U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Saraland, Alabama (AL) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Saraland, AL, Alabama, Alabama forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 23
Total length: 130 meters (427ft)
Total costs: $20,410,000
Total average daily traffic: 342,263
Total average daily truck traffic: 36,920
National Bridge Inventory (NBI) Registered Bridges for Saraland

New bridges - Historical Statistics

  • 1940-1949: 1
  • 1950-1959: 5
  • 1960-1969: 13
  • 1970-1979: 2
  • 1980-1989: 0
  • 1990-1999: 0
  • 2000-2009: 2

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 3776,  Location: 0.6 MI N CELESTE ROAD (Lat: 30.833333,  Lng: -88.100000),  Route carried "on" structure: City street ,  Year Built: 1950,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 1,500 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,000 (year 2023),  Design Load: H 15,  Features Intersected: BAYOU SARA,  Facility Carried by Structure: FORREST AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.698,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 22.7 metric tons,  Inventory Rating: 17.1 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 5.11m (16.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $514,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $771,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 4168,  Location: 1.0 MI W JCT US 43 (Lat: 30.821944,  Lng: -88.087222),  Route carried "on" structure: State highway 213,  Year Built: 1951,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 12,500 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 12,562 (year 2027),  Design Load: H 20,  Features Intersected: NORTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.416,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 30.8 metric tons,  Inventory Rating: 22.7 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $265,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $398,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 585,  Location: 0.6 MI S JCT SR 213 (Lat: 30.808611,  Lng: -88.075000),  Route carried "on" structure: US 43,  Year Built: 1957,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 18,000 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 17,820 (year 2027),  Design Load: HS 20,  Features Intersected: NORTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.658,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 26.2m (86.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $769,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $1,154,000 ( Estimate for 2008)
Find on map >>

Structure Number: 5851,  Location: JCT SR 213 (Lat: 30.827500,  Lng: -88.090278),  Route carried "on" structure: US 43,  Year Built: 1957,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 11,510 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,475 (year 2027),  Design Load: H 20,  Features Intersected: BAYOU SARA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.626,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.51m (21.36ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Underwater Inspection Date: January 2007,  Bridge Improvement Cost: $866,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $1,299,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 5852,  Location: JCT SR 213 (Lat: 30.837500,  Lng: -88.075000),  Route carried "on" structure: US 43,  Year Built: 1957,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 11,510 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,475 (year 2027),  Design Load: H 20,  Features Intersected: BAYOU SARA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.626,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.51m (21.36ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Underwater Inspection Date: January 2007,  Bridge Improvement Cost: $866,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $1,299,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 7158,  Location: 1.3 MI. W. CO. 55 (Lat: 30.750000,  Lng: -88.083333),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 925 (year 2003),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,550 (year 2023),  Design Load: H 10,  Features Intersected: BAYOU SARA,  Facility Carried by Structure: LAFITTE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.310,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 14.5 metric tons,  Inventory Rating: 10.9 metric tons,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 3.95m (12.96ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: January 2008,  Underwater Inspection Date: October 2001,  Bridge Improvement Cost: $433,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $649,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 9267,  Location: I-65 @ SR 158 & SR 213 (Lat: 30.809444,  Lng: -88.116667),  Route carried "on" structure: Interstate 65,  Year Built: 1967,  Status: Open,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 30,965 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 32,141 (year 2027),  Design Load: HS 20,  Features Intersected: SR 158 & SR 213
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.991,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 37.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.54m (28.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $1,136,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $1,704,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 9268,  Location: I-65 @ SR 158 & SR 213 (Lat: 30.804722,  Lng: -88.113889),  Route carried "on" structure: Interstate 65,  Year Built: 1967,  Status: Open,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 30,965 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 32,141 (year 2027),  Design Load: HS 20,  Features Intersected: SR 158 & SR 213
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.991,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 37.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.54m (28.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $1,136,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $1,704,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 9269,  Location: 1.4 MI N SR 158 (Lat: 30.821389,  Lng: -88.120833),  Route carried "on" structure: Interstate 65,  Year Built: 1967,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 44,290 (year 2007),  Truck Traffic: 14%,  Average Future Daily Traffic: 46,150 (year 2027),  Design Load: HS 20,  Features Intersected: NORTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.437,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.0m (118.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $1,056,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,584,000 ( Estimate for 2008)
Find on map >>

Structure Number: 927,  Location: 2.2 MI N SR 158 (Lat: 30.837222,  Lng: -88.100278),  Route carried "on" structure: County highway 41,  Year Built: 1967,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 16,580 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 24,187 (year 2026),  Design Load: H 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 60.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.39m (34.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,217,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,826,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 9271,  Location: 0.3 MI N CELESTE ROAD (Lat: 30.821944,  Lng: -88.108333),  Route carried "on" structure: Interstate 65,  Year Built: 1967,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 34,410 (year 2007),  Truck Traffic: 16%,  Average Future Daily Traffic: 35,717 (year 2027),  Design Load: HS 20,  Features Intersected: BAYOU SARA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.900,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.0m (118.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,626,000,  Roadway Improvement Cost: $163,000,  Total Project Cost: $2,439,000 ( Estimate for 2008)
Find on map >>

