year Built: 1971,  Structure Length: 62.12m (203.81ft),  Average Daily Traffic: 95,000 (year 1999),  Truck Traffic: 5%,  Features Intersected: I 280 & SR 87, ST & RMPS
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.516,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 37 0270H,  Location: 04-SCL-280-R2.5-SJS (Lat: 37.323333,  Lng: -121.891667),  Route carried "under" structure: Ramp State highway 87,  Year Built: 1971,  Structure Length: 62.12m (203.81ft),  Average Daily Traffic: 4,100 (year 2001),  Truck Traffic: 5%,  Features Intersected: I 280 & SR 87, ST & RMPS
Minimum Vertical Clearance: 0.48m (1.57ft),  Kilometerpoint: 0.516,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 37 0273F,  Location: 04-SCL-087-5.23-SJS (Lat: 37.324464,  Lng: -121.893975),  Route carried "under" structure: Ramp State highway 87,  Year Built: 1970,  Structure Length: 21.62m (70.93ft),  Average Daily Traffic: 19,700 (year 2001),  Truck Traffic: 4%,  Features Intersected: N87-N280,AUZERAIS,ON-RMP
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.523,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 37 0273F,  Location: 04-SCL-087-5.23-SJS (Lat: 37.324464,  Lng: -121.893975),  Route carried "under" structure: City street C054,  Year Built: 1970,  Structure Length: 21.62m (70.93ft),  Average Daily Traffic: 7,080 (year 1998),  Truck Traffic: 3%,  Features Intersected: N87-N280,AUZERAIS,ON-RMP,  Facility Carried by Structure: S87- N&S 280 CONN
Minimum Vertical Clearance: 7.19m (23.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 37 0273F,  Location: 04-SCL-087-5.23-SJS (Lat: 37.324464,  Lng: -121.893975),  Route carried "under" structure: Ramp State highway 87,  Year Built: 1970,  Structure Length: 21.62m (70.93ft),  Average Daily Traffic: 5,000 (year 1998),  Truck Traffic: 2%,  Features Intersected: N87-N280,AUZERAIS,ON-RMP
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.523,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 37 0273L,  Location: 04-SCL-087-5.22-SJS (Lat: 37.324547,  Lng: -121.892775),  Route carried "under" structure: Ramp State highway 87,  Year Built: 1970,  Structure Length: 23.64m (77.56ft),  Average Daily Traffic: 19,700 (year 2001),  Truck Traffic: 2%,  Features Intersected: N87-N280 CONN & AUZERAIS
Minimum Vertical Clearance: 0.64m (2.10ft),  Kilometerpoint: 0.522,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.1m (98.8ft)

Find on map >>   Show street view

Structure Number: 37 0273L,  Location: 04-SCL-087-5.22-SJS (Lat: 37.324547,  Lng: -121.892775),  Route carried "under" structure: City street C054,  Year Built: 1970,  Structure Length: 23.64m (77.56ft),  Average Daily Traffic: 7,080 (year 1998),  Truck Traffic: 3%,  Features Intersected: N87-N280 CONN & AUZERAIS,  Facility Carried by Structure: SB STATE ROUTE 87
Minimum Vertical Clearance: 4.77m (15.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.1m (98.8ft)

Find on map >>   Show street view

Structure Number: 37 0273R,  Location: 04-SCL-087-5.21-SJS (Lat: 37.324556,  Lng: -121.892281),  Route carried "under" structure: Ramp State highway 87,  Year Built: 1970,  Structure Length: 25.02m (82.09ft),  Average Daily Traffic: 19,700 (year 2001),  Truck Traffic: 2%,  Features Intersected: N87-N280 CON & AUZERAIS
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 0.521,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.1m (98.8ft)

Find on map >>   Show street view

Structure Number: 37 0273R,  Location: 04-SCL-087-5.21-SJS (Lat: 37.324556,  Lng: -121.892281),  Route carried "under" structure: City street C054,  Year Built: 1970,  Structure Length: 25.02m (82.09ft),  Average Daily Traffic: 7,080 (year 1998),  Truck Traffic: 3%,  Features Intersected: N87-N280 CON & AUZERAIS,  Facility Carried by Structure: NB ROUTE 87 & RAMP
Minimum Vertical Clearance: 0.48m (1.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.1m (98.8ft)

