![]() |
Bridge Statistics for Sequim, Washington (WA) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Sequim, WA, Washington, Washington forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 10 Total length: 33 meters (108ft) Total costs: $397,000 Total average daily traffic: 107,579 Total average daily truck traffic: 10,999 National Bridge Inventory (NBI) Registered Bridges for Sequim
Bridge Condition - Deck Bridge Condition - Superstructure Find on map >>
Structure Number: 15345A, Location: 16.7 S JCT SR 117 (Lat: 48.074194, Lng: -123.135083), Route carried "on" structure: City street 101, Year Built: 1999, Status: Open, Structure Length: 3.26m (10.70ft), Average Daily Traffic: 2,700 (year 2002), Truck Traffic: 10%, Average Future Daily Traffic: 2,754 , Design Load: HS 25, Features Intersected: US 101, Facility Carried by Structure: RIVER RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 423.250, Lanes on structure: 4, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 23.5m (77.1ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.1m (102.0ft), Curb or Sidewalk Widths: Left: 2.0m (6.6ft), Right: 2.0m (6.6ft), Curb-To-Curb Width: 19.5m (64.0ft), Out-to-Out Width: 24.0m (78.7ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 56.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Better than present minimum criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $62,000, Roadway Improvement Cost: $6,000, Total Project Cost: $93,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 15345B, Location: 17.5 S JCT SR 117 (Lat: 48.073194, Lng: -123.118889), Route carried "on" structure: City street 101, Year Built: 1999, Status: Open, Structure Length: 3.26m (10.70ft), Average Daily Traffic: 29 (year 2002), Truck Traffic: 10%, Average Future Daily Traffic: 29 , Design Load: HS 25, Features Intersected: US 101, Facility Carried by Structure: 7TH AVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 424.470, Lanes on structure: 2, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.1m (102.0ft), Curb or Sidewalk Widths: Left: 2.0m (6.6ft), Right: 2.0m (6.6ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 14.6m (47.9ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Operating Rating: 56.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $30,000, Roadway Improvement Cost: $3,000, Total Project Cost: $45,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 15345C, Location: 18.0 S JCT SR 117 (Lat: 48.073306, Lng: -123.107833), Route carried "on" structure: City street 101, Year Built: 1999, Status: Open, Structure Length: 3.26m (10.70ft), Average Daily Traffic: 3,030 (year 2002), Truck Traffic: 10%, Average Future Daily Traffic: 3,090 , Design Load: HS 25, Features Intersected: US 101, Facility Carried by Structure: 3RD AVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 425.270, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.1m (102.0ft), Curb or Sidewalk Widths: Left: 2.0m (6.6ft), Right: 2.0m (6.6ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 10.6m (34.8ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 76.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $37,000, Roadway Improvement Cost: $4,000, Total Project Cost: $56,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 15345D, Location: 18.2 S JCT SR 117 (Lat: 48.073250, Lng: -123.102583), Route carried "on" structure: City street 101, Year Built: 1999, Status: Open, Structure Length: 3.26m (10.70ft), Average Daily Traffic: 3,030 (year 2002), Truck Traffic: 10%, Average Future Daily Traffic: 3,090 , Design Load: HS 25, Features Intersected: US 101, Facility Carried by Structure: SEQUIM AVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 425.660, Lanes on structure: 4, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.1m (102.0ft), Curb or Sidewalk Widths: Left: 2.0m (6.6ft), Right: 2.0m (6.6ft), Curb-To-Curb Width: 19.5m (64.0ft), Out-to-Out Width: 24.0m (78.7ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Operating Rating: 76.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Better than present minimum criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $62,000, Roadway Improvement Cost: $6,000, Total Project Cost: $93,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 15345E, Location: 19.8 S JCT SR 117 (Lat: 48.068278, Lng: -123.069583), Route carried "on" structure: US 101, Year Built: 1999, Status: Open, Structure Length: 4.27m (14.01ft), Average Daily Traffic: 12,050 (year 2006), Truck Traffic: 14%, Average Future Daily Traffic: 21,500 (year 2026), Design Load: HS 25, Features Intersected: SIMDARS RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 428.170, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 40.8m (133.9ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 12.3m (40.4ft) Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 58.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $73,000, Roadway Improvement Cost: $7,000, Total Project Cost: $110,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 200379, Location: 24.57 S JCT SR 117 (Lat: 48.020833, Lng: -123.006750), Route carried "on" structure: US 101, Year Built: 2004, Status: Open, Structure Length: 3.63m (11.91ft), Average Daily Traffic: 12,000 (year 2004), Truck Traffic: 8%, Average Future Daily Traffic: 12,240 (year 2024), Features Intersected: JIMMYCOMELATELY CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 435.830, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 11.9m (39.0ft), Curb-To-Curb Width: 14.9m (48.9ft), Out-to-Out Width: 15.8m (51.8ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 81.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 48 months, Inspection Date: August 2006, Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 15345A, Location: 16.7 S JCT SR 117 (Lat: 48.074194, Lng: -123.135083), Route carried "under" structure: US 101, Year Built: 1999, Structure Length: 3.26m (10.70ft), Average Daily Traffic: 22,220 (year 2002), Truck Traffic: 10%, Features Intersected: US 101, Facility Carried by Structure: RIVER RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 42.325, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.1m (102.0ft) Find on map >>
Structure Number: 15345B, Location: 17.5 S JCT SR 117 (Lat: 48.073194, Lng: -123.118889), Route carried "under" structure: US 101, Year Built: 1999, Structure Length: 3.26m (10.70ft), Average Daily Traffic: 12,120 (year 2002), Truck Traffic: 10%, Features Intersected: US 101, Facility Carried by Structure: 7TH AVE Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 42.447, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.1m (102.0ft) Find on map >>
Structure Number: 15345C, Location: 18.0 S JCT SR 117 (Lat: 48.073306, Lng: -123.107833), Route carried "under" structure: US 101, Year Built: 1999, Structure Length: 3.26m (10.70ft), Average Daily Traffic: 20,200 (year 2002), Truck Traffic: 10%, Features Intersected: US 101, Facility Carried by Structure: 3RD AVE Minimum Vertical Clearance: 5.31m (17.42ft), Kilometerpoint: 42.527, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.1m (102.0ft) Find on map >>
Structure Number: 15345D, Location: 18.2 S JCT SR 117 (Lat: 48.073250, Lng: -123.102583), Route carried "under" structure: US 101, Year Built: 1999, Structure Length: 3.26m (10.70ft), Average Daily Traffic: 20,200 (year 2002), Truck Traffic: 10%, Features Intersected: US 101, Facility Carried by Structure: SEQUIM AVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 42.566, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.1m (102.0ft) Discuss this city on our hugely popular Washington forum Back to: Sequim, WA, Washington, All US cities.
|
![]() |