  • National Bridge Inventory (NBI) Statistics
  • 25Number of bridges
  • 623ft / 190mTotal length
  • $55,875,000Total costs
  • 375,943Total average daily traffic
  • 79,387Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Shorter
  • No street view available for this location

New bridges in Shorter, AL - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 171960-1969
  • 31980-1989
  • 11990-1999
  • 12000-2009
  • 22010-2019
Reconstructed bridges in Shorter, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 12000-2009
  • 02010-2019
  • 12020-2022
Average Bridge Daily Traffic in Shorter, AL
Average Bridge Truck Traffic in Shorter, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.9%Very good
  • 29.4%Good
  • 23.5%Satisfactory
  • 41.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.8%Excellent
  • 35.3%Good
  • 47.1%Satisfactory
  • 5.9%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.8%Excellent
  • 41.2%Good
  • 47.1%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Excellent
  • 12.5%Very good
  • 43.8%Good
  • 18.8%Satisfactory
  • 12.5%Fair
Find on map >>   Show street view

Structure Number: 7264,  Location: 1.2 MI.N.OF MONTG.CO.LINE (Lat: 32.386567,  Lng: -85.994539),  Route carried "on" structure: County highway ,  Year Built: 1961,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 853 (year 2003),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,279 (year 2028),  Design Load: HS 20,  Features Intersected: I85,  Facility Carried by Structure: CO RD 0097
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.628,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,744,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $1,918,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7265,  Location: 2.2 MI.N.OF MONTG.CO.LINE (Lat: 32.395225,  Lng: -85.980331),  Route carried "on" structure: Interstate 85,  Year Built: 1961,  Status: Open,  Structure Length: 13.47m (44.19ft),  Average Daily Traffic: 18,020 (year 2013),  Truck Traffic: 21%,  Average Future Daily Traffic: 23,749 (year 2033),  Design Load: HS 20,  Features Intersected: CUBAHATCHEE CRK.RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.310,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 14.28m (46.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,231,000,  Roadway Improvement Cost: $323,000,  Total Project Cost: $3,554,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7266,  Location: 2.2 MI.N.OF MONTG.CO.LINE (Lat: 32.395039,  Lng: -85.980169),  Route carried "on" structure: Interstate 85,  Year Built: 1961,  Status: Open,  Structure Length: 13.47m (44.19ft),  Average Daily Traffic: 18,020 (year 2013),  Truck Traffic: 21%,  Average Future Daily Traffic: 23,749 (year 2033),  Design Load: HS 20,  Features Intersected: CUBAHATCHEE CRK.RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.310,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 14.28m (46.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,231,000,  Roadway Improvement Cost: $323,000,  Total Project Cost: $3,554,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7267,  Location: 2.5 MI.N.OF MONTG.CO.LINE (Lat: 32.398206,  Lng: -85.975203),  Route carried "on" structure: Interstate 85,  Year Built: 1961,  Status: Open,  Structure Length: 12.92m (42.39ft),  Average Daily Traffic: 18,020 (year 2013),  Truck Traffic: 21%,  Average Future Daily Traffic: 23,749 (year 2033),  Design Load: HS 20,  Features Intersected: CUBAHATCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.833,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 13.75m (45.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,110,000,  Roadway Improvement Cost: $311,000,  Total Project Cost: $3,421,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7268,  Location: 2.5 MI.N.OF MONTG.CO.LINE (Lat: 32.398050,  Lng: -85.974944),  Route carried "on" structure: Interstate 85,  Year Built: 1961,  Status: Open,  Structure Length: 12.92m (42.39ft),  Average Daily Traffic: 18,020 (year 2013),  Truck Traffic: 21%,  Average Future Daily Traffic: 23,749 (year 2033),  Design Load: HS 20,  Features Intersected: CUBAHATCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.833,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 47.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 13.75m (45.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,110,000,  Roadway Improvement Cost: $311,000,  Total Project Cost: $3,421,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7269,  Location: SHORTER EXIT (Lat: 32.406867,  Lng: -85.958169),  Route carried "on" structure: State highway 138,  Year Built: 1961,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 3,480 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,246 (year 2033),  Design Load: HS 20,  Features Intersected: I85
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.299,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,056,000,  Roadway Improvement Cost: $206,000,  Total Project Cost: $2,262,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 731,  Location: 2.9 MI E 110 (Lat: 32.302547,  Lng: -85.958178),  Route carried "on" structure: County highway 2,  Year Built: 1961,  Status: Posted for load,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 280 (year 1988),  Truck Traffic: 1%,  Average Future Daily Traffic: 300 (year 2041),  Design Load: H 15,  Features Intersected: LINE CREEK RELIEF,  Facility Carried by Structure: MACON CO. ROAD