Structure Number: 9273,  Location: 3.61 MI N SR 158 (Lat: 30.848333,  Lng: -88.077500),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Open,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 1,460 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,225 (year 2021),  Design Load: H 20,  Features Intersected: I-65,  Facility Carried by Structure: BAKER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.60m (31.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,113,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,669,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 11679,  Location: SHELTON BEACH ESTATES (Lat: 30.800000,  Lng: -88.116667),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 525 (year 2004),  Truck Traffic: 1%,  Average Future Daily Traffic: 765 (year 2024),  Design Load: H 15,  Features Intersected: NORTON CREEK,  Facility Carried by Structure: SCOTT DRIVE WEST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.050,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 22.7 metric tons,  Inventory Rating: 17.1 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $221,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $331,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 11682,  Location: SHELTON BEACH ESTATES (Lat: 30.816667,  Lng: -88.116667),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 400 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 600 (year 2023),  Design Load: H 15,  Features Intersected: NORTON CREEK,  Facility Carried by Structure: SCOTT DRIVE EAST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.060,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 22.7 metric tons,  Inventory Rating: 17.1 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.12m (6.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $213,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $319,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 14337,  Location: 1.1 MI N W I65 (Lat: 30.816667,  Lng: -88.100000),  Route carried "on" structure: City street ,  Year Built: 1943,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 7,750 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,750 (year 2023),  Design Load: HS 20,  Features Intersected: BAYOU SARA CREEK,  Facility Carried by Structure: CELESTE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.300,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.25m (20.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $1,075,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $1,613,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1752,  Location: I-65 @ SR 158/213 (Lat: 30.801111,  Lng: -88.118889),  Route carried "on" structure: Ramp Interstate 65,  Year Built: 2001,  Status: Open,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 6,193 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 6,428 (year 2027),  Design Load: HS 20,  Features Intersected: SR 158/213
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.991,  Lanes on structure: 1,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 8.9m (29.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.0m (128.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 79.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.80m (28.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,101,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $1,651,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 9267,  Location: I-65 SB @ SR 158 & 213 (Lat: 30.809444,  Lng: -88.116667),  Route carried "under" structure: State highway 158,  Year Built: 1967,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 7,120 (year 2007),  Truck Traffic: 12%,  Features Intersected: I-65 SB,  Facility Carried by Structure: I-65 SB
Minimum Vertical Clearance: 0.51m (1.67ft),  Kilometerpoint: 3.499,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>

Structure Number: 9267,  Location: I-65 @ SR 158 & SR 213 (Lat: 30.809444,  Lng: -88.116667),  Route carried "under" structure: State highway 213,  Year Built: 1967,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 6,360 (year 2007),  Truck Traffic: 3%,  Features Intersected: I-65 @ SR 158 & SR 213,  Facility Carried by Structure: I-65 SB
Minimum Vertical Clearance: 0.51m (1.67ft),  Kilometerpoint: 4.141,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>

Structure Number: 9268,  Location: I-65 @ SR 158 & SR 213 (Lat: 30.804722,  Lng: -88.113889),  Route carried "under" structure: State highway 158,  Year Built: 1967,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 7,120 (year 2007),  Truck Traffic: 12%,  Features Intersected: I-65 NB,  Facility Carried by Structure: I-65 NB
Minimum Vertical Clearance: 0.49m (1.61ft),  Kilometerpoint: 3.499,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>

Structure Number: 9268,  Location: I-65 @ SR 158 & SR 213 (Lat: 30.804722,  Lng: -88.113889),  Route carried "under" structure: State highway 213,  Year Built: 1967,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 6,360 (year 2007),  Truck Traffic: 3%,  Features Intersected: I-65 NB,  Facility Carried by Structure: I-65 NB
Minimum Vertical Clearance: 0.49m (1.61ft),  Kilometerpoint: 4.141,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>

Structure Number: 927,  Location: 2.2 MI N SR 158 (Lat: 30.837222,  Lng: -88.100278),  Route carried "under" structure: Interstate 65,  Year Built: 1967,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 44,290 (year 2007),  Truck Traffic: 14%,  Features Intersected: I-65,  Facility Carried by Structure: CELESTE RD (CR41)
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 24.433,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>

Structure Number: 9273,  Location: 3.61 MI N SR 158 (Lat: 30.848333,  Lng: -88.077500),  Route carried "under" structure: Interstate 65,  Year Built: 1967,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 34,410 (year 2007),  Truck Traffic: 16%,  Features Intersected: I-65,  Facility Carried by Structure: BAKER RD
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 26.828,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>

Structure Number: 1752,  Location: I-65 @ AL 158/213 (Lat: 30.801111,  Lng: -88.118889),  Route carried "under" structure: State highway 158,  Year Built: 2001,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 7,120 (year 2007),  Truck Traffic: 12%,  Features Intersected: AL 158/213,  Facility Carried by Structure: I-65 ON RAMP
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 3.499,  Lanes on structure: 1,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Discuss this city on our hugely popular Alabama forum

Back to: Saraland, AL, Alabama, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.