![]() |
Bridge Statistics for Santa Rosa, New Mexico (NM) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Santa Rosa, NM, New Mexico, New Mexico forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 18 Total length: 102 meters (335ft) Total costs: $2,411,000 Total average daily traffic: 125,145 Total average daily truck traffic: 43,008 National Bridge Inventory (NBI) Registered Bridges for Santa Rosa
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 6115, Location: 0.2 MI E OF JCT US-54 (Lat: 34.940000, Lng: -104.690000), Route carried "on" structure: State highway L0035, Year Built: 1959, Status: Open, Structure Length: 6.98m (22.90ft), Average Daily Traffic: 8,424 (year 2007), Truck Traffic: 18%, Average Future Daily Traffic: 11,135 (year 2027), Design Load: HS 20, Features Intersected: PECOS RIVER, Facility Carried by Structure: LOOP-35/SANTA ROSA Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.173, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 26.8m (87.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 26.2m (86.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 16.5m (54.1ft), Out-to-Out Width: 23.8m (78.1ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Channel: Good, Operating Rating: 45.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 30.8 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.98m (22.90ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2008, Bridge Improvement Cost: $1,607,000, Roadway Improvement Cost: $160,000, Total Project Cost: $2,411,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 6116, Location: 1.1 MI E OF JCT US-54 (Lat: 34.943333, Lng: -104.676667), Route carried "on" structure: State highway L0035, Year Built: 1959, Status: Open, Structure Length: 3.11m (10.20ft), Average Daily Traffic: 8,578 (year 2007), Truck Traffic: 25%, Average Future Daily Traffic: 11,338 (year 2027), Design Load: HS 20, Features Intersected: EL RITO CREEK, Facility Carried by Structure: LOOP-35/SANTA ROSA Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.782, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 20.7m (67.9ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 10.1m (33.1ft), Curb-To-Curb Width: 20.7m (67.9ft), Out-to-Out Width: 21.5m (70.5ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Good, Operating Rating: 40.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 6167, Location: 0.8 MI E/W SANTA ROSA INT (Lat: 34.943333, Lng: -104.705000), Route carried "on" structure: State highway L0035, Year Built: 1959, Status: Open, Structure Length: 1.01m (3.31ft), Average Daily Traffic: 2,184 (year 2007), Truck Traffic: 12%, Average Future Daily Traffic: 2,886 (year 2027), Design Load: HS 20, Features Intersected: UNNAMED WATERWAY, Facility Carried by Structure: LOOP-35/SANTA ROSA Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.690, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 21 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 51.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 48 months, Inspection Date: January 2008 Find on map >>
Structure Number: 7189, Location: 1.1 MI E OF JCT LOOP-35 (Lat: 34.921667, Lng: -104.691667), Route carried "on" structure: Interstate 40, Year Built: 1971, Status: Open, Structure Length: 3.81m (12.50ft), Average Daily Traffic: 8,353 (year 2007), Truck Traffic: 40%, Average Future Daily Traffic: 12,574 (year 2027), Design Load: HS 20+Mod, Features Intersected: 8TH STREET IN SANTA ROSA Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 442.319, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 10 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 16.5m (54.1ft), Curb-To-Curb Width: 12.7m (41.7ft), Out-to-Out Width: 13.7m (44.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 72.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 719, Location: 1.1 MI E OF JCT LOOP-35 (Lat: 34.930000, Lng: -104.686667), Route carried "on" structure: Interstate 40, Year Built: 1971, Status: Open, Structure Length: 3.81m (12.50ft), Average Daily Traffic: 8,840 (year 2007), Truck Traffic: 40%, Average Future Daily Traffic: 13,306 (year 2027), Design Load: HS 20+Mod, Features Intersected: 8TH STREET IN SANTA ROSA Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 442.211, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 10 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 16.5m (54.1ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.7m (44.9ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 72.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 7191, Location: 19.5 MI E JCT I40 & US84 (Lat: 34.947167, Lng: -104.678500), Route carried "on" structure: Interstate 40, Year Built: 1972, Year Reconstructed: 2005, Status: Open, Structure Length: 6.86m (22.51ft), Average Daily Traffic: 8,353 (year 2007), Truck Traffic: 40%, Average Future Daily Traffic: 12,574 (year 2027), Design Load: HS 20+Mod, Features Intersected: C R I & P RAILROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 442.285, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 14 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 26.8m (87.9ft), Curb-To-Curb Width: 13.0m (42.7ft), Out-to-Out Width: 13.7m (44.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 56.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 25.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 7192, Location: 19.5 MI E JCT I-40 & US84 (Lat: 34.947333, Lng: -104.678167), Route carried "on" structure: Interstate 40, Year Built: 1972, Year Reconstructed: 2005, Status: Open, Structure Length: 6.83m (22.41ft), Average Daily Traffic: 8,840 (year 2007), Truck Traffic: 40%, Average Future Daily Traffic: 13,306 (year 2027), Design Load: HS 20+Mod, Features Intersected: C R I & P RAILROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 442.177, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.1m (43.0ft), Skew: 14 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 26.8m (87.9ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.7m (44.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 56.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 25.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 7193, Location: MIDDLE INTRCHG/SANTA ROSA (Lat: 34.945000, Lng: -104.671667), Route carried "on" structure: Interstate 40, Year Built: 1972, Status: Open, Structure Length: 9.08m (29.79ft), Average Daily Traffic: 10,264 (year 2007), Truck Traffic: 40%, Average Future Daily Traffic: 15,450 (year 2027), Design Load: HS 20+Mod, Features Intersected: US-54/LOOP-35 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 442.777, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.5m (41.0ft), Skew: 15 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 42.7m (140.1ft), Curb-To-Curb Width: 13.3m (43.6ft), Out-to-Out Width: 14.2m (46.6ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 59.