Find on map >>   Show street view

Structure Number: 37 0274,  Location: 04-SCL-087-5.45-SJS (Lat: 37.327753,  Lng: -121.894331),  Route carried "under" structure: State highway 82,  Year Built: 1971,  Structure Length: 4.40m (14.44ft),  Average Daily Traffic: 15,000 (year 2009),  Truck Traffic: 3%,  Features Intersected: STATE ROUTE 82,  Facility Carried by Structure: RTE 87 & CONNECTOR
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.772,  Lanes on structure: 11,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 37 0275L,  Location: 04-SCL-280-R2.19-SJS (Lat: 37.323333,  Lng: -121.890000),  Route carried "under" structure: City street C265,  Year Built: 1971,  Structure Length: 76.23m (250.10ft),  Average Daily Traffic: 15,327 (year 2000),  Truck Traffic: 2%,  Features Intersected: SR 87,CONS,GUADALUPE,STS,  Facility Carried by Structure: SB INTERSTATE 280
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 37 0275L,  Location: 04-SCL-280-R2.19-SJS (Lat: 37.323333,  Lng: -121.890000),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 76.23m (250.10ft),  Average Daily Traffic: 10,000 (year 2000),  Truck Traffic: 2%,  Features Intersected: SR 87,CONS,GUADALUPE,STS,  Facility Carried by Structure: SB INTERSTATE 280
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 37 0275L,  Location: 04-SCL-280-R2.19-SJS (Lat: 37.323333,  Lng: -121.890000),  Route carried "under" structure: City street C274,  Year Built: 1971,  Structure Length: 76.23m (250.10ft),  Average Daily Traffic: 15,327 (year 2000),  Truck Traffic: 2%,  Features Intersected: SR 87,CONS,GUADALUPE,STS,  Facility Carried by Structure: SB INTERSTATE 280
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 37 0275L,  Location: 04-SCL-280-R2.19-SJS (Lat: 37.323333,  Lng: -121.890000),  Route carried "under" structure: Ramp State highway 87,  Year Built: 1971,  Structure Length: 76.23m (250.10ft),  Average Daily Traffic: 4,100 (year 2001),  Truck Traffic: 2%,  Features Intersected: SR 87,CONS,GUADALUPE,STS,  Facility Carried by Structure: SB INTERSTATE 280
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.051,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 37 0275L,  Location: 04-SCL-280-R2.19-SJS (Lat: 37.323333,  Lng: -121.890000),  Route carried "under" structure: Ramp State highway 87,  Year Built: 1971,  Structure Length: 76.23m (250.10ft),  Average Daily Traffic: 52,400 (year 1997),  Truck Traffic: 2%,  Features Intersected: SR 87,CONS,GUADALUPE,STS,  Facility Carried by Structure: SB INTERSTATE 280
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.051,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 37 0275L,  Location: 04-SCL-280-R2.19-SJS (Lat: 37.323333,  Lng: -121.890000),  Route carried "under" structure: State highway 87,  Year Built: 1971,  Structure Length: 76.23m (250.10ft),  Average Daily Traffic: 130,000 (year 2009),  Truck Traffic: 3%,  Features Intersected: SR 87,CONS,GUADALUPE,STS,  Facility Carried by Structure: SB INTERSTATE 280
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.051,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 37 0275L,  Location: 04-SCL-280-R2.19-SJS (Lat: 37.323333,  Lng: -121.890000),  Route carried "under" structure: Ramp State highway 87,  Year Built: 1971,  Structure Length: 76.23m (250.10ft),  Average Daily Traffic: 52,400 (year 1997),  Truck Traffic: 2%,  Features Intersected: SR 87,CONS,GUADALUPE,STS,  Facility Carried by Structure: SB INTERSTATE 280
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 0.051,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 37 0275R,  Location: 04-SCL-280-R2.19-SJS (Lat: 37.323333,  Lng: -121.890000),  Route carried "under" structure: State highway 87,  Year Built: 1971,  Structure Length: 76.54m (251.12ft),  Average Daily Traffic: 130,000 (year 2009),  Truck Traffic: 3%,  Features Intersected: SR 87,CONNS,STRS,RIVER,  Facility Carried by Structure: NB I280 & RAMPS
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 0.051,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.8m (107.6ft)

Find on map >>   Show street view

Structure Number: 37 0275R,  Location: 04-SCL-280-R2.19-SJS (Lat: 37.323333,  Lng: -121.890000),  Route carried "under" structure: Ramp State highway 87,  Year Built: 1971,  Structure Length: 76.54m (251.12ft),  Average Daily Traffic: 19,700 (year 2001),  Truck Traffic: 4%,  Features Intersected: SR 87,CONNS,STRS,RIVER,  Facility Carried by Structure: NB I280 & RAMPS
Minimum Vertical Clearance: 8.99m (29.49ft),  Kilometerpoint: 0.051,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.8m (107.6ft)