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 37.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 11.28m (37.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $1,856,000,  Roadway Improvement Cost: $186,000,  Total Project Cost: $2,042,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7556,  Location: 3.27 MI.S.OF SHORTER EXIT (Lat: 32.381997,  Lng: -86.007128),  Route carried "on" structure: Interstate 85,  Year Built: 1962,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 18,020 (year 2013),  Truck Traffic: 21%,  Average Future Daily Traffic: 23,749 (year 2033),  Design Load: HS 20,  Features Intersected: LINE CRK. RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.383,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,643,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $1,807,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7861,  Location: 0.58 MI.N.OF SHORTER EXIT (Lat: 32.410728,  Lng: -85.953014),  Route carried "on" structure: Interstate 85,  Year Built: 1963,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 35,580 (year 2013),  Truck Traffic: 22%,  Average Future Daily Traffic: 46,893 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.397,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 52.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $2,058,000,  Roadway Improvement Cost: $206,000,  Total Project Cost: $2,264,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8199,  Location: 3.18 MI.N.OF SHORTER EXIT (Lat: 32.426925,  Lng: -85.907978),  Route carried "on" structure: Interstate 85,  Year Built: 1963,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 30.30m (99.41ft),  Average Daily Traffic: 17,790 (year 2013),  Truck Traffic: 22%,  Average Future Daily Traffic: 23,446 (year 2033),  Design Load: HS 20,  Features Intersected: CALEBEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.921,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.2m (43.3ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 28,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 30.30m (99.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $9,351,000,  Roadway Improvement Cost: $935,000,  Total Project Cost: $10,286,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 82,  Location: 3.18 MI.N.OF SHORTER EXIT (Lat: 32.426725,  Lng: -85.907767),  Route carried "on" structure: Interstate 85,  Year Built: 1963,  Status: Open,  Structure Length: 30.30m (99.41ft),  Average Daily Traffic: 17,790 (year 2013),  Truck Traffic: 22%,  Average Future Daily Traffic: 23,446 (year 2033),  Design Load: HS 20,  Features Intersected: CALEBEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.921,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 28,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 30.30m (99.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $6,856,000,  Roadway Improvement Cost: $686,000,  Total Project Cost: $7,542,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8201,  Location: 4.1 MI. N SHORTER EXIT (Lat: 32.431067,  Lng: -85.890675),  Route carried "on" structure: Interstate 85,  Year Built: 1963,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 17,090 (year 2013),  Truck Traffic: 22%,  Average Future Daily Traffic: 22,524 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.364,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $907,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $998,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8203,  Location: 5.55 MI.N.SHORTER EXIT (Lat: 32.436869,  Lng: -85.872358),  Route carried "on" structure: County highway 9,  Year Built: 1964,  Status: Open,  Structure Length: 9.88m (32.41ft),  Average Daily Traffic: 826 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,101 (year 2028),  Design Load: HS 20,  Features Intersected: I-85
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.635,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.81m (35.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,076,000,  Roadway Improvement Cost: $208,000,  Total Project Cost: $2,284,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13701,  Location: AL229 AND I85 INTERCHANGE (Lat: 32.427658,  Lng: -85.898833),  Route carried "on" structure: State highway 229,  Year Built: 1985,  Status: Open,  Structure Length: 11.46m (37.60ft),  Average Daily Traffic: 6,880 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 8,716 (year 2033),  Design Load: HS 20,  Features Intersected: I85