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Other Special Inspection Frequency: Every 24 months, Inspection Date: Febuary 2006, Other Special Inspection Date: July 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 7194, Location: MIDDLE INTRCHG/SANTA ROSA (Lat: 34.945000, Lng: -104.671667), Route carried "on" structure: Interstate 40, Year Built: 1972, Status: Open, Structure Length: 8.44m (27.69ft), Average Daily Traffic: 10,457 (year 2007), Truck Traffic: 40%, Average Future Daily Traffic: 15,741 (year 2027), Design Load: HS 20+Mod, Features Intersected: US-54/LOOP-35 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 442.777, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.5m (41.0ft), Skew: 15 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 42.7m (140.1ft), Curb-To-Curb Width: 13.3m (43.6ft), Out-to-Out Width: 14.2m (46.6ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 64.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 24 months, Other Special Inspection Frequency: Every 24 months, Inspection Date: Febuary 2006, Other Special Inspection Date: July 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 7195, Location: JCT I-40/US-84/SANTA ROSA (Lat: 34.943333, Lng: -104.640000), Route carried "on" structure: Interstate 40, Year Built: 1972, Status: Open, Structure Length: 6.16m (20.21ft), Average Daily Traffic: 8,883 (year 2007), Truck Traffic: 40%, Average Future Daily Traffic: 13,371 (year 2027), Design Load: HS 20+Mod, Features Intersected: LOOP-35/EAST END Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 445.507, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 12 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 32.6m (107.0ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.7m (44.9ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 71.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 7196, Location: JCT I-40/US-84/SANTA ROSA (Lat: 34.945000, Lng: -104.640000), Route carried "on" structure: Interstate 40, Year Built: 1972, Status: Open, Structure Length: 6.34m (20.80ft), Average Daily Traffic: 9,115 (year 2007), Truck Traffic: 40%, Average Future Daily Traffic: 13,721 (year 2027), Design Load: HS 20+Mod, Features Intersected: LOOP-35/EAST END Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 445.619, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 12 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 33.8m (110.9ft), Curb-To-Curb Width: 12.9m (42.3ft), Out-to-Out Width: 13.7m (44.9ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 82.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 9323, Location: 1.0 M E JCT US54/66 L35 (Lat: 34.936667, Lng: -104.673000), Route carried "on" structure: City street , Year Built: 2003, Status: Open, Structure Length: 2.19m (7.19ft), Average Daily Traffic: 264 (year 2007), Truck Traffic: 1%, Average Future Daily Traffic: 265 (year 2027), Design Load: HS 20, Features Intersected: EL RITO CREEK, Facility Carried by Structure: LA PRADIRA AVE. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.483, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 21.0m (68.9ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 13.0m (42.7ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 58.3 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 7189, Location: 1.1 MI E OF JCT LOOP-35 (Lat: 34.921667, Lng: -104.691667), Route carried "under" structure: City street , Year Built: 1971, Structure Length: 3.81m (12.50ft), Average Daily Traffic: 500 (year 2007), Features Intersected: I-40 EBL, Facility Carried by Structure: I-40 EBL Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.029, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.5m (54.1ft) Find on map >>
Structure Number: 719, Location: 1.1 MI E OF JCT LOOP-35 (Lat: 34.930000, Lng: -104.686667), Route carried "under" structure: City street , Year Built: 1971, Structure Length: 3.81m (12.50ft), Average Daily Traffic: 500 (year 2007), Features Intersected: I-40 WBL, Facility Carried by Structure: I-40 WBL Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 0.029, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.5m (54.1ft) Find on map >>
Structure Number: 7193, Location: MIDDLE INTRCHG/SANTA ROSA (Lat: 34.945000, Lng: -104.671667), Route carried "under" structure: State highway L0035, Year Built: 1972, Structure Length: 9.08m (29.79ft), Average Daily Traffic: 7,472 (year 2007), Truck Traffic: 18%, Features Intersected: I-40 EBL, Facility Carried by Structure: I-40 EBL Minimum Vertical Clearance: 6.22m (20.41ft), Kilometerpoint: 4.056, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.7m (140.1ft) Find on map >>
Structure Number: 7194, Location: MIDDLE INTRCHG/SANTA ROSA (Lat: 34.945000, Lng: -104.671667), Route carried "under" structure: State highway L0035, Year Built: 1972, Structure Length: 8.44m (27.69ft), Average Daily Traffic: 7,472 (year 2007), Truck Traffic: 18%, Features Intersected: I-40 WBL, Facility Carried by Structure: I-40 WBL Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 4.056, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.7m (140.1ft) Find on map >>
Structure Number: 7195, Location: JCT I-40/US-84/SANTA ROSA (Lat: 34.943333, Lng: -104.640000), Route carried "under" structure: US 84, Year Built: 1972, Structure Length: 6.16m (20.21ft), Average Daily Traffic: 8,323 (year 2007), Truck Traffic: 43%, Features Intersected: I-40 EBL, Facility Carried by Structure: I-40 EBL Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 67.127, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.6m (107.0ft) Find on map >>
Structure Number: 7196, Location: JCT I-40/US-84/SANTA ROSA (Lat: 34.945000, Lng: -104.640000), Route carried "under" structure: US 84, Year Built: 1972, Structure Length: 6.34m (20.80ft), Average Daily Traffic: 8,323 (year 2007), Truck Traffic: 43%, Features Intersected: I-40 WBL, Facility Carried by Structure: I-40 WBL Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 67.131, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 33.8m (110.9ft) Discuss this city on our hugely popular New Mexico forum Back to: Santa Rosa, NM, New Mexico, All US cities.
|
![]() |