Find on map >>   Show street view

Structure Number: 37 0275R,  Location: 04-SCL-280-R2.19-SJS (Lat: 37.323333,  Lng: -121.890000),  Route carried "under" structure: Ramp State highway 87,  Year Built: 1971,  Structure Length: 76.54m (251.12ft),  Average Daily Traffic: 27,500 (year 2002),  Truck Traffic: 4%,  Features Intersected: SR 87,CONNS,STRS,RIVER,  Facility Carried by Structure: NB I280 & RAMPS
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 0.051,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.8m (107.6ft)

Find on map >>   Show street view

Structure Number: 37 0275R,  Location: 04-SCL-280-R2.19-SJS (Lat: 37.323333,  Lng: -121.890000),  Route carried "under" structure: Ramp State highway 87,  Year Built: 1971,  Structure Length: 76.54m (251.12ft),  Average Daily Traffic: 4,100 (year 2001),  Truck Traffic: 5%,  Features Intersected: SR 87,CONNS,STRS,RIVER,  Facility Carried by Structure: NB I280 & RAMPS
Minimum Vertical Clearance: 6.93m (22.74ft),  Kilometerpoint: 0.051,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.8m (107.6ft)

Find on map >>   Show street view

Structure Number: 37 0275R,  Location: 04-SCL-280-R2.19-SJS (Lat: 37.323333,  Lng: -121.890000),  Route carried "under" structure: City street C274,  Year Built: 1971,  Structure Length: 76.54m (251.12ft),  Average Daily Traffic: 16,000 (year 1998),  Truck Traffic: 2%,  Features Intersected: SR 87,CONNS,STRS,RIVER,  Facility Carried by Structure: NB I280 & RAMPS
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.8m (107.6ft)

Find on map >>   Show street view

Structure Number: 37 0275R,  Location: 04-SCL-280-R2.19-SJS (Lat: 37.323333,  Lng: -121.890000),  Route carried "under" structure: City street C265,  Year Built: 1971,  Structure Length: 76.54m (251.12ft),  Average Daily Traffic: 16,000 (year 1998),  Truck Traffic: 2%,  Features Intersected: SR 87,CONNS,STRS,RIVER,  Facility Carried by Structure: NB I280 & RAMPS
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.8m (107.6ft)

Find on map >>   Show street view

Structure Number: 37 0275R,  Location: 04-SCL-280-R2.19-SJS (Lat: 37.323333,  Lng: -121.890000),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 76.54m (251.12ft),  Average Daily Traffic: 25,300 (year 1998),  Truck Traffic: 4%,  Features Intersected: SR 87,CONNS,STRS,RIVER,  Facility Carried by Structure: NB I280 & RAMPS
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.8m (107.6ft)

Find on map >>   Show street view

Structure Number: 37 0275R,  Location: 04-SCL-280-R2.19-SJS (Lat: 37.323333,  Lng: -121.890000),  Route carried "under" structure: Ramp State highway 87,  Year Built: 1971,  Structure Length: 76.54m (251.12ft),  Average Daily Traffic: 52,400 (year 1997),  Truck Traffic: 2%,  Features Intersected: SR 87,CONNS,STRS,RIVER,  Facility Carried by Structure: NB I280 & RAMPS
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 0.051,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.8m (107.6ft)

Find on map >>   Show street view

Structure Number: 37 0279L,  Location: 04-SCL-280-R1.85-SJS (Lat: 37.325000,  Lng: -121.881667),  Route carried "under" structure: City street C027,  Year Built: 1972,  Structure Length: 25.54m (83.79ft),  Average Daily Traffic: 14,900 (year 2004),  Truck Traffic: 4%,  Features Intersected: SR 82 (1ST ST), 2ND, 3RD,  Facility Carried by Structure: SB INTERSTATE 280
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.2m (154.9ft)

Find on map >>   Show street view

Structure Number: 37 0279L,  Location: 04-SCL-280-R1.85-SJS (Lat: 37.325000,  Lng: -121.881667),  Route carried "under" structure: City street C042,  Year Built: 1972,  Structure Length: 25.54m (83.79ft),  Average Daily Traffic: 6,425 (year 2000),  Truck Traffic: 4%,  Features Intersected: SR 82 (1ST ST), 2ND, 3RD,  Facility Carried by Structure: SB INTERSTATE 280
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.2m (154.9ft)

Find on map >>   Show street view

Structure Number: 37 0279L,  Location: 04-SCL-280-R1.85-SJS (Lat: 37.325000,  Lng: -121.881667),  Route carried "under" structure: State highway 82,  Year Built: 1972,  Structure Length: 25.54m (83.79ft),  Average Daily Traffic: 19,500 (year 2009),  Truck Traffic: 3%,  Features Intersected: SR 82 (1ST ST), 2ND, 3RD,  Facility Carried by Structure: SB INTERSTATE 280
Minimum Vertical Clearance: 0.50m (1.64ft),  Kilometerpoint: 0.069,  Lanes on structure: 6,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.2m (154.9ft)