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.135,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 31.7m (104.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 67.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 12.33m (40.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,890,000,  Roadway Improvement Cost: $389,000,  Total Project Cost: $4,279,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13702,  Location: 0.8 MI N.OF I85 (Lat: 32.437847,  Lng: -85.903289),  Route carried "on" structure: State highway 229,  Year Built: 1985,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 6,880 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 8,716 (year 2033),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.426,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $989,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $1,088,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15004,  Location: SEC 9 T21N R18E (Lat: 32.460000,  Lng: -85.956667),  Route carried "on" structure: County highway 4,  Year Built: 1957,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 300 (year 2007),  Truck Traffic: 30%,  Average Future Daily Traffic: 350 (year 2032),  Design Load: H 15,  Features Intersected: TUMKEHATCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 52.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $419,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $461,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15474,  Location: SEC 24 T17N R20E (Lat: 32.421667,  Lng: -86.010000),  Route carried "on" structure: County highway 132,  Year Built: 1991,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 20 (year 2004),  Average Future Daily Traffic: 30 (year 2032),  Design Load: HS 20,  Features Intersected: GOODWATER CREEK,  Facility Carried by Structure: Rigsby Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.23m (20.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,282,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,410,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19383,  Location: .8 MILES SOUTH OF US 80 (Lat: 32.367394,  Lng: -85.862517),  Route carried "on" structure: County highway 85,  Year Built: 2005,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 118 (year 2015),  Truck Traffic: 4%,  Average Future Daily Traffic: 178 (year 2035),  Design Load: H 15,  Features Intersected: THOBOLOCCO BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $328,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $361,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 2074,  Location: 6.5 MILES EAST SR110 (Lat: 32.311989,  Lng: -85.933056),  Route carried "on" structure: County highway 9,  Year Built: 2014,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 268 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 300 (year 2035),  Design Load: HS 20,  Features Intersected: OLD TOWN CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.8m (22.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.58m (15.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $942,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,036,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20741,  Location: 6.2 MILES SO. HWY80W (Lat: 32.313567,  Lng: -85.917006),  Route carried "on" structure: County highway 9,  Year Built: 2014,  Status: Open,  Structure Length: 7.31m (23.98ft),  Average Daily Traffic: 268 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 300 (year 2035),  Design Load: HS 20,  Features Intersected: OLD TOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.013,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.8m (22.3ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 61.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.34m (27.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,715,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $1,887,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7264,  Location: 1.2 MI.N.OF MONTG.CO.LINE (Lat: 32.386567,  Lng: -85.994539),  Route carried "under" structure: Interstate 85,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 36,040 (year 2013),  Truck Traffic: 21%,  Features Intersected: I85,  Facility Carried by Structure: CO RD 0097
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 31.661,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 7269,  Location: SHORTER EXIT (Lat: 32.406867,  Lng: -85.958169),  Route carried "under" structure: Interstate 85,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 36,040 (year 2013),  Truck Traffic: 21%,  Features Intersected: I85,  Facility Carried by Structure: AL 138
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 35.742,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 7558,  Location: 1.48 MI.N.OF SHORTER EXIT (Lat: 32.416981,  Lng: -85.942956),  Route carried "under" structure: Interstate 85,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 35,580 (year 2013),  Truck Traffic: 22%,  Features Intersected: I85,  Facility Carried by Structure: CO.RD. 40
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 37.609,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 8203,  Location: 5.55 MI.N.SHORTER EXIT (Lat: 32.436869,  Lng: -85.872358),  Route carried "under" structure: Interstate 85,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 34,180 (year 2013),  Truck Traffic: 22%,  Features Intersected: I-85,  Facility Carried by Structure: CO RD #9
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 44.635,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 13701,  Location: AL229 AND I85 INTERCHANGE (Lat: 32.427658,  Lng: -85.898833),  Route carried "under" structure: Interstate 85,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 35,580 (year 2013),  Truck Traffic: 22%,  Features Intersected: I85,  Facility Carried by Structure: AL229
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 41.931,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)