Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Sheffield, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 177ft / 54.4mTotal length
  • $37,662,000Total costs
  • 46,444Total average daily traffic
  • 2,561Total average daily truck traffic
  • 46,495Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sheffield
  • No street view available for this location

New bridges in Sheffield, MA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 21930-1939
  • 21940-1949
  • 71950-1959
  • 11960-1969
  • 11970-1979
  • 11990-1999
  • 12000-2009
  • 12010-2019
  • 22020-2022
Average Bridge Daily Traffic in Sheffield, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Excellent
  • 5.0%Very good
  • 45.0%Good
  • 25.0%Satisfactory
  • 15.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Excellent
  • 15.0%Very good
  • 30.0%Good
  • 20.0%Satisfactory
  • 15.0%Fair
  • 10.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Excellent
  • 40.0%Good
  • 40.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.3%Very good
  • 42.1%Good
  • 42.1%Satisfactory
  • 10.5%Fair
Find on map >>   Show street view

Structure Number: S10001085MUNNBI,  Location: 0.8 MI W. OF ASHLEY FALLS (Lat: 42.058611,  Lng: -73.348722),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 259 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 711 (year 2031),  Design Load: H 20,  Features Intersected: WATER HOUSATONIC RIVER,  Facility Carried by Structure: HWY RANNAPO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.0m (75.5ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.70m (15.42ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: Febuary 2022,  Underwater Inspection Date: November 2021,  Bridge Improvement Cost: $2,124,000,  Roadway Improvement Cost: $213,000,  Total Project Cost: $3,187,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S10002BWTDOTNBI,  Location: @ W. STAHL RD INTER. (Lat: 42.069594,  Lng: -73.340158),  Route carried "on" structure: Alternate State highway 7A,  Year Built: 2020,  Status: Open,  Structure Length: 3.94m (12.93ft),  Average Daily Traffic: 423 (year 2017),  Truck Traffic: 1%,  Design Load: HL 93,  Features Intersected: WATER HOUSATONIC RIVER,  Facility Carried by Structure: ST 7 A/ASHLEY FLS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.762,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.1m (26.6ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 55.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S1000509RDOTNBI,  Location: .1 MI NORTH OF MAPLE AVE (Lat: 42.114119,  Lng: -73.351072),  Route carried "on" structure: US 7,  Year Built: 1924,  Status: Open,  Structure Length: 1.53m (5.02ft),  Average Daily Traffic: 8,221 (year 2009),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,266 (year 2033),  Features Intersected: WATER HUBBARD BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.3m (30.5ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.3m (43.6ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $667,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $1,001,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: S10006086MUNNBI,  Location: 300' WEST OF ROUTE 7 (Lat: 42.113014,  Lng: -73.352231),  Route carried "on" structure: City street ,  Year Built: 1996,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 1,080 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 648 (year 2033),  Design Load: HS 20,  Features Intersected: WATER SCHENOB BROOK,  Facility Carried by Structure: HWY MILLER AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,643,000,  Roadway Improvement Cost: $165,000,  Total Project Cost: $2,465,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S1000702KMUNNBI,  Location: .65 MI E OF RTE 7 (Lat: 42.109042,  Lng: -73.340194),  Route carried "on" structure: City street ,  Year Built: 1952,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 8.00m (26.25ft),  Average Daily Traffic: 2,429 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,421 (year 2031),  Design Load: HS 20,  Features Intersected: WATER HOUSATONIC RIVER,  Facility Carried by Structure: HWY MAPLE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.10m (26.57ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: Febuary 2022,  Underwater Inspection Date: October 2020,  Bridge Improvement Cost: $4,659,000,  Roadway Improvement Cost: $466,000,  Total Project Cost: $6,989,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S1000802JMUNNBI,  Location: BEWTN BOARDMAN ST/ EAST R (Lat: 42.108011,  Lng: -73.335756),  Route carried "on" structure: City street ,  Year Built: 1949,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 3,103 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,421 (year 2032),  Design Load: H 15,  Features Intersected: WATER IRONWORK BROOK,  Facility Carried by Structure: HWY COUNTY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 31.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $429,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $644,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: S10013087MUNNBI,  Location: E OF RT7 1M S OF GT BRGTN (Lat: 42.144000,  Lng: -73.359767),  Route carried "on" structure: City street ,  Year Built: 1963,  Status: Open,  Structure Length: 3.27m (10.73ft),  Average Daily Traffic: 750 (year 2012),  Truck Traffic: 6%,  Average Future Daily Traffic: 316 (year 2031),  Design Load: H 20,  Features Intersected: WATER HOUSATONIC RIVER,  Facility Carried by Structure: HWY KELLOGG RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.2m (102.4ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2020,  Underwater Inspection Date: January 2019,  Bridge Improvement Cost: $1,310,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,966,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: S10015088MUNNBI,  Location: 1.1 MI E OF RTE 41 (Lat: 42.065547,  Lng: -73.397658),  Route carried "on" structure: City street ,  Year Built: 1915,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 120 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 158 (year 2032),  Features Intersected: WATER SCHENOB BROOK,  Facility Carried by Structure: HWY KELSEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.5m (14.8ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 42.