Find on map >>   Show street view

Structure Number: 37 0279R,  Location: 04-SCL-280-R1.85-SJS (Lat: 37.325000,  Lng: -121.881667),  Route carried "under" structure: City street C042,  Year Built: 1972,  Structure Length: 25.55m (83.83ft),  Average Daily Traffic: 14,900 (year 2004),  Truck Traffic: 4%,  Features Intersected: SR 82 (1ST ST), 2ND, 3RD,  Facility Carried by Structure: NB INTERSTATE 280
Minimum Vertical Clearance: 5.76m (18.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.2m (154.9ft)

Find on map >>   Show street view

Structure Number: 37 0279R,  Location: 04-SCL-280-R1.85-SJS (Lat: 37.325000,  Lng: -121.881667),  Route carried "under" structure: City street C027,  Year Built: 1972,  Structure Length: 25.55m (83.83ft),  Average Daily Traffic: 6,425 (year 2000),  Truck Traffic: 4%,  Features Intersected: SR 82 (1ST ST), 2ND, 3RD,  Facility Carried by Structure: NB INTERSTATE 280
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.2m (154.9ft)

Find on map >>   Show street view

Structure Number: 37 0279R,  Location: 04-SCL-280-R1.85-SJS (Lat: 37.325000,  Lng: -121.881667),  Route carried "under" structure: State highway 82,  Year Built: 1972,  Structure Length: 25.55m (83.83ft),  Average Daily Traffic: 19,500 (year 2009),  Truck Traffic: 3%,  Features Intersected: SR 82 (1ST ST), 2ND, 3RD,  Facility Carried by Structure: NB INTERSTATE 280
Minimum Vertical Clearance: 5.63m (18.47ft),  Kilometerpoint: 0.069,  Lanes on structure: 6,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.2m (154.9ft)

Find on map >>   Show street view

Structure Number: 37 0280L,  Location: 04-SCL-280-R1.55-SJS (Lat: 37.328333,  Lng: -121.875000),  Route carried "under" structure: City street C044,  Year Built: 1972,  Structure Length: 18.50m (60.70ft),  Average Daily Traffic: 11,800 (year 1999),  Truck Traffic: 2%,  Features Intersected: 7TH STREET, ON-RAMP,  Facility Carried by Structure: SB INTERSTATE 280
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.2m (138.5ft)

Find on map >>   Show street view

Structure Number: 37 0280L,  Location: 04-SCL-280-R1.55-SJS (Lat: 37.328333,  Lng: -121.875000),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1972,  Structure Length: 18.50m (60.70ft),  Average Daily Traffic: 10,500 (year 2002),  Truck Traffic: 4%,  Features Intersected: 7TH STREET, ON-RAMP
Minimum Vertical Clearance: 0.52m (1.71ft),  Kilometerpoint: 0.155,  Lanes on structure: 5,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.2m (138.5ft)

Find on map >>   Show street view

Structure Number: 37 0280R,  Location: 04-SCL-280-R1.55-SJS (Lat: 37.328333,  Lng: -121.875000),  Route carried "under" structure: City street C044,  Year Built: 1972,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 11,800 (year 1999),  Truck Traffic: 2%,  Features Intersected: 7TH STREET,  Facility Carried by Structure: NB INTERSTATE 280
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 37 0280S,  Location: 04-SCL-280-R1.55-SJS (Lat: 37.328333,  Lng: -121.875000),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1972,  Structure Length: 11.22m (36.81ft),  Average Daily Traffic: 13,200 (year 2002),  Truck Traffic: 4%,  Features Intersected: 7TH STREET, OFF-RAMP
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.156,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 37 0280S,  Location: 04-SCL-280-R1.55-SJS (Lat: 37.328333,  Lng: -121.875000),  Route carried "under" structure: City street C044,  Year Built: 1972,  Structure Length: 11.22m (36.81ft),  Average Daily Traffic: 11,800 (year 1999),  Truck Traffic: 2%,  Features Intersected: 7TH STREET, OFF-RAMP,  Facility Carried by Structure: 10TH ST-NB280 RAMP
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 37 0281,  Location: 04-SCL-280-R1.29-SJS (Lat: 37.328333,  Lng: -121.871667),  Route carried "under" structure: City street C279,  Year Built: 1972,  Structure Length: 10.35m (33.96ft),  Average Daily Traffic: 15,000 (year 1998),  Truck Traffic: 2%,  Features Intersected: 10TH & 11TH STREET,  Facility Carried by Structure: INTERSTATE 280
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.8m (114.2ft)

Find on map >>   Show street view

Structure Number: 37 0281,  Location: 04-SCL-280-R1.29-SJS (Lat: 37.328333,  Lng: -121.871667),  Route carried "under" structure: City street C279,  Year Built: 1972,  Structure Length: 10.35m (33.96ft),  Average Daily Traffic: 15,300 (year 1998),  Truck Traffic: 2%,  Features Intersected: 10TH & 11TH STREET,  Facility Carried by Structure: INTERSTATE 280
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.8m (114.2ft)

Find on map >>   Show street view

Structure Number: 37 0284,  Location: 04-SCL-280-R.36-SJS (Lat: 37.335000,  Lng: -121.855000),  Route carried "under" structure: City street C041,  Year Built: 1972,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 21,700 (year 1999),  Truck Traffic: 4%,  Features Intersected: MCLAUGHLIN AVENUE,  Facility Carried by Structure: INTERSTATE 280
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 12,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 37 0285F,  Location: 04-SCL-280-R.01-SJS (Lat: 37.340000,  Lng: -121.851667),  Route carried "under" structure: US 101,  Year Built: 1974,  Structure Length: 8.40m (27.56ft),  Average Daily Traffic: 244,000 (year 1998),  Truck Traffic: 9%,  Features Intersected: U.S. HIGHWAY 101
Minimum Vertical Clearance: 0.51m (1.67ft),  Kilometerpoint: 3.485,  Lanes on structure: 1,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 37 0285F,  Location: 04-SCL-280-R.01-SJS (Lat: 37.340000,  Lng: -121.851667),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1974,  Structure Length: 8.40m (27.56ft),  Average Daily Traffic: 9,950 (year 2002),  Truck Traffic: 4%,  Features Intersected: U.S. HIGHWAY 101
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 37 0285L,  Location: 04-SCL-680-M.01-SJS (Lat: 37.340000,  Lng: -121.851667),  Route carried "under" structure: US 101,  Year Built: 1974,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 188,000 (year 2009),  Truck Traffic: 6%,  Features Intersected: U.S. HIGHWAY 101,  Facility Carried by Structure: I 280-680
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 3.487,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 37 0285R,  Location: 04-SCL-680-M.01-SJS (Lat: 37.340000,  Lng: -121.851667),  Route carried "under" structure: US 101,  Year Built: 1974,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 188,000 (year 2009),  Truck Traffic: 6%,  Features Intersected: U.S. HIGHWAY 101,  Facility Carried by Structure: INTERSTATE 280-680
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 3.487,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 37 0286,  Location: 04-SCL-680-M.38-SJS (Lat: 37.343333,  Lng: -121.845000),  Route carried "under" structure: City street C039,  Year Built: 1974,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 850 (year 2009),  Truck Traffic: 2%,  Features Intersected: KING ROAD,  Facility Carried by Structure: INTERSTATE 680
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 14,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 43.0m (141.1ft)