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $904,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,357,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: S10017089MUNNBI,  Location: W OF RT7&S OF MILL POND (Lat: 42.120567,  Lng: -73.362094),  Route carried "on" structure: City street ,  Year Built: 1935,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 480 (year 2001),  Truck Traffic: 6%,  Average Future Daily Traffic: 758 (year 2031),  Design Load: HS 20,  Features Intersected: WATER HUBBARD BROOK,  Facility Carried by Structure: HWY COOK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $826,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $1,240,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S1001802GMUNNBI,  Location: .25 MI SE OF EGREMONT LN (Lat: 42.149667,  Lng: -73.391069),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Posted for load,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 1,200 (year 2012),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,895 (year 2031),  Design Load: H 20,  Features Intersected: WATER HUBBARD BROOK,  Facility Carried by Structure: HWY S EGRMNT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: December 2020,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $687,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $1,031,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S10019BXNMUNNBI,  Location: .5 MI W. OF SALISBURY RD (Lat: 42.109147,  Lng: -73.368836),  Route carried "on" structure: City street ,  Year Built: 2020,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 4,200 (year 2017),  Truck Traffic: 6%,  Design Load: HL 93,  Features Intersected: WATER SCHENOB BROOK,  Facility Carried by Structure: HWY BERK SCHOOL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S10020AT8DOTNBI,  Location: 400' S OF RANNAPO ROAD (Lat: 42.055044,  Lng: -73.333772),  Route carried "on" structure: Alternate State highway 7A,  Year Built: 2005,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 1,293 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,369 (year 2033),  Design Load: HS 25 or greater,  Features Intersected: WATER KONKAPOT RIVER,  Facility Carried by Structure: ST 7 A/ASHLEY FLS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.884,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.3m (27.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.3m (142.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 0.0m,  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.50m (14.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $2,292,000,  Roadway Improvement Cost: $230,000,  Total Project Cost: $3,439,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S10023BDDDOT634,  Location: 1.4 MI N OF CONN SL 51.49 (Lat: 42.065000,  Lng: -73.338333),  Route carried "on" structure: Alternate State highway 7A,  Year Built: 2014,  Status: Open,  Structure Length: 3.37m (11.06ft),  Average Daily Traffic: 129 (year 2018),  Truck Traffic: 1%,  Design Load: HL 93,  Features Intersected: RR HRR,  Facility Carried by Structure: ST 7 A/ASHLEY FLS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.131,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S1002402HMUNNBI,  Location: 2 MI EAST OF ROUTE 7 (Lat: 42.109061,  Lng: -73.315897),  Route carried "on" structure: City street ,  Year Built: 1939,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,810 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,421 (year 2033),  Design Load: H 15,  Features Intersected: WATER IRONWORK BROOK,  Facility Carried by Structure: HWY COUNTY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $1,301,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $1,952,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: S1002902FMUNNBI,  Location: 2.2 MI E OF RTE 7 (Lat: 42.123700,  Lng: -73.307158),  Route carried "on" structure: City street ,  Year Built: 1949,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,293 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,421 (year 2032),  Design Load: H 15,  Features Intersected: WATER IRONWORK BROOK,  Facility Carried by Structure: HWY COUNTY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 34.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $358,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $538,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S1003108BMUNNBI,  Location: 900' EAST OF ROUTE 41 (Lat: 42.109444,  Lng: -73.403889),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 3,788 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 790 (year 2033),  Design Load: H 20,  Features Intersected: WATER DRY BROOK,  Facility Carried by Structure: HWY BERK SCHOOL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.6m (21.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Inventory Rating: 69.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $363,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $545,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S1003208CMUNNBI,  Location: 770' S OF INT W/KELSEY RD (Lat: 42.064636,  Lng: -73.400950),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 129 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 158 (year 2033),  Design Load: H 10,  Features Intersected: WATER SCHENOB BROOK,  Facility Carried by Structure: HWY FOLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 47.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: Febuary 2022,  Underwater Inspection Date: October 2020,  Bridge Improvement Cost: $325,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $488,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: S1003308DMUNNBI,  Location: AT INT. WITH GIBERSON RD (Lat: 42.110997,  Lng: -73.393303),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 3,788 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 790 (year 2033),  Design Load: H 20,  Features Intersected: WATER WILLARD BROOK,  Facility Carried by Structure: HWY BERK SCHOOL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Inventory Rating: 61.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $452,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S1003409QDOTNBI,  Location: 1.9 MI N OF CONN SL (Lat: 42.074656,  Lng: -73.333353),  Route carried "on" structure: US 7,  Year Built: 1959,  Status: Open,  Structure Length: 7.71m (25.30ft),  Average Daily Traffic: 4,512 (year 2015),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,476 (year 2031),  Design Load: H 20,  Features Intersected: WATER HOUSATONIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.032,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 37.2m (122.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.80m (25.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2020,  Underwater Inspection Date: November 2021,  Bridge Improvement Cost: $4,780,000,  Roadway Improvement Cost: $479,000,  Total Project Cost: $7,171,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S1003509PDOTNBI,  Location: 0.4 MI N OF CONN SL (Lat: 42.053200,  Lng: -73.326614),  Route carried "on" structure: US 7,  Year Built: 1959,  Status: Open,  Structure Length: 3.49m (11.45ft),  Average Daily Traffic: 7,437 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,476 (year 2031),  Design Load: H 20,  Features Intersected: WATER KONKAPOT RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.576,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,131,000,  Roadway Improvement Cost: $214,000,  Total Project Cost: $3,197,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Discuss Sheffield, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.