Find on map >>   Show street view

Structure Number: 37 0287L,  Location: 04-SCL-680-M1.19-SJS (Lat: 37.353333,  Lng: -121.836667),  Route carried "under" structure: City street C386,  Year Built: 1974,  Structure Length: 8.26m (27.10ft),  Average Daily Traffic: 1,500 (year 2009),  Truck Traffic: 2%,  Features Intersected: JACKSON AVE,  Facility Carried by Structure: INTERSTATE 680 SB
Minimum Vertical Clearance: 4.64m (15.22ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 37 0287R,  Location: 04-SCL-680-M1.19-SJS (Lat: 37.353333,  Lng: -121.836667),  Route carried "under" structure: City street C386,  Year Built: 1974,  Structure Length: 8.26m (27.10ft),  Average Daily Traffic: 1,050 (year 2009),  Truck Traffic: 2%,  Features Intersected: JACKSON AVE,  Facility Carried by Structure: INTERSTATE 680 NB
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 37 0288G,  Location: 04-SCL-680-M1.41-SJS (Lat: 37.358333,  Lng: -121.838333),  Route carried "under" structure: Ramp Interstate 680,  Year Built: 1974,  Structure Length: 11.58m (37.99ft),  Average Daily Traffic: 10,800 (year 2009),  Truck Traffic: 2%,  Features Intersected: CAPITOL EXP,CAPITOL-N680
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 0.141,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 37 0288G,  Location: 04-SCL-680-M1.41-SJS (Lat: 37.358333,  Lng: -121.838333),  Route carried "under" structure: City street C012,  Year Built: 1974,  Structure Length: 11.58m (37.99ft),  Average Daily Traffic: 5,000 (year 1998),  Truck Traffic: 2%,  Features Intersected: CAPITOL EXP,CAPITOL-N680,  Facility Carried by Structure: N680-E&W130
Minimum Vertical Clearance: 5.86m (19.23ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 37 0288K,  Location: 04-SCL-680-M1.41-SJS (Lat: 37.358333,  Lng: -121.838333),  Route carried "under" structure: City street C028,  Year Built: 1974,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 1,500 (year 2009),  Truck Traffic: 2%,  Features Intersected: CAPITOL EXPRESSWAY,  Facility Carried by Structure: I-680 ON/OFF-RAMP
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 37 0288L,  Location: 04-SCL-680-M1.41-SJS (Lat: 37.358333,  Lng: -121.838333),  Route carried "under" structure: City street C028,  Year Built: 1974,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 5,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: CAPITOL EXPRESSWAY,  Facility Carried by Structure: INTERSTATE 680 SB
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 37 0288R,  Location: 04-SCL-680-M1.41-SJS (Lat: 37.358333,  Lng: -121.838333),  Route carried "under" structure: City street C012,  Year Built: 1974,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 1,600 (year 2009),  Truck Traffic: 2%,  Features Intersected: CAPITOL EXPRESSWAY,  Facility Carried by Structure: INTERSTATE 680
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 37 0289F,  Location: 04-SCL-130-1.31-SJS (Lat: 37.357342,  Lng: -121.840239),  Route carried "under" structure: Ramp Interstate 680,  Year Built: 1974,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 10,100 (year 2003),  Truck Traffic: 2%,  Features Intersected: S680-CAPITOL XPWY RAMP
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 0.156,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 37 029,  Location: 04-SCL-130-1.32-SJS (Lat: 37.359644,  Lng: -121.841136),  Route carried "under" structure: Interstate 680,  Year Built: 1974,  Structure Length: 9.11m (29.89ft),  Average Daily Traffic: 160,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: INTERSTATE 680,  Facility Carried by Structure: STATE ROUTE 130
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.174,  Lanes on structure: 4,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.9m (163.7ft)

Find on map >>   Show street view

Structure Number: 37 029,  Location: 04-SCL-130-1.32-SJS (Lat: 37.359644,  Lng: -121.841136),  Route carried "under" structure: Ramp State highway 130,  Year Built: 1974,  Structure Length: 9.11m (29.89ft),  Average Daily Traffic: 14,400 (year 2003),  Truck Traffic: 5%,  Features Intersected: INTERSTATE 680
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 0.133,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.9m (163.7ft)

Find on map >>   Show street view

Structure Number: 37 0291,  Location: 04-SCL-680-M2-SJS (Lat: 37.363333,  Lng: -121.841667),  Route carried "under" structure: Interstate 680,  Year Built: 1974,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 160,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: INTERSTATE 680,  Facility Carried by Structure: MADDEN AVE POC
Minimum Vertical Clearance: 6.63m (21.75ft),  Kilometerpoint: 0.020,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: 37 0292,  Location: 04-SCL-680-M2.38-SJS (Lat: 37.368333,  Lng: -121.845000),  Route carried "under" structure: Interstate 680,  Year Built: 1974,  Structure Length: 9.91m (32.51ft),  Average Daily Traffic: 175,000 (year 2009),  Truck Traffic: 5%,  Features Intersected: INTERSTATE 680,  Facility Carried by Structure: MCKEE ROAD
Minimum Vertical Clearance: 0.52m (1.71ft),  Kilometerpoint: 0.238,  Lanes on structure: 7,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 37 0293,  Location: 04-SCL-680-M3.14-SJS (Lat: 37.376667,  Lng: -121.853333),  Route carried "under" structure: Interstate 680,  Year Built: 1974,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 175,000 (year 2009),  Truck Traffic: 5%,  Features Intersected: INTERSTATE 680,  Facility Carried by Structure: MABURY ROAD
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 0.314,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 37 0296,  Location: 04-SCL-680-M4.78-SJS (Lat: 37.395000,  Lng: -121.873333),  Route carried "under" structure: County highway C021,  Year Built: 1974,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 90,000 (year 2009),  Truck Traffic: 5%,  Features Intersected: HOSTETTER ROAD,  Facility Carried by Structure: INTERSTATE 680
Minimum Vertical Clearance: 0.51m (1.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 9,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 50.0m (164.0ft)

Find on map >>   Show street view

Structure Number: 37 0297,  Location: 04-SCL-680-M5.07-SJS (Lat: 37.400000,  Lng: -121.875000),  Route carried "under" structure: County highway C026,  Year Built: 1974,  Structure Length: 8.56m (28.08ft),  Average Daily Traffic: 1,500 (year 2009),  Truck Traffic: 2%,  Features Intersected: CAPITOL AVENUE,  Facility Carried by Structure: INTERSTATE 680
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 37 0298,  Location: 04-SCL-680-M5.54-SJS (Lat: 37.405000,  Lng: -121.876667),  Route carried "under" structure: Interstate 680,  Year Built: 1974,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 175,000 (year 2009),  Truck Traffic: 5%,  Features Intersected: ROUTE 680,  Facility Carried by Structure: CROPLEY AVENUE
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.554,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 37 0308,  Location: 04-SCL-087-5.67-SJS (Lat: 37.330514,  Lng: -121.896078),  Route carried "under" structure: City street C277,  Year Built: 1978,  Structure Length: 31.11m (102.07ft),  Average Daily Traffic: 24,635 (year 1998),  Truck Traffic: 5%,  Features Intersected: GUADALUPE RIVER & ROADS,  Facility Carried by Structure: STATE ROUTE 87
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.3m (155.2ft)

Find on map >>   Show street view

Structure Number: 37 0308,  Location: 04-SCL-087-5.67-SJS (Lat: 37.330514,  Lng: -121.896078),  Route carried "under" structure: City street C030,  Year Built: 1978,  Structure Length: 31.11m (102.07ft),  Average Daily Traffic: 8,270 (year 1998),  Truck Traffic: 3%,  Features Intersected: GUADALUPE RIVER & ROADS,  Facility Carried by Structure: STATE ROUTE 87
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.3m (155.2ft)

Find on map >>   Show street view

Structure Number: 37 031,  Location: 04-SCL-087-5.56-SJS (Lat: 37.329089,  Lng: -121.895453),  Route carried "under" structure: City street C260,  Year Built: 1978,  Structure Length: 5.75m (18.86ft),  Average Daily Traffic: 10,900 (year 1998),  Truck Traffic: 5%,  Features Intersected: PARK AVENUE,  Facility Carried by Structure: STATE ROUTE 87
Minimum Vertical Clearance: 6.02m (19.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 37 0311,  Location: 04-SCL-087-6.27-SJS (Lat: 37.339119,  Lng: -121.898422),  Route carried "under" structure: City street ,  Year Built: 1988,  Structure Length: 39.62m (129.99ft),  Average Daily Traffic: 13,440 (year 1999),  Truck Traffic: 10%,  Features Intersected: UP RR, AMTRAK, STREETS,  Facility Carried by Structure: STATE ROUTE 87
Minimum Vertical Clearance: 6.63m (21.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 37 0311,  Location: 04-SCL-087-6.27-SJS (Lat: 37.339119,  Lng: -121.898422),  Route carried "under" structure: City street ,  Year Built: 1988,  Structure Length: 39.62m (129.99ft),  Average Daily Traffic: 1,150 (year 2000),  Truck Traffic: 2%,  Features Intersected: UP RR, AMTRAK, STREETS,  Facility Carried by Structure: STATE ROUTE 87
Minimum Vertical Clearance: 7.72m (25.33ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 37 0311,  Location: 04-SCL-087-6.27-SJS (Lat: 37.339119,  Lng: -121.898422),  Route carried "under" structure: City street ,  Year Built: 1988,  Structure Length: 39.62m (129.99ft),  Average Daily Traffic: 1,000 (year 1998),  Truck Traffic: 5%,  Features Intersected: UP RR, AMTRAK, STREETS,  Facility Carried by Structure: STATE ROUTE 87
Minimum Vertical Clearance: 9.02m (29.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 37 0312,  Location: 04-SCL-087-5.99-SJS (Lat: 37.335025,  Lng: -121.897078),  Route carried "under" structure: City street ,  Year Built: 1988,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 1,670 (year 2000),  Truck Traffic: 3%,  Features Intersected: N ALMADEN BOULEVARD,  Facility Carried by Structure: STATE ROUTE 87
Minimum Vertical Clearance: 0.52m (1.71ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 37 0312G,  Location: 04-SCL-087-6-SJS (Lat: 37.335028,  Lng: -121.896844),  Route carried "under" structure: City street ,  Year Built: 1988,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 1,670 (year 2000),  Truck Traffic: 3%,  Features Intersected: N ALMADEN BOULEVARD,  Facility Carried by Structure: OFF-RAMP/I280-N87
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 37 0315,  Location: 04-SCL-087-4.86-SJS (Lat: 37.319889,  Lng: -121.890000),  Route carried "under" structure: State highway 87,  Year Built: 1972,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 130,000 (year 2009),  Truck Traffic: 3%,  Features Intersected: STATE ROUTE 87,  Facility Carried by Structure: VIRGINIA STREET
Minimum Vertical Clearance: 4.64m (15.22ft),  Kilometerpoint: 0.486,  Lanes on structure: 2,  Lanes under structure: 11,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 37 0319,  Location: 04-SCL-087-6.1-SJS (Lat: 37.336783,  Lng: -121.897289),  Route carried "under" structure: Business City street ,  Year Built: 1988,  Structure Length: 6.74m (22.11ft),  Average Daily Traffic: 22,500 (year 1998),  Truck Traffic: 3%,  Features Intersected: JULIAN STREET,  Facility Carried by Structure: STATE ROUTE 87
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 37 0322,  Location: 04-SCL-280-R4.24-SJS (Lat: 37.316667,  Lng: -121.918333),  Route carried "under" structure: Interstate 280,  Year Built: 1972,  Structure Length: 16.64m (54.59ft),  Average Daily Traffic: 196,000 (year 2009),  Truck Traffic: 1%,  Features Intersected: COLLEGE DRIVE POC
Minimum Vertical Clearance: 9.02m (29.59ft),  Kilometerpoint: 0.424,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 69.8m (229.0ft)

Find on map >>   Show street view

Structure Number: 37 0322,  Location: 04-SCL-280-R4.24-SJS (Lat: 37.316667,  Lng: -121.918333),  Route carried "under" structure: City street ,  Year Built: 1972,  Structure Length: 16.64m (54.59ft),  Average Daily Traffic: 5,500 (year 1997),  Truck Traffic: 4%,  Features Intersected: COLLEGE DRIVE POC,  Facility Carried by Structure: INTERSTATE 280
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.000,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 69.8m (229.0ft)

Find on map >>   Show street view

Structure Number: 37 034,  Location: 04-SCL-680-M5.83-SJS (Lat: 37.410000,  Lng: -121.878333),  Route carried "under" structure: Interstate 680,  Year Built: 1974,  Structure Length: 20.57m (67.49ft),  Average Daily Traffic: 175,000 (year 2009),  Truck Traffic: 5%,  Features Intersected: INTERSTATE 680,  Facility Carried by Structure: TRIMBLE ROAD POC
Minimum Vertical Clearance: 0.62m (2.03ft),  Kilometerpoint: 0.583,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.5m (113.2ft)

Find on map >>   Show street view

Structure Number: 37 0344L,  Location: 04-SCL-101-R21.25-SJS (Lat: 37.190500,  Lng: -121.693050),  Route carried "under" structure: City street C133,  Year Built: 1980,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 400 (year 1998),  Truck Traffic: 5%,  Features Intersected: COYOTE CREEK ROAD,  Facility Carried by Structure: SB US HIGHWAY 101
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.7m (84.3ft)

Find on map >>   Show street view

Structure Number: 37 0344R,  Location: 04-SCL-101-R21.25-SJS (Lat: 37.190550,  Lng: -121.692883),  Route carried "under" structure: City street C133,  Year Built: 1980,  Structure Length: 6.04m (19.82ft),  Average Daily Traffic: 400 (year 1998),  Truck Traffic: 5%,  Features Intersected: COYOTE CREEK ROAD,  Facility Carried by Structure: NB US HIGHWAY 101
Minimum Vertical Clearance: 7.06m (23.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 37 0345,  Location: 04-SCL-082-R.35-SJS (Lat: 37.255583,  Lng: -121.801917),  Route carried "under" structure: State highway 82,  Year Built: 1974,  Structure Length: 10.75m (35.27ft),  Average Daily Traffic: 56,000 (year 2009),  Truck Traffic: 3%,  Features Intersected: ROUTE 82 (MONTEREY HWY),  Facility Carried by Structure: BLOSSOM HILL ROAD
Minimum Vertical Clearance: 7.46m (24.48ft),  Kilometerpoint: 0.035,  Lanes on structure: 7,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.2m (148.3ft)

Find on map >>   Show street view

Structure Number: 37 0345,  Location: 04-SCL-082-R.35-SJS (Lat: 37.255583,  Lng: -121.801917),  Route carried "under" structure: Ramp City street ,  Year Built: 1974,  Structure Length: 10.75m (35.27ft),  Average Daily Traffic: 22,029 (year 1999),  Truck Traffic: 3%,  Features Intersected: ROUTE 82 (MONTEREY HWY),  Facility Carried by Structure: BLOSSOM HILL ROAD
Minimum Vertical Clearance: 0.67m (2.20ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.2m (148.3ft)


Parts: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12

Jump to a detailed profile or search site with Google Custom Search
Business Search - 14 Million verified businesses
Search for: near: 

Discuss this city on our hugely popular California forum

Back to: San Jose, CA, California, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2014 Advameg, Inc.